Mine compliance for IBM company in India.
34A. Digital Aerial Images of mining Lease Area | Mineral Conservation and Development (Amendment) Rules, 20

Mine compliance for IBM company in India. 34A. Digital Aerial Images of mining Lease Area | Mineral Conservation and Development (Amendment) Rules, 20

(1) Every lessee having— (a) an annual excavation plan of one million tone or more in a particular year; or (b) leased area of fifty hectare or more. shall carry out a drone survey of the leased area and up to hundred meters outside the lease boundary in the month of April or May every year and submit the processed Cover data of Mine.

Compulsory?Mine area Covered.

  • Actual Excavation of Mineral and waste..
  • Mineral Storage.
  • Sub grade dumps.
  • Waste dump.
  • Backfilled, Reclaimed and Rehabilitation area.
  • Afforestation.
  • Green belt.
  • Mineral Stacks.
  • Utilities such as plant, buildings etc.
  • Lease boundary along with other surface feature details.
  • Active Pit Area.

Output Data Format:

  • Raw Photographs (.JPEG).
  • Ortho Mosaic Image ( .tiff- geo tiff). and?in 200 m x 200 m grid tiles.
  • Digital Terrain Model (3D) .dwg/ Point Cloud.
  • Contours .dwg (geo tagged).
  • GCP data .dwg and MS-Excel.
  • Lease boundary pillar co-ordinates .dwg and MS-Excel.
  • KML/KMZ Google File.
  • GIS File in .shp Format.

Pre-Requisites Permissions:

The agency shall ensure that the all necessary permissions and clearances for drone operations are obtained from respective authorities wherever applicable such as, including, but not restricted to the following.

  • Directorate General of Civil Aviation (DGCA).
  • Ministry of Defense (MoD).
  • Ministry of Home Affairs (MHA).
  • Air Traffic Control (ATC).
  • Local Police and District Administration etc.

Drone Operation for Data Acquisition:?

  • Certified Mine Surveyor Certificate from DGMS (with proof of employment).
  • Drone Pilot Certificates/ Licenses.
  • DGCA Approved Survey grade Drone with?DAN No?and?OAN?etc.
  • Every flight should be recorded in the digital sky platform.

The recommended minimum overlap shall be: Mine compliance for IBM company in India.?

  • 75% frontal and 60% side overlap in general cases.
  • 85% frontal and 70% side overlap for forests, dense vegetation and fields.
  • 85% frontal overlap for single track corridor mapping.
  • 60% side overlap if the corridor is acquired using two flight lines.
  • Accuracy of GCP less than 3cm.
  • High resolution (20MP or above) RGB digital camera.


Yes! I am Interested


Monthly Return:

Mine compliance for IBM company in India. We have expert team of Geologist, Mining Engineer and DGMS Certified Surveyor for IBM Compliances. Online submission of Returns under Rule 45 of MCDR 1988. IBM Monthly Return Compliances | IBM annual Return Compliances Consultancy Services Provider Company in India. IBM Compliances Consultant. Mineral Conservation and Development (Amendment) Rules, 2021.

Annual Return:

?We have expert team of Geologist, Mining Engineer and DGMS Certified Surveyor for IBM Compliances. Online submission of Returns under Rule 45 of MCDR 1988. IBM Compliances Consultant |Monthly Return, annual Return Consultancy Services Provider Company in India. Online submission of Returns under Rule 45 of MCDR 1988, IBM Monthly Return Compliances | IBM annual Return Compliances Consultancy Services Provider Company in India. IBM Compliances Consultant. Mineral Conservation and Development (Amendment) Rules, 2021.


要查看或添加评论,请登录

RAYNAS INFRA PROJECTS的更多文章

社区洞察

其他会员也浏览了