Maximizing Profits, and Cash Flow Positive from the Common Big Picture 3i Macro Key End Result Areas' Maximized Performance Metrics
Sidney Angsanto
OPTIMUM "OPERATIONS" PERFORMANCE RESULTS CAPABILITY Mgt Coach. Analysis, & Strategist for Org'l Alignment (KPIs To-Fulfill, KPMs) by Organizing, Orchestrate & Oversee. & KPPs to improve via S.M.A.R.T. CASCADED KRAs' KPIs
BEFORE sharing our FRAME OF REFERENCE on this Topic intended for Food Manufacturing Industries, INFORMATION TECHNOLOGY is required at least the very basic that can give an ALMOST REAL TIME, and ACCURATE INFORMATION particularly the Alpha - Numerics (KRAs - KPIs PARAMETERS vs Performance Metrics) with Analytics that are Auto Generated from All Raw Transactional Data Single Entry Encoding per Kind such as Sales Orders, Receiving, Issuances, and related. And all the rest will be auto computed by the Internet Platforms from Computers / Laptops, Mobile Phones (Android, iOS), Tablets / iPad mini.
Conservatively (investment wise), may use Excel Linked Files using Codes (VBA), Macros, Conditional Formatting, and other features. May also use Google Sheets Linked (codes) for Operating and Management Tools.
For Field Documentation such as Videos and Images, may use Viber for Compliance and Analysis.
CCTV for Factory, DC and other Business Centers for Comparative Analysis to Reports, KRAs - KPIs Plans and Developments from time to time. GPS for Delivery Trucks.
Illustrations
SAMPLE TOOLS
Above are General Sample Tools (best if have the detail KPIs vs Actual Performance Metrics), and are auto generated by the internet platforms from the Cascaded Systems of KPIs starting from Micro Units Users' Interface).
KPI PERFORMANCE METRICS in Amounts | Quantities per SKU, %, Time and Motion, Usage Mileages including electricity & water, and other measurable values. The WHY & WHAT Column as shown in the Table above are for WHYs (can't achieve, the big short), and What To Do base on the Analytics for the Strategies, Techniques that can be applied in order to minimize problems.
ABOVE TOOL #1 DAILY CUT-OFF OF SCM KPIS OF YESTERDAY
Savings other than (1) redundancy in encoding, making reports, and related. But are Crucially intended for (2) RE-ALIGNING among the concerned employees, (3) Crucial Reports with cut off time for (4) COORDINATION & COOPERATION or 3Cs, (5) OPERATIONS MANAGEMENT STRATEGIES COLLABORATION through ORCHESTRATING on CASCADING KPI-SMART (Specific, Measurable, Achievable, Relevant, Time Bound) PLANNING, & (6) DEVELOPMENTS even the In - Progress for Tactics to Achieve Strategies somehow as well as to prevent untoward or minimize the Domino Effects, (7) also for Effective Decision Makings, Enhancing Operational Performances, Prevents or Minimizes the Domino Effects (big losses and may affect the Business Relationship with the Customers) most especially.
In this Issue, we will give only the Summary Descriptions of EACH OF THE 3i MACRO KEY END RESULT AREAS (KRAs) with their Key Performance Indicators (KPIs) as to HOW they are Directly Contributing to the Maximizing Profits, and Cash Flow Positive. Increase in Revenues may help though not our especially.?
We will be sharing INSIGHTS on "How To Maximize ..." in the succeeding Materials (Articles, YouTube, and Other Tools)
The KRAs - KPIs PARAMETERS of the MANAGEMENT (Collaboration on Cascaded Orchestration using KPI-SMART Tools for Strategies, as well as in the Development even in the process for Preventive Management), and their OPERATIONS are usually achievable since KPIs Parameters are established from the developed Sets of Operating Standards (using KPI-SMART 3i Tools) with Strict Considerations to the Capability 3i Components in each Stage of the Process Flow to Maximize its Quality Yields Parameters over minimal time usage, Minimize Operation Costs, and the Ability to Achieve more or a bit less the KPI targets. The Command Chain, Cross Sectional and Functional Accountability Structure and Comprehensive Job Descriptions are based on these Standards.
Each Stage (What, Who, When, Where, and How. With the Immediate Superior's Checking to Ensure) using KPI-SMART (Specific, Measurable, Achievable, Relevant & Time Bound) as Method, and its 3i (Integrated, Interconnected & Interrelated) COMPONENTS such as (1) Almost Real Time and Accurate Information particularly the Alpha - Numerics (KRA-KPI) with Analytics and Tools for the Management, as well as the Operations; (2) Physical Activities particularly in the Centralized Factory Plants with Logistics, Distribution Centers including Logistics, and SBUs (Small Business Units); (3) The Management Collaboration on Business Reviews Analysis, and the Orchestration of Cascading KPI-SMART Planning to Developments in Progress Overseeing, (4) Related.
KRAs - KPIs PARAMETERS Capability is a Standard of Operating Procedure, Methods, Techniques, and related for each Specific Stage (and or Kind of Transaction) of the Process Flow of the Macro, and down to the Micro Units Operations. It can be?Physical ACTIVITIES at what standard Operating hours – schedules cut off time, Physical Process Flow Mapping Lay-outs with Locators including FIFO Rotation and Replenishment (with Shelf Life Parameters), and other related at Centralized Factory Plants, Distribution Centers and SBUs), Software DB to MIS & Tools for both Management Collaboration for Orchestrating of Cascading KPI-SMART Planning and Developments, as well as its Operations, Post Guides, Checklists, Tally Sheets, Transmittal Log Books, and Other Accountability Components. And all these are stated and signed with date and time in ones ROLES’ Comprehensive Job?descriptions, as well as in the Manual. For their immediate Superiors, are the Ensuring Part with cut off time to would prevent, and or minimize the Domino Effects.??
Cascaded KRAs – KPIs for each stage of the Process Flow with cut off time to achieve the Macro Key End Results at the End of the day.??
To note that each one of the MACRO KRAs or OKRs - KPIs are Developed or Established from the Cascaded KRAs – KPIs PARAMETERS that brings about the COST EFFECTIVE (Mirriam Webster: producing good results without costing a lot of money), EFFICIENT, and Significantly PRODUCTIVE (Mirriam Webster: having the quality or power of producing especially in abundance) per Stage From Micro Units?to Macro.??
These BENCHMARK Parameters are in the form of Alpha-Numerics or KRA – KPI Range of Acceptable Metrics from the initially Simulated Tests (baby scale) of which MATRIX that Yields in abundance with quality at minimum time and effort - which will be Set in the Actual Facilities, or used, applied and related.??
These Simulations are based on KRA KPI-SMART Method for Management?and Operations Tools used.??
A Set of Cascaded KRA -?KPI across the entire Processes to Achieve the Macro Key End Result AREA are breakdown into Two (2) Crucial Parts as shown below??
And everyone based on their Roles are equipped and complied strictly.??
The FREE Insights Sharing on the SALES ORDERS?FULFILLMENT’s KRA - KPIs MAIN EVENT OPERATIONS Standards will be posted soon. So Watch for it.??
Please understand that whatever we share here are not One Size Fit All.?Hopefully somehow can help achieve Maximizing Out the Operations KPIs that would Minimize Costs based on our experiences and Maximize or Optimized Operational Capabilities.?We will appreciate if you can Message us for clarifications, and will get back to you the soonest possible time for FREE that we can improve this issue and probably future ones.
__________________________________________________________________
Maximizing the COMMON BIG PICTURE 3i MACRO KEY END RESULT AREAS or CRITICAL SUCCESS FACTORS' KPIs (KEY PERFORMANCE INDICATORS)?PERFORMANCE METRICS TO MAXIMIZE PROFITS, and CASH FLOW POSITIVE
KEY END RESULT AREA #1 - MAXIMIZING DAILY REVENUES at 90%+ of Customers SALES ORDERS FULFILLMENT (at the Centralized Factory Plants, Distribution Centers, and other Business Units) from the TOTAL SALES ORDERS for the Delivery Dispatch Schedules each day.?
With Load Over Capacity for each Delivery Truck Route Trip at 90% and above. For the balance of less than 10% to be at the extremely minimum due to lack of, or no stocks.
CLUSTERED Drops per ROUTE Trip from a very well studied closest distances yet fastest Drops' ETAs because of less traffic (travel kilometers, & Estimated Time of Arrival) from one drop to another within the Area as well as Nearby ones Standard, as well as the Delivery Dispatch Schedules in connection to travel time / days to and back as lead time.?Sales Orders at Minimum Ordering Quantity / Amount with consideration to Travel distance / time and other operating costs (Travel and Related Operating Costs / Total Sales).?And possibly maximized drops per trip.
Considers distance from Point of Origin Warehouse and Back with ETAs each. Including the Unloading of Drop's Orders Volumes, and other delivery related such as the Documents (required for Collections On Time from the Customers).?
Outright Rejections at Acceptable X% Rate due to Driving conditions (from Analysis - comparative, gap, root causes), and Packaging Carton Boxes Piling Strength. Covers in cost on KPIs for Post Delivery Trips Processes - unloading, sorting and related at the Warehouse.?
In other words, maximizing - out the Sales Deliveries per KPI-SMART Clustered Drops per Trip at lowest costs as possible to bring about maximum gross profits.
MAIN OPERATIONS ACTIVITIES KPIs
The Loading Procedures based on the KPI-SMART (Time and Motion) Operating Standard based on the Capability 3i Components. The Handling per Pallet Drop Goods (Standard interlocked piled with Tag) by Forklift or Lifter from the Picked Area, the Check and Balance (Tally Sheet) Turn - Over between Logistics Driver, and Warehouse Shift In-Charge (goods with corresponding set of documents per drop), the Driver's Helper/s to Loading and Piling inside their Delivery Truck. While Warehouse Helpers goes back to Picked Area to get for the Next Drop or serve the next scheduled Delivery Truck.
All Delivery Trucks with its Drivers & Helpers respectively, the Warehouse Finished Goods and Logistics Staffs strictly comply to the KPI-SMART Action Plans in LOADING & DISPATCHING for each Route Drops Trips per Dock (Gate) according to Set Schedules.
At least an hour before the Start of the set schedules for the Loading and Dispatching Procedures per Dock / Gate, All Ordered Items Per Drops have been completely Picked and Piled per Drop Pallet/s and are QUEUED (according to Schedules of Loading and Dispatching) in the Assigned Gate / Dock # at the WAREHOUSE FINISHED GOODS PICKED AREA. Properly Piled in Interlocking Cases / Carton Boxes with Tags (color coded preferred) on the Pallet. The Bulky and Heaviest are at the Bottom while the Lightest, and Smallest are on the top part. All these Goods on Pallet per Drop are queued per Dock according to FIRST IN, LAST OUT (FILO) Loading Procedure base on Route Drops Trip per Delivery Truck.
All Delivery Documents including the attachments per Route Drops Trip (properly sequenced per Drop, as well as in FILO), the Loading and Dispatching Summary Tally Sheets for the Route Trip are completed. Also, Checked and Balanced by the Warehouse Finished Goods Shift In-Charge against the Goods mentioned above.
Strict Compliance to the Operating Standards set based on KPI-SMART Loading and Dispatching processes by all involved employees will result in minimized operating costs thereby to maximize profits.
To MINIMIZE OPERATIONS COSTS (as well as To Enable the Staffs to be Productive - High Yields with Quality Over Usage of Time and Motion at very minimal movements) at CENTRALIZED FACTORY PLANTs, DISTRIBUTION CENTERS and Other Business Units with their Logistics, have to be in a ...
The Distance between Assembler in a Stage or Section or Stages such as from Warehouse Raw Materials & Supplies to Production Line or from the latter to Warehouse Finished Goods are studied with consideration to Capacity of Spaces Needed in such a way will be enough to fit the transport of Goods with allowance a task with before going to the Next Stage. This way, Time and Motion per Cycle or Batch will be short. And not too much to waste the space. Enough to exert very minimal movements with Standard Volume (interlocking piled) per Handling and Other Physical Activities related.?
If I may say that such Physical Set-Up will result to either big or small Fixed Costs. Depending on how Cost Effective the Positioning is. Some cannot be moved because too big, heavy.
Though there could be variable costs from non-compliance that can be checked from time to time so to bring them back to the Standards.
Cover the GMP (Good Manufacturing Practices), HACCP, 5S, and so on ...?
2. Physical Operating Activities Schedules of Sections & Functions ie: (1) Logistics Route FILO Drops Trips' Loading and Dispatching Checklists, (2) Warehouse Office Staff for Delivery Documents and Picking Lists (Linked from Logistics' Drop Checklist), Helpers particularly for Drops Picking and In-Charge for Checking and Balancing. To Prevent From Overlapping or Waiting / Idle Time, Criss - Cross, and other costly activities.
The Operating Schedules are well studied so when the start of the LOADING AND DISPATCHING Processes per Dock or Gate, there will be no waiting time for the Goods on Pallets per Drop transfer from Picked Area and are Mapped Lay-Out per FILO Drops Pallets Per Delivery Truck, the Delivery Documents and others related are complete and ready.?
3. Other Operations Capability Components related?to Achieve This MACRO KEY RESULT AREAs' KPIs.??
SUPPORT ACTIVITIES KRAs-KPIs to make the MAIN EVENT a success (not perfect but at least Cost Effective, Efficient and More Productive)
90% + Sales Orders Stocks are PREPARED per Drop Pallets with Tags, and are Queued accordingly in FILO (First In, Last Out) and are properly piled inter-lockingly. for each Route Trip at Warehouse Finished Goods Picked Area Dock Assigned. In the big picture, Queued according to Loading and Dispatch Schedules. As well as the Conditioned Delivery Trucks,?and Delivery Documents. Including Handling Equipment for turn over from Picked Area to Loading into Trucks. All are checked and validated by Warehouse Shift In-Charge at least One Hour or 2 before the start of the Loading and Dispatching Procedures.
SALES Department - Customers
At Least (could be more depending on Areas' distances, Situations) 3to 4 working days or Weekly Ordering Lead Time from Standard Set of REGULAR Route Trips Delivery DISPATCH SCHEDULES. By Allocations of Stocks from Inventory Flow Balance.
LOGISTICS MANAGEMENT & OPERATIONS
WAREHOUSE FINISHED GOODS MANAGEMENT & OPERATIONS
Compliance of SOP Policies
Activities Schedules as KPI-SMART Methods such as (a) FIFO Rotation and Replenishments, (b) Shift Accountability Turn-Over, (c) Drops Picking, (d) Receiving of Partial Transfers, and so on.
Physical Mapping Lay-Out with Locators base on Process Flow including FIFO Rotation & Replenishments, and others related. Each SKU has its fixed slot per Column in the Racking System. At least 3 to 4 levels to be Cost Efficient (Forklift's pivoting may eat up the 2 to 3 levels). Ground Level are the Oldest Stocks but still in the acceptable Shelf Life Parameters. IN ASSIGNING FIXED Column for SKU in Specific RACK, SKUs that are Fast Moving (Regular Items with Volume particularly) are nearest the Warehouse's Issuance Area to DROPS PICKED AREA, so the Drops' Pickers (Warehouse Helpers) do not need to have the hard time to go farthest most of the time. So is the Forklifts, Lifters, Push Carts and Rack (each shelf with edge stopper as lock) Carts. While Non Moving are in Rack nearest receiving area from Production Partial Transfers but need to dispose (for sale if still good and still in Stocking shelf life parameter).
No Racking System, Physical Ground Mapping Lay-Out with Rotation and Replenishments - same format as to Columns for SKUs while Rows per Column for Rotation and Replenishments (Pallets Positioning). Columns nearest issuance area for Fast with Volume SKUs. First Row for newest (near receiving area) to Last Row for oldest (nearest issuance area).
Inventory Physical Tallying Sheet / e-sheet (excel or google sheet may do) to have the same format or sequences as Physical Mapping Lay-Out with Locators so Shifts Turn-Over will be a lot Cost Effective per minute (# of Goods on Pallets with Tags).
Inter-Locking Piling Standards with Tags (Color Coded) Per Pallet. Possibly No Loose Packs. ENABLE TO FACILITATE the ACCOUNTABILITY SHIFT TURN-OVER Tallying per Pallet SKUs. In Number of Pallets SKU per Minute.
TAGs Contents are very crucial to prevent Wrong Pick-Up, Spoilage, and other related abnormalities. Also, can easily be Tracked (mapping board, e-sheets), and Position to where it / those to be put or placed.
Uses INVENTORY MANAGEMENT EOQ (Economical Ordering Quantity) with Close Coordination with Sales & Marketing Heads for Stock Allocation for Promotional Campaigns with Lead Time, or RE-ORDERING POINT (Production Request) to Production Department.
EOQ is very crucial to ... (1) minimizing loss of opportunity to sell, (2) minimizing of the rejects, spoilages due to so much over - stocking (expired), also occupying so much spaces, damages, (3) minimize Cost of Inventories and warehouse stocking spaces, (4) financial savings should have sold the inventories that are not due yet for payments to suppliers with credit terms, other than the mentioned ones above.
Provides Inventory Flow with # of days supply (auto color code for Re-Ordering Point or Critical) Soft Copies to Sales Department Head, and Production Department. Format - starting with Regular (Fast Moving) Categories, then to Slow Moving. Preferably with Shelf Life Parameters.
Close Coordination with SALES, and LOGISTICS for Deliveries related, also with PRODUCTION.
PRODUCTION MANAGEMENT & OPERATIONS
Compliance to Operating Standards such as ...
Physical Mapping Lay-Out with Locators based on Process Flow per Line Assembly, Working Table Lay-Out with consideration to Distance, and Proper Posture (minimal movements of the body / hand movements only as possible) of the Worker or Workers, and Others.
Production Team Orchestration and Cascading KPI-SMART (Schedules, ...) Lot - Batches Planning and Developments Cut-Off Time that prioritizes Products (SKUs - Stocks Keeping Units) base on Regular / Fast Moving Items with Volume particularly in the Artisans Industry in consideration of the momentum and stabilization time needed to establish the Speed with Quality Yields or Outputs. As well as how many hours, shifts or days for the LOT (# of Batches) in order to cover for the Stabilization Cost on both the Labor and Materials to be spread to Preparation or Pre-Operations, Actual Activities and the Post Operations.?Pre-Operation or Production Standard Parameters are complied so to prevent (1) waiting or idle time due to lack or missing materials; (2) wastage, rejects to be minimized during Actual Production Activities.
For Assembly Line, the distance between Assembly (internal supplier - customer) to be by Big Tray with proper piling, or Stockable Trays of a Set, Crate, Rack Cart or something so no need for Production Helper to transfer. Schedule of Internal Customer is late by an hour or less to prevent waiting time.
Proper or Right Posture of Workers using Working Table (and Chair if seated) can definitely make them productively effective especially for long hours. Therefore, Labor and other Costs per hour will be minimized.
Also, Production Workers and Helpers who are capable to achieve the parameters (quota) set for each assembly will be considered. Developments are shown on-line (internet) per hour for preventive or minimize problems especially the domino effects.
Covers in the KPI-SMART Planning and Developments (e-Tools like google sheets where can be overseen from time to time in order to ensure and prevent untoward especially domino effects which are so costly) are the PRE-OPERATIONS to ensure Production Workers can start on time where all materials are complete and in place. As well as the other facilities are ready for a smooth and cost effective and efficient one. And as well as in the POST OPERATIONS for sanitation, hygiene, and to have a healthy facilities. To prevent idle, waiting, multiple handling, and so on.
Close Coordination with WAREHOUSE FINISHED GOODS and WAREHOUSE RAW MATERIALS & SUPPLIES
WAREHOUSE RAW MATERIALS & SUPPLIES MANAGEMENT & OPERATIONS
Compliance of SOP Policies
Activities Schedules as KPI-SMART Methods such as (a) FIFO Rotation and Replenishments, (b) Receiving of Items from Suppliers' Deliveries, (c) Shift Accountability Turn-over, (d) Picking for Production Needs, and so on.
Physical Mapping Lay-Out with Locators base on Process Flow including FIFO Rotation & Replenishments, and Other related. Each SKU has its fixed slot per Column in the Racking System. At least 3 to 4 levels to be Cost Efficient (Forklift's pivoting may eat up the 2 to 3 levels). Ground Level are the Oldest Stocks but still in the acceptable Shelf Life Parameters. IN ASSIGNING FIXED Column for SKU in Specific RACK, SKUs that are Fast Moving (Regular Items with Volume particularly) are nearest the Warehouse's Issuance Area to DROPS PICKED AREA, so the Drops' Pickers (Warehouse Helpers) do not need to have the hard time to go farthest most of the time. So is the Forklifts, Lifters, Push Carts and Rack (each shelf with edge stopper as lock) Carts. While Non Moving are in Rack nearest receiving area from Production Partial Transfers but need to dispose (for sale if still good and still in Stocking shelf life parameter).
No Racking System, Physical Ground Mapping Lay-Out with Rotation and Replenishments - same format as to Columns for SKUs while Rows per Column for Rotation and Replenishments (Pallets Positioning). Columns nearest issuance area for Fast with Volume SKUs. First Row for newest (near receiving area) to Last Row for oldest (nearest issuance area).
Inventory Physical Tallying Sheet / e-sheet (excel or google sheet may do) to have the same format or sequences as Physical Mapping Lay-Out with Locators so Shifts Turn-Over will be a lot Cost Effective per minute (# of Goods on Pallets with Tags).
Inter-Locking Piling Standards per Pallet with Tags
Uses INVENTORY MANAGEMENT EOQ (Economical Ordering Quantity) with Close Coordination with Production and Purchasing Department for RE-ORDERING POINT. Provides Inventory Flow with # of days supply (auto color code for Re-Ordering Point or Critical) Soft Copies to Purchasing Department Head, and Production Department. Format - starting with Regular (Fast Moving) Categories, then to Slow Moving. Preferably with Shelf Life Parameters.
Close Coordination and Cooperation with PRODUCTION, also with PURCHASING
QA MANAGEMENT & OPERATIONS
Product Preservation Standard - Quality Inspection Program for Accountability, minimizes rejects upon receiving, and others related.
Product Recall System that can be processed at very minimal time (very few minutes) for Accountability of both in the Company, and at the Customers side.
R&D MANAGEMENT & OPERATIONS
To continuously improve the Products
To Develop New Quality Products for Launching (Marketing campaigns)
领英推荐
PURCHASING MANAGEMENT
Daily Close MONITORING of Inventory Flow with EOQ or Re-Ordering Point, Coordination and Cooperation with WAREHOUSE RAW MATERIALS & SUPPLIES MANAGEMENT
Uses Re-Ordering Point or EOQ.
Have at least 3 Suppliers for Quality Items delivered, After Purchases Services, Competitive Prices, Credit Terms, and Limits.
SUPPLY CHAIN MANAGEMENT
Weekly SUPPLY CHAIN MANAGEMENT Committee Collaboration Analysis Meeting for ...
(1) Gross Sales Order Fulfillment Targets vs Performance Metrics, Gap Analysis and What can be done that can be applied moving forward to narrow down the variances
# of Total Sales Orders To Fulfill, Amount, Percentage Rate; Outright Rejects, Amount, Percent Rate;
(2) Unserved due to No Stock, loss of opportunity amount and rate; (3) Underserved, loss of opportunity amount and rate; (4) Sales Profits per Customers from Sales, Returns, Discounts, and Other costs; (5) Logistics compliance of Customers' Delivery Documents Requirements for Collection; and so on.
2. Current Week's (Cut-Off) Group Orchestration of Cascading KPI - SMART Planning and Developments on a day to day Overseeing for continuous improvement in achieving the daily average KPIs set
Sales Orders To Fulfill for each day of the week for Centralized Factory Plant, each Distribution Centers and Other Business Centers (Dealers, Retailers)
Warehouse Finished Goods' Stocks Allocation and Requirements from Production vs the Sales Requirements per Schedules
Logistics conditioned Delivery Trucks Inventory including 3rd Parties vs Targets
Production Requirements from Warehouse Raw Materials
Warehouse Raw Materials Requirements from the Suppliers c/o Purchasing.
Purchasing Requirements' Budgets from Finance.
3. DAILY Cut-Off Time Remote Overseeing the Centralized Factory Plants with Logistics / Distribution Centers / SBUs, Analysis, Course of Actions to prevent or minimize losses and sales opportunity loss.
Finance & Accounting
Weekly SCM Committee Collaboration Analysis Reports on
KEY END RESULT AREA # 2 - INCREASE SALES From Existing Customers, and Potential Markets
KEY END RESULT AREA # 3 - Collections On Time at 90%.
KEY END RESULT AREA # 4 - MAXIMIZING Gross Profits at CENTRALIZED FACTORY PLANTS with LOGISTICS from Cost Effective (Mirriam Webster: producing good results without costing a lot of money), Efficient and more Productivity
Based on experiences, not only achieving the highest Sales Orders Fulfillment, and Load Over Capacity per Delivery Trucks Rates that Matters to the Bottom Lines, but as well as Where most of the COST SAVINGS can get, and its from here which are directly contributing to Maximizing Profits, and Cash Flow Positive if will not be spent on other Operating Expenses, and especially not for Capex.
Comparative and Gap Analysis, and Strategies - Amount, %; Qty, %; KPI Parameters vs Metrics, %; and other crucial measurements.
PLANTS - KPIs PERFORMANCE Metrics with Analytics?
Gross Profit from Net of Revenues?
KEY END RESULT AREA # 5 - MAXIMIZING GROSS PROFITS at DISTRIBUTION CENTERS / BUSINESS UNITS with LOGISTICS from Cost Effective, Efficient and more Productivity (Mirriam Webster -having the quality or power of producing especially in abundance)
Gross Profit from Net of Revenues?
KEY END RESULT AREA # 6
COMPETITIVE SUPPLIERS SCORECARD ANALYTICS
Minimizing Costs with Quality of Items PURCHASED, Short Lead Time, and After Purchase Services, while Longer Credit Terms and Maximizing Limits from the Suppliers?
Get best prices on quality goods that prevent returns & or down time when used activities, and eating up stocking spaces while waiting for pick up if Returnable, otherwise if used, can cause problems.
KEY END RESULT AREA # 7
MAXIMIZING PROFITS
Maximize Bottom Line Profits Margin XX% and above base on Financial Statement Budget Proportions Management, and each Operations Cost Analysis ...
Comparative and Gap Analysis and Strategies -?Amount, %
Corporate, Centralized Factory Plants, Distribution Centers and other Business Units?
OPERATIONS' COSTS ANALYSIS through Operations Optimization Management, Profits from each Customers, and Each Delivery Trip and Many more
OPERATIONS' COST EFFECTIVENESS from Operations Optimization Management KPIs - refer CSF#4&5
BALANCE SHEET ANALYTICS?for KPI-SMART Planning and Developments to put the Company to a Better Company's Worth, and Financial Position.
KEY END RESULT AREA # 8
CASH FLOW POSITIVE / Bank Reconciled
Important consideration before granting Credit Terms and Limits to Accredited Customers is to check and study the Cash Flow Schedules Positive Position.?
KEY END RESULT AREA # 9
COST EFFICIENT AND EFFECTIVE SUPPORT GROUP
Administration KPIs?
_________________________________________________________________________
Thank you for taking the time and effort to go through this ISSUE / SERIES!?
We hope that somehow you guys can get something here for your designing, executing, simulations to get the best practices, effective and cost savings that you will use to Set Up. And to whatever extent this may help.?
Should you want to know about us, please visit by clicking https://optimization3i.wixsite.com/smart.?Though please bear with us as our website is not yet completed.??
You may contact us to inquire at [email protected]
If our Insights did help, and you are interest to give us a try Free of Charge for up to 3 hours maximum. Though to avail, please read the Requirements in the Website.?Limited offer. First Come First Serve.?
And if does, may I request you to like .... Thank you.?
Stay Safe.??
May God be Glorified!??
DISCLAIMERS?
We cannot give Warranty that ALL, SOME, ANY of the Insights will work for Any of You.?But hope it can somehow.??