Ever feel like navigating the change request process for infrastructure changes is like running an obstacle course blindfolded? You're not alone. Getting approval from the Change Management team and Change Control Board (CCB) requires hitting all the right buttons. Worry not, this guide will equip you with the essential information to craft a winning change request that gets a smooth green light.
Unveiling the Change Request Form
The change request form acts as your blueprint for a successful request. Let's break down the key sections and how to fill them out effectively:
- Change Title: Be clear and concise. Briefly describe the nature of the change (e.g., "Upgrade Server Security Protocols").
- Affected Infrastructure item/Server Name(s): List all servers directly impacted by the change.
- Reason for Change: Select the most fitting reason from the provided options. Here's a quick breakdown to help you choose:
- Incident/Problem: Resolving an existing issue affecting functionality. Capacity: scaling infrastructure to meet increased demand.
- User Dissatisfaction: Addressing usability concerns raised by users.
- New Configuration/Update/Obsolete Configuration: Implementing a new configuration, updating an existing one, or retiring an outdated configuration.
- Release/Proposed Upgrade: Deploying a new software release or proposing an upgrade.
- Business Requirement: A change driven by a specific business need. Security/Compliance: Enhancing security measures or ensuring compliance with regulations.
- Vendor Product/Service Change: Accommodating a change from a vendor impacting your infrastructure.
- Preventative Maintenance: Performing scheduled maintenance to prevent future issues. Continuous Improvement: Optimizing infrastructure for better performance or efficiency.
- Impact: Select the scope of the change's impact. Enterprise Level: Impacts the entire organization. Site Level: Impacts a specific physical location or data center. Multiple Users: Affects a significant number of users. User: impacts a single user.
- Priority: Indicate the urgency of the change. Critical: Requires immediate attention due to its high impact. High: important change requiring prompt action. Average: Changes can be scheduled within a reasonable timeframe. Low: a lower-priority change that can be addressed later.
- Schedule Start/End Date and Time: Define the timeframe for implementing the change.
- Downtime: Specify the scheduled downtime window for the change, including start and end dates and times.
Providing Context and Details
- Business Justification: Explain why the change is necessary and how it benefits the organization.
- Implementation Plan: Outline the steps involved in implementing the change, including resources required and rollback procedures.
- Out of Maintenance Window Justification: If the change falls outside the standard maintenance window, provide a compelling reason for the exception.
- Client Approver: Indicate the name of the client representative who approves the change.
- Backout Plan: Detail the steps to revert the change in case of unforeseen issues.
- Verification/Validation Explanation: Describe how you will confirm the success of the change after implementation.
- Backout Duration: Estimate the time required to reverse the change if necessary.
- Filling out the form accurately and completely is crucial.
- Provide clear and concise explanations for each section.
- Don't hesitate to reach out to the Change Management team for clarification or assistance.
By following these guidelines and providing comprehensive information, you'll be well on your way to crafting a stellar change request that sails through the approval process.