Maintaining a Baseline Schedule: Best Practices Checklist

Maintaining a Baseline Schedule: Best Practices Checklist

1. Establishing the Baseline Schedule:

- Set the baseline schedule promptly after the program begins.

- Ensure it is the basis for measuring performance.

- Represent the original configuration of the program plan.

- Obtain consensus from all stakeholders regarding the sequence of events, resource assignments, and key deliverable dates.

- Use the baseline schedule to track variances from the current schedule.

2. As-Built Schedule Archiving:

- Plan to archive the as-built version of the schedule upon project completion.

- Compare the as-built schedule to the original baseline for lessons learned.

- Use the as-built schedule as an input for future project estimates.

- Create and validate fragnets (fragmentary networks) where applicable.

3. Creating the Schedule Basis Document:

- Organizational Definition: Define the Integrated Master Schedule (IMS) organization.

- Network Logic: Describe the network's logic.

- Resource Management: Outline the basic approach to resource management.

- Parameter Basis: Provide a basis for all date calculation parameters.

- Project Overview: Describe the general project approach.

- Schedule File Usage: Define how to use the schedule file.

- Unique Features: Highlight the schedule's unique features.

- Change Management: Describe the schedule change management process.

- Glossary: Include a dictionary of acronyms and custom fields.

- Assumptions and Ground Rules: Provide justification for calendars, lags, date constraints, long activity durations, and working times.

- Resource Assignments: Detail resource assignments within the schedule.

- Critical Risks and Contingency: Prioritize critical risks and describe schedule contingency.

- Critical Paths and Float: Discuss the derivation of critical paths, longest path, and total float.

- Living Document: Ensure it is a living document reflecting updates to the baseline schedule.

4. Change Control Process:

- Review and approve changes to the baseline schedule according to the change control process.

5. Reporting Schedule Variances:

- Report schedule variances exceeding predetermined thresholds to management.

- Include the cause of variances and any corrective actions in the reports.

6. Investigating Negative Variances:

- Investigate negative schedule variances to determine if they affect the critical path.

7. Schedule Performance Analysis:

- Analyze schedule measures, such as the number of activities that have started or finished early, on time, or later than planned.

- Conduct trend analysis regularly to examine measures such as decreasing float and erosion of schedule contingency.

8. Schedule Recovery and Acceleration:

- Focus any schedule recovery or acceleration techniques on critical activities.

This checklist ensures a structured approach to maintaining and utilizing a baseline schedule, promoting effective project management and continuous improvement through lessons learned and rigorous analysis.

9. Regular Schedule Reviews:

- Conduct regular schedule reviews to ensure the project is on track.

- Update the schedule based on the latest information and progress reports.

- Communicate any changes or updates to all stakeholders promptly.

10. Baseline Schedule Updates:

- Update the baseline schedule only when significant changes occur that impact the project’s scope, timeline, or resources.

- Ensure all changes to the baseline schedule are documented and justified.

- Obtain approval for baseline schedule updates through the formal change control process.

11. Schedule Risk Analysis:

- Perform regular schedule risk analysis to identify potential risks that may impact the project timeline.

- Prioritize and document critical risks in the schedule basis document.

- Develop and implement mitigation strategies for identified risks.

- Include contingency plans for high-priority risks to minimize impact on the schedule.

12. Schedule Contingency Planning:

- Allocate schedule contingency time to account for potential delays or unforeseen issues.

- Monitor the use of schedule contingency and adjust as necessary based on project progress and risk analysis.

13. Resource Allocation and Optimization:

- Ensure resources are allocated efficiently to critical path activities.

- Monitor resource utilization to avoid overallocation or underutilization.

- Adjust resource assignments as needed to maintain schedule integrity.

14. Resource Constraints Management:

- Identify and document any resource constraints that may impact the schedule.

- Develop strategies to mitigate the effects of resource constraints on the project timeline.

15. Stakeholder Communication:

- Maintain clear and consistent communication with all stakeholders regarding schedule status, changes, and risks.

- Provide regular updates on schedule performance, including any variances and corrective actions.

16. Documentation and Record Keeping:

- Keep comprehensive records of all schedule-related documents, including the baseline schedule, updates, change requests, and approval records.

- Archive completed schedules and related documentation for future reference and lessons learned analysis.

17. Performance Metrics:

- Define and track key performance metrics related to schedule adherence, such as on-time completion rates, variance analysis, and float trends.

- Use performance metrics to assess project progress and identify areas for improvement.

18. Regular Reporting:

- Generate regular schedule performance reports for management and stakeholders.

- Include key metrics, variance analysis, risk status, and any corrective actions in the reports.

19. Lessons Learned:

- Conduct a post-project review to analyze schedule performance and identify lessons learned.

- Document lessons learned and integrate them into future project planning and scheduling processes.

20. Process Improvement:

- Continuously improve scheduling processes based on feedback and lessons learned.

- Implement best practices and industry standards to enhance schedule management and project delivery.

By adhering to these best practices, project managers can maintain an effective baseline schedule that serves as a reliable tool for tracking progress, managing risks, and ensuring project success. Regular updates, thorough documentation, and clear communication are key to keeping the project on track and achieving its objectives.

要查看或添加评论,请登录

Sudha Rajamannar的更多文章

  • Rolling Wave Plan:

    Rolling Wave Plan:

    Rolling wave planning is a dynamic and iterative planning technique used in project management to address the evolving…

  • The Importance of Activity Codes in Construction Project Scheduling

    The Importance of Activity Codes in Construction Project Scheduling

    Keeping an organized and detailed schedule is essential in construction projects. One key tool to achieve this is the…

  • Resource Management in Construction Planning

    Resource Management in Construction Planning

    Making the most of your resources is key to getting the job done right. Resources include everything you need to do the…

  • Predecessor and Successor Relations

    Predecessor and Successor Relations

    Predecessor and Successor Relations Within a schedule network, activities are interconnected logically through…