1.??Project specific Example

Client: Caddick Construction

Project Type: Highways

Project title: Alderley Park

Start date: 29th July 2020 - End Date: 31st July 2020

Project Brief:

As the winning bid for tender, we were responsible for the undertaking of a project for Caddick Construction which took place in July 2020.?The project brief was to carry out the retaining works, supporting a section of road adjacent to a proposed roundabout, to form part of the project’s public highway infrastructure.??

No alt text provided for this image

Budget Constraints:

Faced with Budget costs that conflicted with the Engineering Requirements for Retaining walls due to proximity to a culvert, resulting in poor ground conditions.?The client required alternative systems which could meet both engineering and commercial constraints. Due to the complexity of this project in relation to engineering requirements and site topography, the client needed a retaining wall that was high in specification and met with tight budgets and strict time scales.

Wall type:

The chosen wall type was Gillcon’s own BBA/HAPAS approved system Lock + Load. A high strength, lightweight concrete fascia retaining wall system that offers the benefit of quarried stone effect through manufactured precast process. ?The modular design uses reinforced concrete components assembled into a rigid cantilever unit. This unique design results in a system that can easily be installed by hand keeping the construction costs to a minimum.

Wall Design:

Our behind the scenes design team, with extensive industry experience, produce the induvial drawings for each project, in order to create a successful retaining solution.?The below hybrid Design for this particular project, showing the simplicity yet high spec of the lock + Load wall system.??

Project Section Design:

Project Section design

Project Elevation Design:

No alt text provided for this image

Project constraints:

Access to the work face alongside an existing culvert, presented its own commercial and construction issues. These issues were overcome with careful planning from our management team and exceptional operational support displayed by our site operatives.

Savings to Client:

Savings were offered to client through the efficiency of Gillcon’s Lock + Load System, offering a construction build rate at 40m2 finished wall per day based on a Three man team.?With the advantages of being able to reuse site won materials, we offered the client further savings on additional imported material. This can considerably reduce the carbon footprint and, return savings in areas of the build process which other systems cannot offer.

?Construction & Environmental considerations:

No alt text provided for this image

  • Wall systems next to tree protection zones had to be considered and carefully planned.
  • Sealed wall system reduces habitation by vermin and offers anti climb protection.
  • With the advantages of being able to reuse site won materials, Gillcon can considerably reduce the carbon footprint, traffic congestion to site; noise pollution and negative effects on local population in nearby built up areas.

2.????About Gillcon Group

Company Profile

Gillcon Group Ltd was established after experienced industry professionals identified that site Engineers needed simpler, yet innovative, cost effective retaining wall solutions. With experience in the ground working and Civil Engineering industry, Gillcon provide bespoke retaining wall solutions for construction developments throughout the UK.?

Gillcon Concrete Products Ltd offers DESIGN, SUPPLY MANUFACTURE & INSTALL in a range of retaining wall solutions. With our well established and professional management team, highly skilled site operatives, our projects generally range from 50-1500m2, with larger projects to date in excess of 5000m2.

Why Gillcon Group

We are set apart from our rivals, as we offer and specialise in a number of retaining wall solutions, depending on the client’s needs. Our work force is highly efficient, trained in all areas of ground works but able to focus their attention to a single discipline. In turn Returning outstanding quality and meeting very tight deadlines. The program from start to finish can be very controlled, allowing repeat systems of work, managed in very controlled and safe environment.

Our mission is to continuously offer clients innovative solutions through dedicated design, operational support and exceptional customer service.

We are always looking to push the boundaries of innovation and, we are constantly in search of the best suited options which offer optimal satisfaction to the client.

Contact details

Email: [email protected]

要查看或添加评论,请登录

社区洞察

其他会员也浏览了