Efficient and Effective: Building Success with EFCO
The all-steel EFCO PLATE GIRDER panel is a complete forming unit.

Efficient and Effective: Building Success with EFCO

Mayflower Water Treatment Plant | Plymouth, United Kingdom

Meeting the Client's Needs

Dave Wall Construction Services, Ltd. (DWCSL) is a firm located in Exeter, Devon, United Kingdom, that specializes in reinforced concrete, steel fixing, and formwork. They offer a high level of quality and commitment to all clients. DWCSL provides complete packages for all their clients’ work, including procurement, supply, engineering, and temporary work design.

DWCSL secured the tender to build the civil and reinforced concrete work on the new Mayflower Water Treatment Plant in Plymouth, United Kingdom.

"The EFCO PLATE GIRDER was the perfect system to use. It was the first time we had ever used the system, and it never let us down. We chose the EFCO PLATE GIRDER because we needed to achieve such a high-quality finish and because of the strength and durability of the system." - Daniel Wall, Works Manager

EFCO Solution

The client’s requirements included an F4 concrete finish with minimal joints and tie holes, as well as an accelerated schedule. EFCO proposed the PLATE GIRDER? formwork system to take advantage of the ability to assemble large gang forms.

An EFCO Outside Angle Corner connects PLATE GIRDER panels at outside corners. Some of EFCO’s competitors produce and sell panels without holes in the flanges to connect to.

Super Service

Once the EFCO equipment arrived on-site, an EFCO field supervisor helped the crew become more familiar with the PLATE GIRDER system with an EFCO Toolbox Safety Talk that provided on-the-job training using a step-by-step video showing the proper assembly and cycling procedures of the system. EFCO Toolbox Talks can shorten the learning curve of an inexperienced crew using EFCO equipment. The videos also focus on safety from when the equipment arrives through the production schedule.

Completion

The project took 24 weeks to complete three large 26'-3" (8?m) height multi-celled tanks successfully and with a concrete finish well within the specifications.

"Once we experienced the results and benefits of the system, we started using the PLATE GIRDER on other projects. The system leaves you with virtually no finishing work, and the maintenance of the system between pours is next to nothing, which increases cycle time. We highly recommend this product for projects with high-quality finishes. The EFCO team was faultless." - Daniel Wall, Works Manager

EFCO EQUIPMENT

PLATE GIRDER?


DAVE WALL CONSTRUCTION SERVICES, LTD. (DWCSL) TEAM

Dave Wall, Managing Director

Daniel Wall, Works Manager

Martin McCabe, Project Manager


EFCO FORMWORK SPECIALISTS–Airdrie

Rob Shaw, Territory Manager

Colin Walker, Field Supervisor

Stuart De Freyne, Engineer


Efco brilliant gear

How can I contact for offer my services to help you requests? ??

回复

要查看或添加评论,请登录

EFCO Forming & Shoring Solutions的更多文章

社区洞察

其他会员也浏览了