Kryfix Newsletter May 2023 Edition
Kryfix Newsletter May 2023 Edition

Kryfix Newsletter May 2023 Edition

Welcome to the Kryfix Newsletters May 2023 Edition, Autumn is in full swing and with Winter slowly approaching, it quite often comes with the potential for heavy rains and flooding across the country. As a trusted leader in waterproofing solutions, we know that protecting your projects from water damage is more important than ever now. In this month's newsletter, we will be sharing some exclusive ongoing product sales, exciting project successes completed by our sales team, and much more...

Akfix HB260 Hybrid Flooring Adhesive Beige 600ml Promotion!!

No alt text provided for this image
https://www.instagram.com/p/CrHOE7EhRlN/

We're excited to announce a special promotion on one of our most popular adhesive products - the AKFIX HB260 Hybrid Flooring Adhesive Beige 600ml. For a limited time only, we're offering a 35% discount off the RRP on this high-quality adhesive with a minimum of one box order on future sales. The Akfix Hybrid Flooring Adhesive is a fantastic single-component universal elastic flooring adhesive based on hybrid technology and provides exceptional performance on strips and mosaic parquet, plank floors, and wood block floors on porous and non-porous substrates.

Take advantage of this exclusive promotion today and don't miss out on the opportunity to save on a top-quality product that will deliver outstanding results for your flooring projects. This sale is strictly on while stocks last & will be ending on the 14th of May 2023!!

Project Success Stories

  1. Kennards Self Storage Camperdown

The Kryfix team is delighted to highlight our involvement on the Kennards Self Storage Camperdown Project Site. This successful project utilized a number of our versatile products, including?Krystol Internal Membrane (KIM) , Hyperstop DB-2519 & Hyperseal BR-2510N . All 3 products were successfully installed & added to the basement slab, shotcrete, and lift pits of this project.

This large-scale commercial project was completed in collaboration with? Patterson Building Group Pty Ltd ?and Concrite Pty Ltd Alexandria plant in order to deliver superior waterproofing solutions. Kryfix will be further involved in the development of this project so stay tuned for more info on this in the coming weeks!!

2. Denison Street Wollongong

No alt text provided for this image
Kryfix Denison Street Wollongong Project Highlight

Our next project highlight is a major commercial development project that chose to utilize a host of Kryfix waterproofing systems. This project in Wollongong was completed for builders LEVEL 33 ?and successfully used Krystol Internal Membrane (KIM) , Hyperseal D200 & Hyperseal BR-2510N waterstops , Krystol Repair Grout & Krystol T1 for all sheer/tie bolt holes on this project. This project was completed under the supervision of our National Sales & Technical Manager Claude Fradel with concrete for this project being supplied by Boral Australia?Port Kembla plant.

3. Deicorp Tallawong Village Project

Our final project highlight is the utilization of our Krystol Internal Membrane (KIM) waterproofing admixture, which was used extensively in the Deicorp Tallawong Village, Rouse Hill project. This large-scale residential village project, upon completion, will feature a number of highly affordable & contemporary apartment residences, all within walking distance of the Sydney Metro. The Kryfix team was delighted to supply our KIM Waterproofing Admixture for this project, which was then used in the lift pits, retaining walls & OSD tanks of this residential project.

Upcoming Major Kryfix Projects

No alt text provided for this image
Kryfix - Heart Of Willoughby Project

  1. HEART OF WILLOUGHBY

This North Shore Property Construction project will very soon be transformed into a brand new 3-level club. The club area will feature a range of stunning restaurants, cafes, lounges, and bar facilities.

In addition, it will be featuring 126 luxury retirement living apartments which will offer a complete concierge, dining facilities, on-site management, an indoor swimming pool & also a gym/pilates studio facility.

The Kryfix team will be supplying between 10,000 - 11,000m3 of Krystol Internal Membrane (KIM) in addition to a number of Kryfix Waterstops which will all be utilized in the lifts, podiums & roofs of this project.

LinkedIn Exclusive Articles

No alt text provided for this image
Kryfix LinkedIn Exclusive Articles

The team at Kryfix is super excited to share with you exclusive published articles that can be found only on the Kryfix LinkedIn page going forward!! The articles consist of a wide array of topics, from detailed product analysis to dedicated Q&A articles for all your queries.

Our team of experts also provides valuable insights, tips & advice on the latest waterproofing trends & best practices in the industry, along with major insider tips and tricks on how to get the best results on your project site from our products.

At Kryfix, we understand the importance of providing our customers with not only the best products but also the best knowledge and support. We want to empower our customers to make informed decisions when it comes to their waterproofing and adhesive needs.

Therefore we encourage you to follow along and check out our articles for all insider tips and tricks on Kryfix products. We're confident that you'll find them informative and helpful in your future projects.


Be sure to support us by following us on our social media handles @Kryfix

To keep up to date with the latest Kryfix projects & company news !!

No alt text provided for this image
Kryfix Follow Our Social Media Accounts

要查看或添加评论,请登录

KRYFIX的更多文章

社区洞察

其他会员也浏览了