Key areas for excellence in installation engineering
Layout of underground garage and upper space of underground public walkway
◆1. The basement includes the underground garage and the upper space of the public walkway, which is usually filled with various water, electricity, heating, gas, ventilation, and air conditioning pipes. These pipes are crisscrossed, and many are as high as 7 to 8 floors. Whether the layout is reasonable and beautiful, the project technicians should carefully conduct BIM model collision checks, reasonably deepen the layout, and strictly follow the sequence of construction.
◆2.Function rooms
◆ Various machine rooms, such as air-conditioning room, water pump room, boiler room, power distribution room, intelligent control room, etc., are the parts that best reflect the level of technology.
◆ Whether the layout of various pipelines and equipment is reasonable and orderly, and whether the installation process level is fine, will directly affect the operation of the equipment, the normal function and the visual effect. The setting of support brackets and process pipelines should first consider their safety and rationality, and should not affect the use function for the sake of beauty.
◆ It is necessary to consider the coordination between the elevation and orientation of the equipment and the layout of the pipelines, so as to meet both functional requirements and aesthetic requirements. The colors and logos of various paints, insulation layers, and coatings will also have a great impact on the visual effect, so they must be carefully planned and constructed.
Roof layout Pipelines, equipment, lightning protection system
◆ The roof is a must-check place. Many roofs are equipped with smoke exhaust, cooling towers and other equipment, as well as pipelines, lightning protection, landscape lighting, etc. In order to consider the beauty of the roof and perfect its functions, it is necessary to deepen the design and make a comprehensive layout. Closely cooperate with civil engineering and roof decoration, and make unified planning. You can consider intentionally creating some highlights and making some humanized treatments to play a finishing touch.
领英推荐
■ Installation of electric shafts and pipe shafts
Each floor's electric shafts and pipe shafts are the focus of spot checks. In addition to the civil construction being carried out in accordance with the regulations, (construction sequence: shaft top - wall - installation - ground). The layout and construction of the installation project is also particularly important. Bridges, cables, distribution boxes, busbars, lamps, pipes, and valves should be arranged neatly and orderly. Planning should be done before construction. According to the size of each shaft space, reasonable layout should be made to form a construction drawing. Each floor has a unified installation process to ensure safety, reliability, perfect technology, and beautiful appearance.
Bathroom installation
◆ The squatting and sitting toilets, urinals, switches, sockets, washbasins, floor drains, mop pools, etc. in the bathroom must be closely coordinated with the decoration and planned together. They must not be done independently and without rules.
◆ The arrangement of floor tiles and wall tiles should be considered together with the installation elevation and orientation of the appliances to form a common planning diagram, and then each should be constructed according to the determined elevation and orientation to achieve a beautiful effect. This is also where highlights can be created and quality characteristics can be summarized. Careful planning and construction must be carried out.
The installation of the basin drain pipe is closely coordinated with the decoration and is regular, just right in the gap between the floor tiles. The sanitary ware is firmly installed and the elevation is accurate and coordinated with the decoration.
Ceiling installation and construction