LED high bay Lights are a general term for lighting fixtures used in production areas of factories, mines, warehouses, and high sheds. In addition to various lighting fixtures used in normal environments, there are also explosion-proof lights and anti-corrosion lights used in special environments. Since different environments will change the reflection efficiency of lighting fixtures, before installing industrial and mining lights, we need to determine the installation height according to the specifications of the lighting fixtures and the specific lighting environment.
??Installation Steps for LED high bay Lights(Suspended)??
1. Set up hooks in advance at the position where LED high bay Lights need to be installed. It should be noted that hooks should be used in conjunction with lifting rings. In addition, when installing hooks, ensure that the carrying capacity exceeds 30Kg.
2. Insert the lifting ring on the LED high bay Lights into the set hook and hoist the lighting fixture through the lifting ring.
3. Connect the power cord led from the site to the power cord of the lighting fixture, connect it according to the wiring principle of the lighting fixture, and do a good job of waterproofing and insulation treatment.
4. After turning on the power supply, observe whether the LED high bay Lights can work normally. After confirming that the light is on correctly, the installation is completed.
??Installation Requirements for LED high bay Lights fixtures??
1. First, check whether the LED high bay Lights is complete and whether the accessories are complete.
2. When installing or replacing accessories of LED high bay Lights, it is necessary to disconnect the power supply first. When connecting the power supply, pay attention to the input voltage being compatible with the industrial and mining light. After connecting the power cord, be sure to do a good job of corresponding waterproofing and insulation treatment.
3. The connecting wires on the LED high bay Light fixture can pass through the drilling hole, and the connecting wires on the back of the lighting fixture can be fixed with wire clips to ensure firmness.
4. Pay attention that the power cord of the lighting fixture needs to have sufficient length and not be subjected to tension or tangential force. When installing the connecting wires of the lighting fixture, avoid excessive tension. Do not knot the connecting wires. Pay attention to distinguishing the output connecting wires and do not confuse them with other lighting fixtures.
5. The product and flammable materials should be at least 0.2m away. Ensure that there is a 2 cm high gap in the installed ceiling. The lighting fixture cannot be completely installed inside the ceiling or by the wall with a heat source. Pay attention to separating the low-voltage and high-voltage electrical connecting wires.
6. When installing LED high bay Lights, be careful to handle them with care and do not throw them around randomly, causing damage to the lighting fixture. Strictly follow the installation instructions required by the manufacturer.
7. After installation, also inspect the site to see if there are any blind spots for lighting. It should be ensured that the lighting of the lighting fixture meets the requirements.