Did you know: Using a effective supply chain management system can reduce procurement time by an average of 30 days.

In this article, you will discover everything you need to know about the construction industry standard pre-qualification questionnaire and how to effectively use it to reduce supply chain risk and time spend on your procurement process.

Supply Chain Procurement
Supply Chain Procurement

Summary

In this article you will learn about:

  • what PAS-91 is.
  • who uses PAS-91 and how do they benefit.
  • why was PAS-91 created.
  • what is covered by the PAS-91 standard.
  • the purpose of PAS-91.
  • our solution to effectively implementing PAS-91.


What is PAS-91?

Where did the standard originate?

Published in 2010 by the?BSI?(British Standards Institute), the Publicly Available Specification number 91 (PAS-91) defined a set of standardised questions to be used by a principal contractor to determine the suitability of a supplier during project tendering.

What is included within the standards?

The PAS-91 questions are categorised into modules. With these modules, buyers can determine the suitability of suppliers based on their competence across up to 8 key areas of risk management. We will discuss

When is the standard used?

PAS-91 can be used for a variety of different projects since these modules allow principal contractors to focus on project-specific requirements. In the construction industry for example, projects that are required to comply with?CDM 2015?regulations can use PAS-91 modules to demonstrate and ensure compliance with these regulations.

Who is PAS-91 for?

This standard set of questions is for both ends of the supply chain and provides benefits across the board. Both the buyer and supplier can reap the benefits of employing PAS-91:

Principle Contractors
Principle Contractors

Buyers Benefits

  • Consistency:?a standardised question set allows for easy comparison of suppliers and quality, insightful answers from all potential suppliers.
  • Time saving:?reduces the amount of resources required to determine which suppliers meet the buyers’ requirements.
  • Risk reduction: risk to buyer is strongly reduced by PAS-91 since any potential issues with a supplier are identified long before they step on site.
  • Quality:?More competition for jobs overseen by the principal contractor results in finding higher quality suppliers.


Suppliers
Suppliers

Supplier Benefits

  • Save time:??as there are the same questions every time, suppliers can?simply copy over answers from a previous PQQ (pre-qualification questionnaire).
  • More jobs:?the time saved allows suppliers to fill out more pre-qualification applications in the same amount of time.
  • Confidence:?answering the same questions every time allows the supplier to refine their answers leaving them confident they have represented their capabilities well.

PAS-91 has undergone several revisions since its conception and now is considered to be applicable beyond the construction industry and extends into facilities through building information management and modelling.

Why was PAS-91 created?

The construction industry had for many years struggled with lost time during pre-qualification – a lot of unnecessary effort and cost was expended by both buyers and suppliers. The BSI along with the UK government and other stakeholders sought to create a universal set of questions that were common to all construction procurement and would prompt unambiguous responses and increase potential for recognition by all current pre-qualification schemes.

What areas does PAS-91 Cover?

No alt text provided for this image
PAS-91 Logo


PAS-91 is comprised of four core and four optional modules. The core modules contain questions that are to be asked in every situation. The optional modules concern areas of supplier capability that buyers frequently want or need to know about. This is often dependent on the type of job that needs doing or the type of organisation overseeing it.

Core module 1 Supplier Identity, key roles and contact information.  Core module 2 Financial Information.  Core module 3 Business and Professional Standing.  Core module 4 Health and Safety: Policy and Capability.  Optional Module 1 Equal Opportunity and Diversity: Policy and Capability.  Optional Module 2 Environmental Management: Policy and Capability.  Optional Module 3 Quality Management: Policy and Capability.  Optional Module 4 Building Information Modelling (BIM): Policy and Capability.
PAS-91 Modules


Free PAS-91 Checklist

Our free PAS-91 pre-qualification questionnaire (PQQ) Checklist has been built using the British PAS-91 standard and will help you to to build a PQQ that will reduce supply chain risk and ensure you're procuring quality suppliers.

Get my free copy

What is the purpose of Pas 91?

Key objectives when PAS 91 was published was to reduce duplicate processes, unnecessary paperwork and excessive costs across the construction industry that had posed an issue for too long. PAS 91 also aims to raise the bar for supply chain standards. PAS 91 did not aim to introduce any new questions, simply standardise those that were already being asked by buyers in the industry.

Another aim of PAS 91 was to increase the likelihood that the pre-qualification process was gladly participated in by suppliers of all sizes. Previously, there was reluctance from especially small and medium sized enterprises (SMEs) to engage in the pre-qualification process.

The continuous?updating of PAS 91?to bring it inline with construction industry and health and safety executive (HSE) guidelines ensures that the standard will provide benefits to an ever wider group of businesses in an increasingly widening selection of industries.

Is PAS-91 compulsory?

HSE?and?SSIP?guidance does not make the use of PAS-91 compulsory, but buyers and suppliers alike realise the benefit provided to them by engagement with the standard and working with pre-qualification questionnaires designed around the PAS-91 framework.

Our Solution is Samson

All 8 modules of PAS-91 are available to use for issue by a buyer, but they are not just limited to these eight. Buyers may add or remove any other modules to suit their pre-qualifying requirements on their?Samson?portal. These makes?Samson?flexible, bespoke and extendable beyond just construction and facilities. Bear in mind that the first 4 modules of PAS-91 are simply to do with the standing and competence of the supplier, and the requirement for this information is industry-agnostic.

No alt text provided for this image

Using Samson, buyers, procurement officers, principal contractors can pre-qualify their supply chain to the latest amended edition of?PAS 91:2013+A1:2017?using the web-app provided by?Liaison Systems.

Samson?can also provide a?pre-construction questionnaire?available to all buyers. A?pre-construction questionnaire?covers details specific to a project, such as those responsible for first aid, or procurement of a confined-space specialist – have site operatives received advice on this? As an example.

With Samson the buyer has full control over which suppliers are approved. This gives the buyer full control over the speed of the process making Samsons pre-qualification process fast! A supplier can complete the questionnaire and be approved in 1-2 hours whereas, with our competitors systems it can take weeks.

Whats the next step?

A quick and free form which will allow us to get you a personalised no obligation quote within 24 hours.

or

Get in contact with one of our team for a free consultation to discuss how our services could benefit your business.




As our business has grown Liaison has become ever more useful in properly vetting and approving our supply chain in an efficient and cost effective manner; Liaison takes the drudgery out of information gathering in an efficient and user friendly fashion, it has been a great help and time saver to our organisation.

?NIGEL BELLAMY, 8build



Related Blogs:

Useful Resources:

British Standards Institution (BSI) Group [2017] PAS 91:2013+A1:2017 – Construction prequalification questionnaires.

BSI Group [2012] Streamlining construction procurement processes.

BSI Group [2010] PAS 91:2010 Construction related procurement – Prequalification questionnaires.

Health and Safety Executive (HSE) [2015] The Construction (Design and Management) Regulations 2015

Safety Schemes in Procurement (SSIP) [2020] PAS91 and the SSIP Core Criteria.

要查看或添加评论,请登录

Liaison Systems Ltd的更多文章

社区洞察

其他会员也浏览了