Important Steps in OCH power debugging on ROADM system.
1-Measure typical insertion loss of boards.
2-Finish the optical power pre-calculation according to typical insertion loss.
3-Set "preset attenuation" of WSS in accordance with the pre-calculation result.
4-During OCH power debugging, if current attenuation is adjusted, preset attenuation must be adjusted at the same time as the current attenuation.