Important Steps in OCH power debugging on ROADM system.


1-Measure typical insertion loss of boards.

2-Finish the optical power pre-calculation according to typical insertion loss.

3-Set "preset attenuation" of WSS in accordance with the pre-calculation result.

4-During OCH power debugging, if current attenuation is adjusted, preset attenuation must be adjusted at the same time as the current attenuation.

要查看或添加评论,请登录

社区洞察

其他会员也浏览了