Implementing Earned Value Management: Lessons from the Field

Implementing Earned Value Management: Lessons from the Field

Watch or listen on Youtube, Spotify or Apple Podcasts.

Earned Value Management (EVM) is one of the most powerful tools in project controls. But let’s be honest—mention EVM in a meeting, and half the room runs for the hills. The challenge? Taking an organization unfamiliar with EVM and implementing it in a way that actually adds value instead of turning into a compliance-driven headache.

In this episode of Beyond Deadlines, I sat down with Christopher Mikec , Project Controls Manager, and Frank Casertano , Scheduling Manager, both from Lighthouse Electric Company, Inc. They shared their experience working with a general contractor (GC) to roll out EVM across an entire program. Their insights are a must listen for anyone looking to make EVM work in the real world.


Key Takeaways

For those short on time, here’s what you need to know:

  1. A Strong Schedule is the Foundation Before you even think about implementing EVM, your schedule must be rock solid. Chris and Frank stress the importance of creating a Level 4 schedule—detailed enough to track work packages but not so detailed that it becomes unmanageable. They follow the DCMA 14-point schedule assessment to ensure quality.
  2. Standardization is Key Standardizing data between scheduling (P6) and accounting software is critical. They’ve built a system where every project follows the same structure, allowing seamless cost tracking, percent complete calculations, and historical benchmarking.
  3. Earned Value Data Comes from Multiple Sources EVM isn’t just about the schedule. It integrates with accounting systems, cost codes, and quantity tracking software (Assemble) to get a complete picture of planned value, earned value, and actual costs.
  4. Buy-In Requires Selling the Value EVM often gets a bad reputation as an overcomplicated process. The key to securing buy-in from project teams and leadership is demonstrating how it drives proactive decision-making—identifying inefficiencies and making adjustments before they escalate.
  5. Quantity Tracking Reduces Schedule Complexity Using a model-based tracking tool like Assemble allows them to keep schedules leaner and more manageable while still reporting highly accurate percent completes. This reduces the administrative burden of maintaining a bloated schedule with thousands of activities.
  6. Continuous Improvement and Automation are the Future Right now, quantity tracking is still manual. The future lies in automation and AI-driven progress tracking, such as site cameras or drones that capture real-time installation data and feed it back into the EVM system.


Tactical Takeaway: Set Up a Clean Handoff Between Schedule and Cost Data

One of the biggest mistakes in EVM implementation is a messy handoff between scheduling and cost data. If you’re looking for one actionable step today, make sure your scheduling team and accounting team are using the same cost codes and WBS structure. A standard, well-integrated framework prevents rework, minimizes confusion, and ensures that your earned value calculations are both accurate and meaningful.

Watch or listen on Youtube, Spotify or Apple Podcasts.


Critical Path Career

Impactful Strategies for Advancing Your Construction Career

Available on Amazon.

Are you ready to transform your career in construction planning and scheduling? Whether you’re starting out or are an experienced professional, "The Critical Path Career: How to Advance in Construction Planning and Scheduling" is your essential guide to achieving success and earning more in your field.

What You’ll Discover Inside

  • Specific Career Advancement Steps: Navigate through the distinct stages of career progression, including getting a raise, securing a promotion, and finding a higher-paying job.
  • 26 Interview Questions with Sample Answers: Prepare for your next big interview with confidence using expertly crafted questions and answers designed specifically for planners and schedulers.
  • 34 Impact Ideas: Implement practical ideas to make a significant impact in your role, enhancing your value and visibility within your organization.
  • Become a Top 1% Planner or Scheduler: Learn how the very best differentiate themselves from the crowd.

Why This Book?

Unlike other guides, "The Critical Path Career" is tailored specifically for the construction planning and scheduling community. This book provides the tools and knowledge you need to increase your salary, advance your position, or simply become more effective in your current role.

Available on Amazon.


EVM works fine, if it is implemented for contractor needs, and the client learns what it offers and accepts it without demanding low-value modifications.

Lance Stephenson

Advancing Corporate, Operational & Project Excellence

6 天前

Exactly... we live in a performance-driven world... you can't do this without understanding performance...

Eric Christoph

EVM and Project Control Expert | Helping Organizations and Teams Implement EVMS | Cost Modeling, Scheduling, Systems Engineering, and Process Optimization

1 周

Good to see new people adopting EVM. It's just 4 lines and 4th grade math after all ??. Check out the NDIA Planning and Scheduling Excellence Guide (currently v5) for great points when scheduling for EVM projects. If you are looking for a pre-built EVMS that integrates with your scheduling, accounting, ERP, and other systems please check out our new Djobu EVMS at https://djobuevms.com/djobuintro

Chris Mason

Assistant Planner at SYSTRA Ltd

1 周

Today's listening sorted ??

要查看或添加评论,请登录

Micah Piippo的更多文章