Implementing Construction Site Closures (guidance)

Implementing Construction Site Closures (guidance)

As members of the TWf I wanted to share .. Please follow the link for the full documents ..

https://www.scafftag.co.uk/news/Advice-on-temporary-suspension-of-sites.html

1. Construction Leadership Council guidance: This document has been prepared by the Construction Leadership Council to help construction companies and clients ensure a controlled shutdown of sites and facilities where work must be suspended due to the current coronavirus threat.It should be noted that current UK Government does not require all construction sites to close. However, it is recognised that, whether through choice or because it will not be possible to comply with the Standard Operating Procedures, many sites are closing or will close temporarily. This guidance is intended to ensure that any shutdown is safe and allows the site to recommence operations promptly after the suspension is lifted. Each site operator should carry out their own risk assessment that considers all local factors  

2. TFL safe stopping of construction sites: To reduce the risk of spreading coronavirus TfL has taken the decision to close our construction sites. Construction sites will now be expected to demobilise in accordance with their Safe Stopping Assessment.  

The feedback from some of the Temporary Works forum members:

'Thanks for this excellent and authoritative document. Much needed in these unprecedented and worrying times. I'm sure we will be making good use of this in the days and weeks to come.' 

Lisa Hayes

Senior Safety Engineer Ford Motor Company, specialising in transport operations (Rail, Road and Sea) throughout the UK.

4 年

Cheers my dear

要查看或添加评论,请登录

Abi Piper的更多文章

  • Covid:19 repositionable signs & tape.. 20% off orders over £100

    Covid:19 repositionable signs & tape.. 20% off orders over £100

    Signs, barriers & tape? Repositionable vinyl signs ? Hygiene signs ? Encapsulated Paper Signs ? Safety Signs ? Queue…

  • Covid-19 - Protect your Employees // Floor distance marking

    Covid-19 - Protect your Employees // Floor distance marking

    Identification and safety solutions for your people, products and premises. ? 20% off orders over £100 To order: call…

    1 条评论
  • Stop Covid:19

    Stop Covid:19

    At Brady, we are closely monitoring the impact of COVID-19 and we have successfully implemented countermeasures to stay…

  • Asbestos Awareness Poster(s)

    Asbestos Awareness Poster(s)

    Delighted to report that Scafftag have revamped their two popularly informative posters around asbestos. One poster…

    3 条评论
  • what3words ....

    what3words ....

    To find you more easily in an emergency, many UK Emergency Services are encouraging you to share your 3 word address…

  • 30 April NEC / UK Infrastructure Show

    30 April NEC / UK Infrastructure Show

    NEC: Hall 19 Stand 64 (opposite Advice & Support area) Register NOW and come visit us there..

  • Precast concrete

    Precast concrete

  • .. Jason Anker // 10th December @ 1400hrs

    .. Jason Anker // 10th December @ 1400hrs

    THE LONDON HEALTH AND SAFETY GROUP PRESENTS JASON ANKER MBE Event to be held at the following time, date and location:…

  • MSc in Temporary Works & Construction Method Engineering 2018/2019 - applications open

    MSc in Temporary Works & Construction Method Engineering 2018/2019 - applications open

    Lots of questions … Might you be interested in MSc-level education in temporary works and construction method…

  • BS EN 131 - Ladder update

    BS EN 131 - Ladder update

    I just wanted to give you a quick update on the new BS EN 131 ladder regulations and what it means to us. In a…

社区洞察

其他会员也浏览了