HV Test Services: Sub Station and Circuit Breaker Testing , Speed/ Timing Tests

HV Test Services: Sub Station and Circuit Breaker Testing , Speed/ Timing Tests

The time it takes for the breaker to move from a fully closed to a fully open, or open to close is measured in milliseconds

The measured time periods is then compared to the times specified by the OEM

Breakers that fall inside these timing windows and corresponding tolerances, is assumed to be working correctly

Typical opening times could be 20 – 25 milliseconds, while closing times of 50 – 60 milliseconds would be more the average

But these Pass/Fail values has to be taken from the specification as released by the OEM