How to use SWMM5 Buildup/Washoff in an ICM InfoWorks Network for Event Mean Concentrations (EMC). Ten steps to use EMC in an InfoWorks Network in ICM.

1: Use SWMM Buildup Washoff in the Water Quality and Sediment Parameters
Use SWMM Buildup Washoff in the Water Quality and Sediment Parameters
2: Define the Non-Attached Pollutants

We will use only BOD for the first iteration.

Define the Non-Attached Pollutants
3: Decide whether to use Sediments (The Potency factor)

We will not use the sediment fraction parameters SF1 or SF2 for this example.

Decide whether to use Sediments (The Potency factor)
4: On the Subcatchment Grid use the Tab Buildup / Washoff Land Use for SWMM BW
On the Subcatchment Grid, use the Tab Buildup / Washoff Land Use for SWMM BW.


5: Do not use Buildup for EMC Washoff
Do not use Buildup for EMC Washoff.
6: Use EMC Washoff in the Washoff Dialog for the Determinant BOD

The event mean concentration runoff coefficient used in the EMC (Event mean concentration) washoff type. Depending on the pollutant, this is specified in mg/m3 or 1/m3.

Use EMC Washoff in the Washoff Dialog for the Determinant BOD
7: Define the BW Land Use for the Subcatchment
Define the BW Land Use for the Subcatchment
8: In the Run Dialog, use only BOD as the QM parameter for Water Quality
In the Run Dialog, only use BOD as the Water Quality QM parameter.
9: Validate, run the model, and then graph the results. The concentration of BOD is 100 mg/l


Validate, run the model, and then graph the results. The concentration of BOD is 100 mg/l
10: In Tools / Options use mg/l as the output units for Concentration
In Tools / Options use mg/l as the output units for Concentration
Closing Note:

Thank you for reading these articles. I appreciate your engagement and support. Thank you again, and I hope you'll join me on this ongoing journey of learning and discovery. Until next time!

Mohamad Azzam

Project Manager / Design Manager, Khatib & Alami, P.Eng.

9 个月

Useful tips

回复

要查看或添加评论,请登录

Robert Dickinson的更多文章

社区洞察

其他会员也浏览了