How to set up USB cable production line
With the popularity of electronic equipment, data cable as electronic equipment charging and data cable transmission is an essential accessory, but also consumable products, after a period of use, there will be breakage and data line core damage, thus affecting the data line charging and data line transmission, below we look at the production process of usb data cable, so as to better understand the data line.
If you are interested in USB cable production, you can also contact us, we are also very rich experience to help customers in various countries to set up professional USB production lines
USB wire production process
Raw material procurement:
The production of USB data cables usually requires the use of conductor wire, insulation materials, metal connector and other materials. These materials need to be carefully screened and inspected to ensure that their quality meets the requirements and meets the needs of customers.
Cutting and srtipping wire:
According to customer needs, the whole circle of data wire through the cutting machine to cut the length required by the customer, pay attention to not crush, scratch, adjust the size length.The cutting machine generally has the function of removing the outer cover, but if need stripping inner core, it also wants to manually use the inner core stripping machine to stripping skin, pay attention to not scratch the core wire, the size and length should be reasonable.
Straighten wire and cutting outer aluminum foil:(if have)
This step, depending on the raw materials, some cables are needed, some cables are not used, basically through the manual to straighten, pay attention to the weaving must be straightened clean.Cutting aluminum foil is mainly for the special cable, stripping the aluminum foil on the core wire, pay attention to not cut the core wire and cut it clean.
Solder:
Now there are two kinds of automatic solder and semi-automatic solder, automatic solder can be welded simple products, but complex usb wire still need semi-automatic machine to weld, pay attention to the welding temperature/can not be misplaced/tin/fake welding/tin spot bright.
Tin inspection:
The welded wire needs to be checked to see if there is dislocation/tin/false welding/tin point to be full and bright.
领英推荐
Molding internal and outer mold:
The welded data cable is formed by the plastic injection molding machine.Pay attention to the molding pressure, temperature and time, can not punch glue, tip, crush the iron shell, etc.
Testing cable:
Take out the point according to the template, can not open, short circuit, INT function is poor.
Appearance inspection:
Do not punch glue, lack glue, tip, crush iron shell, scratch.
Packing:
Clean the appearance and tie the wire according to the size required in the drawing.
Store ------OQC sampling inspection ------- shipment
This is the simple process of USB cable production, if you want to know more details, you can contact us, we can provide a complete set of wire production machine.
Email:[email protected]
Wechat:+8613699833232
Data analyst, Flutter-Web Programmer (Self-employed), Firebase, Data/Python Enthusiast, Instrumentation and Control Engineer
7 个月This is great. I would like to discuss more with you about this.
Senior Product Manager Using Analytics to Deliver Product Excellence and Lead the Team Using Agile | Product Management | Excel | Powerpoint | SQL | Python | AI | R | Salesforce | AWS | Data Visualization| Cyber Risk
7 个月Let's discuss further