How much does it cost to build a warehouse??
Andy Butters
Managing Director at Aganto Ltd, FLOW Power & HVAC & Corporate Development Director at GL Events UK
If you’re researching the costs of building a warehouse, you may want to consider a semi-permanent warehouse as an option - because when you get the same space for approximately 25% of the cost - it’s difficult to see why you’d go the conventional route.
Build a warehouse at 25% of the cost?
If your proposed warehouse is an addition or extension to your existing facilities - there is probably a better, more cost efficient build solution than the conventional build process. A modern constructed temporary warehouse has many advantages to its conventionally constructed equivalent. The build costs are just one. And because it’s semi-permanent - the functionality you require from a warehouse will not be compromised.
Have you thought about the increase in your rateable value?
A temporary warehouse is, in some circumstances, exempt. But it’s very likely the rateable value will be much lower than a conventionally constructed warehouse. This is because its freestanding and relocateable. It’s highly likely the rateable value assess by your local authority will be significantly less than a conventionally built industrial unit. This is because it can easily be removed re-erected and reused elsewhere.
Can you get flexible payment options on the cost of your new warehouse build?
A temporary warehouse can be purchased new or if you want to bag yourself a bargain, it could be previously owned - either way you can get finance to spread the costs. Alternatively just as you might lease any other piece of operational equipment, you can lease the temporary warehouse. Possibly providing additional tax or cashflow benefits. If you’re not sure, you can rent short-term and road test the temporary warehouse.
Are the warehouse build costs and installation timescales fixed?
If you’ve ever commissioned any type of conventional building works you will have experienced both the price creep and timescale stretch. This can be anything from the wrong type of ground to adverse weather conditions - whatever the reason, it’s likely the build schedule and costs are only ever a guide provided by your chosen contractor. Because the temporary warehouse is prefabricated, the build process and costs are 100% predictable. Typically you will have your warehouse building up and ready within 5 weeks
How easy is it to extend your warehouse if you need more space?
It’s inevitable at some point you are likely to need more space, whether a seasonal peak, a specific contract win or organic growth. Extending a conventional warehouse is a disruptive process, which takes time and significant financial investment. With a temporary warehouse you can have an extension in weeks. You could even rent the additional prefabricated roof, floor and wall units for the specific period you need the extra space - then retract to the original building size when the seasonal peak or one off contract is finished.
Expanding your on-site storage space has never been more simple, cost effective and flexible. It’s often easier to pick up the phone and speak to someone, so if in doubt – please call us on 01635 202979 or email me [email protected]
General Manager @ BLE Lighting and Power | CONNECTION REQUESTS WELCOMED | IoT Expert | Early Adopter | Mentor | Coach | Vision
6 年David Wade, Adrian Wade as discussed.
Tailormade Development Projects (Pty) Ltd
6 年This is obviously not applicable in SA. I have no idea how big your temporary warehouse is. Here in most industrial areas they can be huge. Plus minus 1000 sq m. How could that be a temporary structure?
Director at T2L Ltd
6 年I'm looking for a small 2000 sq.ft warehouse. Please email with options and costs. [email protected]
Method Cladding Ltd 07530266518
6 年5 men went to fit, went to fit 1 panel