How much does the aac brick production line need to invest?
How much does the aerated brick production line need to invest?
Aerated concrete is a kind of production technology with large amount of steel and special equipment. The funds spent on molds, autoclaves, pre curing vehicles, steam curing vehicles and various rails in the complete production line account for more than 70% of the total equipment investment and steel consumption. Although, the process of batching, pouring, cutting and steam curing in the production of aerated concrete is irreversible.
Moreover, the layout of the process route is very particular. The design team of manwei mechanical aerated brick production line suggests that you consider the following aspects:
1. You need to determine the annual output of the investment. Generally, the annual output is 20000 cubic meters, 30000 cubic meters, 50000 cubic meters, 100000 cubic meters, 150000 cubic meters, 200000 cubic meters, etc. We can design a production line with an annual output of 20000-400000m3 aerated brick
2. Choose the right equipment. The funds spent on molds, autoclaves, pre curing vehicles, steam curing vehicles and various rails in the complete production line account for more than 70% of the total equipment investment and steel consumption. So this part of investment is very important. In addition, some equipment can be self-made, and customers do not need to invest any more!
3. How to deal with the allocation of equipment configuration, site planning and selection, and plant layout.
4. Manufacturer selection of aerated brick production line.
领英推荐
We must choose professional and experienced manufacturers. Aerated brick production and design team has been engaged in aerated concrete mechanical maintenance, equipment management and technical development for more than ten years! Nineteen years! We have done a lot of work in technological innovation and equipment transformation! The designed and constructed process route is short or long, the batching process is simple or complex, the plant building is small or large, and the equipment selection is fine or cheap. The full price of aerated brick equipment ranges from 900000 yuan to 12 million yuan. Customers are welcome to contact us by telephone. Based on a detailed understanding of your situation, we will put forward reasonable investment suggestions, help you analyze the market of aerated brick and matters needing attention in running a factory, and help you design an investment scheme and equipment configuration list according to your actual situation.
How much does the aac brick production line need to invest?
The aerated concrete production line is mainly made of fly ash (slag or sand) as the production raw material, lime and cement as the cementitious material and aluminum powder as the aerating agent through the processes of crushing, metering, mixing, pouring, resting, cutting and steam curing. Aerated concrete is a new type of wall building material, which has the advantages of light weight, heat preservation, heat insulation, energy saving, waste utilization, environmental protection construction, convenience and quickness. It is a national key environmental protection project.
Because the products of aerated concrete block equipment are formed by pouring and gas expansion, the volume of the formed blank is large. In order to achieve the required overall dimensions, it must be processed before the final product is formed, which is the cutting of aerated concrete block.
Generally, the dimension of the concrete block cutting process is in accordance with the national standard or the dimension of the concrete block cutting machine.
Damage that may occur in the cutter process:
1. Damage during hoisting, billet fracture, missing edges and corners, and other defects during hoisting;
2. Damage during cutting, crack of green body before cutting, horizontal cutting fracture, transverse middle fracture, missing edge and angle, double eyelid, edge collapse and dimensional deviation during overturning cutting;
3. Damage, collapse and crack after cutting (generally caused by excessive temperature). Crisp (when the marshalling stops, a large amount of water is lost, so that the hydrothermal reaction cannot be carried out normally).