How much does the aac brick production line need to invest?

How much does the aac brick production line need to invest?



How much does the aerated brick production line need to invest?

No alt text provided for this image

Aerated concrete is a kind of production technology with large amount of steel and special equipment. The funds spent on molds, autoclaves, pre curing vehicles, steam curing vehicles and various rails in the complete production line account for more than 70% of the total equipment investment and steel consumption. Although, the process of batching, pouring, cutting and steam curing in the production of aerated concrete is irreversible.

No alt text provided for this image

Moreover, the layout of the process route is very particular. The design team of manwei mechanical aerated brick production line suggests that you consider the following aspects:

aac block machine

No alt text provided for this image


1. You need to determine the annual output of the investment. Generally, the annual output is 20000 cubic meters, 30000 cubic meters, 50000 cubic meters, 100000 cubic meters, 150000 cubic meters, 200000 cubic meters, etc. We can design a production line with an annual output of 20000-400000m3 aerated brick

No alt text provided for this image


2. Choose the right equipment. The funds spent on molds, autoclaves, pre curing vehicles, steam curing vehicles and various rails in the complete production line account for more than 70% of the total equipment investment and steel consumption. So this part of investment is very important. In addition, some equipment can be self-made, and customers do not need to invest any more!

No alt text provided for this image


3. How to deal with the allocation of equipment configuration, site planning and selection, and plant layout.

No alt text provided for this image


4. Manufacturer selection of aerated brick production line.

No alt text provided for this image


We must choose professional and experienced manufacturers. Aerated brick production and design team has been engaged in aerated concrete mechanical maintenance, equipment management and technical development for more than ten years! Nineteen years! We have done a lot of work in technological innovation and equipment transformation! The designed and constructed process route is short or long, the batching process is simple or complex, the plant building is small or large, and the equipment selection is fine or cheap. The full price of aerated brick equipment ranges from 900000 yuan to 12 million yuan. Customers are welcome to contact us by telephone. Based on a detailed understanding of your situation, we will put forward reasonable investment suggestions, help you analyze the market of aerated brick and matters needing attention in running a factory, and help you design an investment scheme and equipment configuration list according to your actual situation.

No alt text provided for this image

How much does the aac brick production line need to invest?

The aerated concrete production line is mainly made of fly ash (slag or sand) as the production raw material, lime and cement as the cementitious material and aluminum powder as the aerating agent through the processes of crushing, metering, mixing, pouring, resting, cutting and steam curing. Aerated concrete is a new type of wall building material, which has the advantages of light weight, heat preservation, heat insulation, energy saving, waste utilization, environmental protection construction, convenience and quickness. It is a national key environmental protection project.

No alt text provided for this image


Because the products of aerated concrete block equipment are formed by pouring and gas expansion, the volume of the formed blank is large. In order to achieve the required overall dimensions, it must be processed before the final product is formed, which is the cutting of aerated concrete block.


Generally, the dimension of the concrete block cutting process is in accordance with the national standard or the dimension of the concrete block cutting machine.


Damage that may occur in the cutter process:


1. Damage during hoisting, billet fracture, missing edges and corners, and other defects during hoisting;


2. Damage during cutting, crack of green body before cutting, horizontal cutting fracture, transverse middle fracture, missing edge and angle, double eyelid, edge collapse and dimensional deviation during overturning cutting;

No alt text provided for this image


3. Damage, collapse and crack after cutting (generally caused by excessive temperature). Crisp (when the marshalling stops, a large amount of water is lost, so that the hydrothermal reaction cannot be carried out normally).


please add my

whatsapp:0086 18637192252

[email protected]

Sundaramoorthy P

Industrial Spare Parts,Industrial Maintanance

1 年

Any new project available?If have contact us .We are undertake electro mechanical installation and testing..... More future of our team PLC PROGRAM for automation

回复

要查看或添加评论,请登录

Evita Lee的更多文章

  • Winnermac Machinery: Leading the Way in Mining Solutions and Project Excellence

    Winnermac Machinery: Leading the Way in Mining Solutions and Project Excellence

    Winnermac Machinery is a professional mining machinery manufacturer specializing in stone crushers, mobile stone…

  • Rotary Ball Mill

    Rotary Ball Mill

    Rotary Ball Mill Feeding Size: 0-25mm Capacity: 1.65-44.

  • How much washed sand can be washed from one ton of stone powder, and how much does a set of washed sand equipment cost?

    How much washed sand can be washed from one ton of stone powder, and how much does a set of washed sand equipment cost?

    In the process of stone processing in stone factories, fine particles and stone surfaces are often produced, which are…

  • Heap leaching gold process

    Heap leaching gold process

    Heap leaching gold extraction process [Process introduction]: The heap leaching gold extraction process is to crush…

  • Which crusher is best for manganese iron ore?

    Which crusher is best for manganese iron ore?

    Iron ore is an important raw material for iron and steel production enterprises. Pure iron ore is gradually extracted…

  • cement ball mill

    cement ball mill

    The cement ball mill can be used for both dry and wet production, as well as grinding and drying at the same time. The…

  • Cone Ball Mill

    Cone Ball Mill

    Cone ball mill is suitable to grind ore and other materials and is widely used in mineral dressing, building materials,…

  • cement ball mill

    cement ball mill

    Applied materials: cement, silicate, new-type building material, refractory material, ore dressing of ferrous metal and…

  • Graphite Rotary Dryer

    Graphite Rotary Dryer

    Graphite Rotary Dryer A Brief introduction about Graphite: Graphite is a crystalline form of carbon, a semimetal, a…

  • flotation separation process

    flotation separation process

    Flotation production line [feed particle size]: 100 mesh - 300 mesh [production capacity]: 100-10000 tons / day…

社区洞察

其他会员也浏览了