How following parts for the tool must be manufactured and calculated (example for plastic injection):
Clamping plate
? ejector package
? mould plate
? intermediate mould plate
? guide columns
? guide bushings
? guide pins
? Hot runner manifold block
? hydraulic cylinder
? ledge
? heat protection plat
First, According to the mold inserts to make manufacturing procedure, calculate the processing time required for each process of mold insert, and make aprocess plan schedule.
Second, Improve production and manufacturing execution, improve the execution of manufacturing orders and low efficiency problem, put the production schedule in place.
Third, Make a board of the manufacturing work arrangement in the workshop, and arrange tasks reasonably every day .
Fourth, Check whether the materials(bill of materials ) has been arranged to be in place on tiem, if the property does not arrive on time, please withdraw from the purchase in time, communicate effectively with the supplier, and ensure that the materials can arrive on time.
Fifth, Hold a production meeting once a week to review and summariz last week's mold production situation, arrange this week's mold production schedule, and adjust the urgent tasks inserted in the middle.
Sixth,Make a test plan to the relevant departments according to the product drawing and information provided by customer before mold testing.
Seventh, After mold testing, The project engineer should make a final conclusion based on the test results of the sample, and arrange to send samples to clients anc improving the issues of mold.
Wendy Lim Sales Engineer
GR Precision Mold Limited
===========================
M.86-153388 17151 (Whatsapp and Wechat support as well)
F.86-0769-87560305
China Facility Add:
Jinqiao Industrial Route, TuQiao,
QingXi Town, DongGuan, China 523652
USA Support Add:
PO.Box#531, Buena Park, CA 90621