How Cost Plus Pricing Works
Credit accountinguide.com

How Cost Plus Pricing Works

Ever wonder how electronic contract manufacturers come up with their prices? Simple: they estimate their costs, then add profit. This method is called “cost plus”; cost plus profit.

Most businesses price their products or services based on the value they bring to customers. We pay hundreds of dollars for software products with no idea or even concern as to what they cost the software company to produce. We buy them based on the value they bring to us.

But some things we don’t buy based on value, we buy based on cost. These tend to be things we might otherwise do ourselves. Because we can do it ourselves, we are likely to have some idea what it costs. Therefore we want to compare the cost of doing it ourselves to the price of having someone else do it. The value is in not having to do it ourselves, which can only be understood by comparing the cost of doing it ourselves with the higher price of having someone else do it.

If you happen to be handy enough to remodel a bathroom, you can calculate the cost of materials and estimate the amount of time it would take you. If you solicited bids from contractors to do the job, you would naturally expect to pay a price for the materials, a price for the time at some hourly rate, and some profit for the contractor. Often referred to as a “time and materials” quote, this is a form of “cost plus” pricing. In cost plus, cost is the actual cost and plus is the profit.

Electronic contract manufacturers (CMs) build products designed by their OEM customers, who know the approximate cost to manufacture their product. The OEM must choose between manufacturing themselves or outsourcing. Because the OEM knows the approximate cost of manufacturing and could choose to build it themselves (at least theoretically), CMs use cost plus to determine price.

For the CM, the basic components of cost are materials, direct labor, and overhead. Typically, the direct labor and overhead costs are combined into the “burdened labor rate.” The average burdened labor rate for North America is about $40. If a widget has $500 of materials and takes 1 hour of labor, the cost is $540 ($500 plus 1 hour at $40 per hour). A profit margin will then be added to the $540.

For PCBA manufacturing the labor time is usually calculated as a function of the number of placements, with different types of parts assigned different placement times. For example, tiny 0201 packages can be placed much faster than 160pin BGA's.

A related method of calculating labor cost is to assign a cost per placement. For NPI or low volume, common per placement costs can range from $0.25 to $0.50. For production $0.10 to $0.20 is common, below $0.10 is common for high volume production. In Asia they sometimes price "per point", which (usually) means per solder joint. Costs of around $0.01 per point are common.

Once you have costs estimated, it's time to apply profit margin. A common misunderstanding is how to calculate profit: margin or markup? CM's almost always use margin. Margin is the percent of the selling price that is profit and is calculated as cost divided by (1 – Margin %). For example, if cost is $33 and margin is 25 percent, the calculation is 33 divided by .75 (1 - .25), which equals $44. Markup is an adder applied to cost and is calculated as cost times (1 plus Markup %). If cost is $33 and markup is 25 percent, the calculation is 33 times 1.25 (1 plus .25), which equals $41.25.

Returning to our example above, a product with a $540 cost and 25 percent margin (typical for low-mid volume) the cost plus price would be $720.00 (540 divided by .75).

At EMS industry's highest levels different calculations are made using ROI as the guiding principle. Contact me on LinkedIn if you'd like to learn more about that.

No alt text provided for this image


要查看或添加评论,请登录

Everett Frank的更多文章

  • How To Use The Octopart API

    How To Use The Octopart API

    This article will show you how to use the Octopart API using Python. Octopart is a product of Nexar Cloud Platform.

  • How EMS Can Drive Profit With AI

    How EMS Can Drive Profit With AI

    How can an EMS company increase profits in the next 12 months? New customers? Perhaps, but unlikely. Consider: On…

  • Here's What AI Can Actually Do For Sourcing Today.

    Here's What AI Can Actually Do For Sourcing Today.

    After a year spent deep in the weeds understanding and programming AI for electronic component sourcing, I’ve recently…

    2 条评论
  • If components could talk, what would you ask?

    If components could talk, what would you ask?

    Imagine walking into a room filled with all the electronic components you need to buy this week. Now, imagine if each…

    1 条评论
  • How To Prompt ChatGPT

    How To Prompt ChatGPT

    AI For Procurement Series - Part 2 Learn how to improve your results with ChatGPT using 5 best practices. In this…

    1 条评论
  • How AI Works

    How AI Works

    AI For Procurement Series - Part 1 Learn the basics of ChatGPT, LLM's and Prompt's. We'll accomplish this by explaining…

  • What is CPH?

    What is CPH?

    Component placements per hour (CPH) is fundamental to understanding the capabilities of an SMT line. If you want to…

  • 3 Easy Steps To Reshoring PCBA's

    3 Easy Steps To Reshoring PCBA's

    Here's an instant and easy way to see if your printed circuit board assemblies (PCBA's) can be made in the USA at…

  • What is Should Cost Analysis?

    What is Should Cost Analysis?

    Should cost analysis ("should costing") was developed by the Defense Department to assist procurement officers in…

  • Should I Tell EMS Suppliers What Others Have Quoted?

    Should I Tell EMS Suppliers What Others Have Quoted?

    If they deserve it, yes. If you buy only on the basis of price, then no.

社区洞察

其他会员也浏览了