How to appraise the cost of major diversionary works for statutory undertakers.

How to appraise the cost of major diversionary works for statutory undertakers.

Appraising the cost of major diversionary works for statutory undertakers can be a complex process that involves careful consideration of various factors. However, here are some steps that can help you appraise the cost of such works:?

  • Gather Information: The first step is to gather all the necessary information about the project, including the scope of work, site location, legal requirements, and any other relevant details.?
  • Identify the Costs:?Next, identify all the costs involved in the project, such as labour, equipment, materials, permits, and any other expenses related to the diversionary works.?
  • Estimate the Duration of the Project:?Determine the estimated duration of the project, including any delays that may occur due to weather or other unforeseen circumstances.?
  • Determine the Labour Costs:?Calculate the cost of labour involved in the project, including wages, benefits, and overtime pay.?
  • Calculate the Equipment Costs:?Determine the cost of any equipment required for the project, such as heavy machinery or specialised tools.?
  • Estimate the Material Costs: Estimate the cost of materials required for the project, such as pipes, valves, and fittings.?
  • Add the Costs:?Once you have determined all the costs involved in the project, add them up to arrive at a total estimated cost.?
  • Consider Contingency Costs:?It is also essential to consider contingency costs, such as unexpected expenses or changes in the scope of work, and include them in the total estimated cost.?
  • Review and Adjust the Estimate:?Review and adjust the estimate as necessary based on any additional information or changes to the project scope.

?Following these steps, you can appraise the cost of major diversionary works for statutory undertakers and ensure your estimate is as accurate as possible. It's important to note that this is a complex process, and it may be helpful to consult with experts or professionals with experience in this area to ensure the accuracy of your appraisal.

O. P Martins

B-Tech (Arch) MA (Design Mgt) MAPM

2 年

This summary is quite accurate! Essentially when one is considering works by statutory authorities only. In some other instance, there can be elements of diversionary works required to be done but may not be economically feasible for the statutory undertaker to undertake. These works fall under contestable elements such as civils (i.e excavation to retrieve newly abandoned assets or to install and lay new pipes/ducts/mains, and reinstatement following either of the exercise: permanent or temporary. These sort of item may well have been costed for under the contingency but in actual fact, they are mostly some of the most accurate measurable work in the course of preparing such estimates. In addition, I think the other very important element you mentioned that can't be over emphasised is the duration and the lead times. For some clients with time restraints as key factor, the duration plays a determinant role over the cost. Lastly, I appreciate how you have provided visibility on all aspect of diversionary works in the concise high level detailed summary, which is always a great position to start from.