Homogeneous vinyl flooring cracked, accident, or a quality issue?

Homogeneous vinyl flooring cracked, accident, or a quality issue?

Linda would like to share a cracked homogeneous vinyl flooring case in this article.

Communication records

Video of the cracked homogeneous vinyl flooring

The cracking was so severe, and it's always a pity to see something like this. Videos, photos, invoice or batch numbers of goods, and installation conditions are all clues to solving the problem and can help solve the case better. We appreciate our client's cooperation in providing this information.

According to the communication, in the same batch, only two rolls met such badly cracked conditions. The construction occurred in the winter of the client's country, with average temperatures ranging from minus 10 to 5 degrees Celsius.

According to our market experience, it is a common condition on our side and in cold winters, such as hospital projects in Inner Mongolia, China.

The main ingredients of homogeneous vinyl flooring are resin powder and calcium powder. Because of PVC homogeneous flooring's thermal expansion and contraction characteristics, it is very brittle at low temperatures in winter. Falling from a height during loading and unloading can cause such a situation.

Therefore, in cold winter, the impact of low temperatures on the floor cannot be ignored.

(Linda’s other article mentioned the temperature problem; welcome to click this link to check it as a reference. )

Even the professional construction team must pay special attention to transportation, loading, unloading, and floor protection when the temperature is too low.


So, the higher the temperature, the better? Of course not.

When the temperature is too high, open the flooring, and the vinyl flooring is easy to deform; When the temperature is too low, open the flooring, and the vinyl flooring is easy to crack.

The correct way is for flooring rolls to be adapted to the construction site's temperature 24 to 48 hours before opening the package. Then, the rolls should be opened and pre-paved for 24 to 48 hours to allow the floor to adapt to the temperature again, release the stress, and increase the vinyl flooring's dimensional stability and service life. (We recommend that the construction temperature cannot be lower than 14°C, max about 30°C~35°C)

Premium homogeneous flooring
www.titanvinyl.com

If you like this article, please leave your like or Subscribe on LinkedIn.That will encourage Linda to write more good articles.


Dylan Xie

Solar Security Trailer OEM Manufacturer | Portable Off-Grid 24/7 Outdoor Surveillance Platform | Unlock New Opportunities in Security Rentals and Service Expansion

1 个月

professional ??

回复

要查看或添加评论,请登录

社区洞察

其他会员也浏览了