The Hidden Enemy in Water Projects

The Hidden Enemy in Water Projects

In water projects, the biggest challenges often do not lie in static conditions but in transitions—the transient states that occur during the process.

A system might be designed to function optimally under stable conditions, but what happens when there’s a sudden shift?

These moments of change can introduce unforeseen risks, design flaws, and costly failures. Let’s explore some real-world examples where transient states play a crucial role.

Desalination Plants

A desalination plant’s performance is highly variable, adapting to different operational scenarios.

One of the key analyses in such systems is the piezometric profile—the water level along the system—which is vital in determining the depth and height of structures.

The high water level dictates the dimensions of water-retaining structures, affecting design, cost, and scheduling. However, there are moments when water levels exceed the calculated high points.

For instance, a sudden pump shutdown can create unexpected surges in water levels.

This transient event is critical because it may be higher than the maximum you expected.

Those transient also can lead to air entrance in the piping—a major risk factor for system integrity.

Engineers must always consider transient analysis since the worst-case scenarios often arise from these unpredictable changes.

Hydropower Plants

A similar phenomenon occurs in hydropower plants, particularly those using reversible pumping.

Water is not like a simple on/off switch; transitioning between operational modes takes time and generates pressure fluctuations.

This is why surge chimneys are essential, as they help manage the energy shifts within the system.

Ignoring transient analysis in hydropower projects can result in severe operational inefficiencies or even catastrophic failures.


Sea Water Intake: Construction Pitfalls

Another overlooked aspect of transient conditions appears during the construction of sea water intake structures for desalination plants.

These structures are built several meters below ground and groundwater level, requiring dewatering and shoring to maintain stability during excavation.

The sequence typically involves:

  1. Excavation and dewatering
  2. Construction of the concrete structure
  3. Backfilling
  4. Removal of dewatering

However, a temporary yet critical scenario arises—when the dewatering system is removed, groundwater levels rise, and the intake structure is still empty.

If the structure was designed assuming it would always be filled with water, the uplift force from groundwater can become a serious issue.

This is a scenario that may last only a few days or weeks in a facility’s 50-year lifespan, but failing to account for it in design can lead to costly and even irreversible problems.


Key Takeaway: Transient Analysis is Non-Negotiable

In water projects, the enemy is not in a frozen picture.

Transient states can dictate design decisions, influence construction methods, and ultimately determine the success or failure of a project.

Engineers and decision-makers must be proactive in considering worst-case scenarios, even if they seem unlikely or short-lived.

The devil is in the details—embrace transient analysis, and stay ahead of the unseen challenges in water engineering.


要查看或添加评论,请登录

Ramón Rubio de Castro的更多文章

  • My Journey with Intakes & Outfalls in Desalination

    My Journey with Intakes & Outfalls in Desalination

    Yesterday, February 25, 2025, marked a major milestone at The Water MBA. We uploaded Part I of our course, designed to…

    3 条评论
  • Taweelah IWP - The world’s largest seawater reverse osmosis desalination plant

    Taweelah IWP - The world’s largest seawater reverse osmosis desalination plant

    While we were wrapping up the execution of the previous desalination plant at the site, business didn’t stop—new…

    11 条评论
  • Amaala Utilities: The Perfect Water Cycle

    Amaala Utilities: The Perfect Water Cycle

    It was January 2022 when the documentation for a new tender landed on my desk, igniting everything that followed. If…

    11 条评论
  • First Feet on Ground

    First Feet on Ground

    After a few years in business development and working on multiple diverse projects, it was high time I experienced…

    14 条评论
  • Inside Atak?y WWTP: Key Takeaways from a Landmark Wastewater Project

    Inside Atak?y WWTP: Key Takeaways from a Landmark Wastewater Project

    At a certain point in my career, I made one of the best decisions—or at least a suggestion that was ultimately…

    2 条评论
  • When Water Becomes a Weapon

    When Water Becomes a Weapon

    In a recent podcast, Daniel Herrero Marín asked me about an experience that left a deep impact on my personal and…

    4 条评论
  • Ingeniería de Caminos, Canales y Puertos: ?El fin de una era?

    Ingeniería de Caminos, Canales y Puertos: ?El fin de una era?

    La Ingeniería de Caminos, Canales y Puertos (ICCP) ha sido, para mí, mucho más que una carrera profesional. No solo…

    14 条评论
  • Geopolitics, Water, and Sustainability

    Geopolitics, Water, and Sustainability

    Traveling to Lithuania was another moment in both my professional and personal journey. It wasn’t just about visiting a…

    1 条评论
  • 2024 Financial Statement - The Water MBA

    2024 Financial Statement - The Water MBA

    You curious one! Money, a complicated and often uncomfortable topic to discuss. People are often hesitant or even…

  • My Favourite Newsletters About Water

    My Favourite Newsletters About Water

    As we close out 2024, winter begins in the Northern Hemisphere and summer in the Southern Hemisphere. For me, it’s also…

    10 条评论