HI-POD Test Short Notes

HI-POD Test Short Notes


Hi-Pod test is high voltage test/ Dielectric with-stand test.

We perform it to check the system capability to with-stand high voltage at transient time, which might occur during a sudden load released or high load switching, a high transient voltage wave might be produced in this time. Also, during fault conditions. To ensure as well the dielectric medium between two conductors.


Why we use DC HI POD in cable testing ?

ANS: For the cables, the distance between the cables are very LESS , when you use AC high pod test it will produce high Capacitance  due to this capacitance the leakage current will be high so, you will get low INSULATION value.

Second reason, Due to this capacitance it will produce a ferranti effect on the other end of the cable (the voltage will be high at the other end which might damage the cable).

Voltage supply value at Hi-Pod.   (SAT)

Bus bar:

80% (2Vn+1000).  AC Hi-Pod test.

Or 

80% Vpeak.


Cables: 

80% (2Vn+1000)*1.414.   DC Hi-Pod test.

Or

80% Vpeak*1.414


Vn: system nominal voltage

Vpeak: system voltage with-stand

SAT: site acceptance test (first time you do the test in you site)


Why we should reduce the percentage of the hipod test for more than the 3rd time we perform the test?

ANS: For the 1st time (FAT) they do 100% of the test (2Vn+1000) V2

    For the 2nd time (SAT) they do 80% of the test (2Vn+1000) V2

    For the 3rd time (Maintenance/ Inspection/ Troubleshooting) we do 60% of the test (2Vn+1000) V2

Because if we maintain at 100% the property of the insulating material will change and the dielectric strength of the cable will be reduced!


What are procedures to do hipod test? 

ANS:1- we have to disconnect all connect equipment to the cable/ busbar, etc..

Ex; BusBar, we have to disconnect all connected P.T. ,Out going, earthing switch

2- if we are going to hipodtest PHASE (R)

 **The other 2 PHASES (Y&B) shall be shorted and connected to earth.

  “That’s to ensure the dielectric strength between the tested phase and the others”.

3- It’s highly recommended to check the humidity of the test environment.

4- Select/ set the leakage current measurement on the test kit.

5- Increase the injected voltage gradually (SBS).

6- Check and record the leakage current value in your testing sheet.

7- If you finished the test, you need to discharge the injected phase using earth rod to your earthing system to avoid sparks,…etc.

8- After hi-pod test it’s highly recommended to perform insulation resistance test (Megger test) for all phases, to ensure that the component insulation is not damaged.


*** During hi-pod test if you get a high leakage current value specially during (SAT);

 1. The surface of the material might not cleaned properly.

 2. The test environment humidity is high.

 3. For cables might be bad insulation/ insulation damage during laying.

Shahid Mahmood, BSc Civil, MSc Str, PE

Managing Director at Design Tech Engineering Solutions

5 年

We Design Tech Engineering Solutions Lahore, Pakistan, would like to introduce our self as “One Stop Shop for Technical Solutions” for Structural Design of RC / MS Steel Buildings, Structural Strengthening / repair Works solutions / Peer Reviews / Design Vetting, gap analysis for international companies to provide Back Office Support. We are a group of engineers having wide range of UAE experience with well-known multinational companies. Currently we are providing Back Office Support to many well-known companies in UAE, Oman and Saudi Arabia by providing them concept design to final stage design facilities on economical rates. Due to prevailing economic pressure, every business entity tries to reduce their overheads. It’s always economical to have Back Office in low cost countries. We are here to provide you safe, reliable and cost effective solutions on very low cost with our fully dedicated team. Please do not hesitate to contact undersigned for any query. Shahid Mahmood Managing Director Senior Structural Engineer 0092-340-0040681 E-Mail: [email protected] www.designteches.com

要查看或添加评论,请登录

Rami M.Ahmed的更多文章

  • “Unleashing Your Inner VFD Whisperer: Troubleshooting with a Wink”

    “Unleashing Your Inner VFD Whisperer: Troubleshooting with a Wink”

    Introduction Ah, the VFD—our electric chameleon that dances with motors, tames energy, and occasionally moonlights as a…

  • Advanced Insights into Power Switching and Load Transfer

    Advanced Insights into Power Switching and Load Transfer

    The realm of electrical engineering is ever evolving, and among its critical aspects is the efficient management of…

  • How Capacitor Banks Can Improve Your Electrical System's Performance

    How Capacitor Banks Can Improve Your Electrical System's Performance

    Capacitor Banks: A Technical Overview A capacitor bank is a collection of capacitors that are connected together in…

  • Induction Motor Tips ???????

    Induction Motor Tips ???????

    ??? ????? ?? ???? ????? · ???? ??????? = ???? ?????? ×3 √ (1.732) · ????? ??????? = ????? ?????? ÷3 √ (1.

    3 条评论
  • Reliability Centered Maintenance

    Reliability Centered Maintenance

    what is R.C.

  • MOTORS' SOFT FOOT

    MOTORS' SOFT FOOT

    Soft foot is a commonly misunderstood term and a topic that can be considered on its own, separate from alignment. The…

  • Brief Notes for E.D.G. Commissioning

    Brief Notes for E.D.G. Commissioning

    A- visual Checks. a.

  • Electrical Engineer

    Electrical Engineer

    Dear all, Required for a contractor , site electrical engineer with minimum 2 years experience at: 1- Transformers…

  • Power Transformer tests

    Power Transformer tests

    MEASUREMENT OF VOLTAGE RATIO AND CHECK OF CONNECTION SYMBOL: 1-Purpose of measurement: The purpose of the measurement…

  • Instrument Technician

    Instrument Technician

    Dear all, An instrument technician with +5 years experience in maintenance field at petrochemical company located at…

社区洞察

其他会员也浏览了