- Rated Maximum Current: The meter should have a rated maximum current that is 100% of Imax.
- Terminals: Meter terminals must be capable of carrying 150% of Imax.
- Casing: Meters should be housed in a safe polycarbonate casing.
- Insulating Materials: All insulating materials must be non-hygroscopic and non-aging.
- New Installations: The renewable energy meter should be installed in the same location as the consumer meter.
- Existing Consumers: For existing installations, the consumer meter must be replaced with the renewable energy meter.
3. Interface Energy Meters (IEMs)
- Manufacturing: New IEMs should be factory manufactured to operate in 5-minute time blocks.
- Data Collection: The Automated Meter Reading (AMR) system should collect 5-minute load survey data from all interface points and transmit it to the Meter Data Processing (MDP) system.
- AC Electricity Meters: Maintenance should adhere to the code of practice specified in the relevant Indian Standards (IS).
Green Economics | Sustainable Developments | Construction Chemistry | listening to #ceranomic |
1 个月Nice share quite informative Om Saxena