HAZID (Hazard Identification):

HAZID (Hazard Identification):

A HAZID Study is an assessment to find hazards and problems related to plant, system, operation, style, and maintenance. HAZID is employed as a part of a Quantitative Risk Assessment (QRA).

By distinctive these hazards are risks. Finding HAZARD/RISK during QRA analysis will guide actions that can be taken to eliminate the hazard (or) manage the effect of exposure.

Approach for HAZID Study:

Team Members required for HAZID Study

  • Chairman (Facilitator)
  • Operations Plant Manager
  • Fire & Safety Team – Head of Department
  • Director Members (Client & Contractor team)
  • Project Manager
  • Process Engineer
  • Instrumentation Engineer
  • Electrical Engineer
  • Scribe – Official Representative that will write down the points during HAZID Meeting

The Chairman will be evaluating every process with a protocol step-by-step approach in the field. HAZID Study is crucial for finding out each Risk after the Design stage.

DEPCS team has Experienced Facilitators and Process Engineers that are capable of identifying each HAZARD/RISK that is crucial before conducting a HAZID meeting.

要查看或添加评论,请登录

Digital EPCS的更多文章

社区洞察

其他会员也浏览了