Gas turbine Load rejection test
Ahmed Hamdy Abd Elrahman
Operations & Maintenance Manager | Power Generation Specialist | PV & CCPP Professional | Safety Leadership | Project Management | Commissioning & Startup Professional | NEBOSH, IOSH, OSHA Certified | Eclipse and Maximo.
Introduction
Process and Test purpose
Opening the Generator circuit breaker GCB, GT will run at full speed no load (FSNL), following the compliance of overspeed trip non-activation (Neither electrical nor mechanical) with the unit parameter (Excitation, Terminal voltage, Gas flow, gas reducing station pressure, Electrical loads stability, AVR performance, governor mode,.....etc).
2. House load operation mode
Opening the electrical network breaker and the unit will be isolated from the network working in island mode (House load operation). The auxiliary transformer will be fed from the unit itself and follow the compliance of overspeed trip non-activation (Neither electrical nor mechanical) with the unit parameter (Excitation, Terminal voltage, Gas flow, gas reducing station pressure, Electrical loads stability, AVR performance, governor mode,.....etc).
It's important for gas turbine operators to understand load rejection scenarios and have appropriate measures in place to mitigate risks and ensure safe and stable operation of the power plant.
领英推荐
?For more interesting topics about energy Kindly, check our newsletter...??
Energy Newsletter???????????
Ahmed Hamdy Abd Elrahman........??????
"Please feel free to share your thoughts, suggestions, or any modifications regarding our recent discussions. Looking forward to hearing your valuable comments!"
Senior manager(Power& Utility), Matix fertilizer ltd
1 年One of the important tests of GTG for avoiding station block out ,this test advantages for immediate action of again exporting power to Grid... Good information Mr.Ahmed hamdy
Plant Shift Superintendent @ Yamal LNG | LNG Production
1 年Well done. Good tropics you are sharing .
Power Plant operator/ Shift Supervisor /Combined Cycle Power Plants (CCPP), Combined Cycle Gas Turbines (CCGT), Simple Cycle/Open Cycle Power Plants, steam turbine, Gas turbine, GIS, Substation
1 年it's a simulation for the action of the under frequency protection