First Pile Inserted Factory Extension
As can be seen on the monitors the loads of the first pile are clearly visible in the live StabiAlert monitoring. Although the dynamic loads are very severe no deformation was observed while driving the first pile. We continuously (every 15 seconds) monitor the deformation effects on the entire vicinity. Including the quay side.
The StabiAlert monitoring was chosen by the owners of the factory to ensure the best possible damage prevention monitoring system available.