FEED vs Detail Engineering, what can be wrong?

FEED vs Detail Engineering, what can be wrong?

Front End Engineering Design (FEED) and Detail Engineering are two different stages in the project life cycle which had different purposes and deliverable. In term of project milestone FEED is performed before the final investment decision (FID) with objectives to defines technical and project specific requirements which required to develop cost and schedule for FID consideration. While Detail Engineering is occurred after the FID (normally part of the EPSC Contract) which deliver cascade detail of the FEED result for construction and commissioning.

At high level, the comparison between FEED vs detail Engineering can be summarized on the table below,

Table 1 FEED vs Detail Engineering Comparison summary

What can be wrong between the two? First is Scope definition. FEED defines the technical and project-specific requirements, while Detail engineering develops the construction drawings and specifications. It is important to have a clear and consistent scope definition throughout the project and avoid any major changes or deviations that can increase the cost and duration of the project. In one side sometimes we are going too detail during the FEED where it can prolong the duration of the FEED. In other hand during detail engineering, we are tempted to perform scope changes which normally should be freeze during the FEED stage that led to rework, errors, and conflicts in the design and execution phases. Mistakes on scope and definition can significantly impacted the project cost and schedule. ?A clear and consistent scope statement, a work breakdown structure, and solid change management process are mandatory to define the project scope and avoid any unnecessary or unauthorized changes.

Second Interface constraint. FEED and Detail engineering involve multiple disciplines, stakeholders, and contractors, who need to work together and share information effectively. Coordination and communication challenges can arise due to different expectations, standards, languages, cultures, and locations of the project participants. These challenges can result in delays, misunderstandings, and inconsistencies in the project deliverables. You can use a project management plan, a communication plan, and a stakeholder analysis to establish the roles, responsibilities, and expectations of the project participants. You can also use a collaborative platform, a document management system, and a quality assurance system to share information and ensure consistency and accuracy

The last and the most common one is Quality of deliverable. FEED and Detail engineering need to ensure the quality and safety of the project design and execution, by following the specifications, standards, and regulations applicable to the project. Quality and safety challenges can arise due to lack of expertise, experience, or resources, as well as human errors, technical failures, or external factors. These challenges can compromise the project performance, reliability, and integrity, and pose risks to the environment and human lives. Quality management plan, a safety management plan, and a risk management plan to identify, assess, and control the potential quality and safety issues in the project. You can also use a quality control system, a safety audit system, and a risk mitigation system to monitor and improve the project performance, reliability, and integrity

At the end each project may have its own specific challenges, depending on the project scope, complexity, and context. Therefore, it is essential to identify, analyze, and mitigate the potential challenges in each project stage, and adopt best practices and lessons learned from previous projects. Having a success FEED and detail engineering will provide you a strong foundation to achieve the project objectives

Stefan Weichert

Only when you are able to give a concise explanation can you be sure that you have understood it.

4 个月

Interesting read, thank you! A sidenote: I see this coming up more and more among non-native English speakers . Third person "s" and plural "s" are very often used wrongly or left out, I'd advise using a grammar checking program (MS word can do that fairly well). I would want to be made aware of my language mistakes, so I hope you don't mind :)

回复
Yev D.

Offshore Project Engineer | Oil and Gas | Naval Construction

1 年

Firdauzi . Well laid out. I especially liked this passage: “A clear and consistent scope statement, a work breakdown structure, and solid change management process are mandatory to define the project scope and avoid any unnecessary or unauthorized changes.” Scope management is tricky, especially when you uncover that what you thought worked in FEED doesn’t work anymore. That’s why change management is a great tool to deal with the scope control. Have you written about the change management yet? ??

KS Tomar

Lead Piping Engineer at Modec

1 年

During the feed engineering, Consideration of historical data and past projects experience with lessons learnt is also very important and valuable, which comes alongwith good engineering commonsensed personality/engineers especially for layout domain.

回复
KS Tomar

Lead Piping Engineer at Modec

1 年

During the feed engineering, Consideration of historical data and past projects experience with lessons learnt is also very important and valuable, which comes alongwith good engineering commonsensed personality/engineers especially for layout domain.

回复
Shakeel A.

3D Model/Layout Engineer at North Oil Company Qatar

1 年

For me very simple to this topic: Need to hire experienced team who has do e similar job in EPCIC phase as well and already aware what will be coming in next phase of detail engineering means need to keep sufficient space for that because everything cannot be shown in FEED phase and FEED has limited mandate and different level of requirements not same as required for detail engineering phase so in other words FEED team (engineers) must know how much extra space required and that shouldn't be cut even some managers/structural team ask to cut the space but your job is to defend it and don't do wrong assessment just to reduce the weight/cost in FEED. And major factor of changes in detail engineering phase requirements from FOPs team which should have taken care in FEED stage itself and no extra requirements should be entertained in DE phase. This few points can reduce a big GAP in two phases.