Louis McGarry, Centiel UK explains the key considerations for a successful Uninterruptible Power Supply (UPS) installation.

How many times have you purchased something then later, it’s not turned out quite like you’d hoped or anticipated??We are often called in to see organisations in this situation where a UPS has been installed by others and it’s not delivering on its promises.?However, for many years we have been on a mission to change this around.

The fact is that you can’t fully understand and complete a successful UPS installation from behind a desk.?There are many variables relating to the power infrastructure including space, other equipment, environment, and timescales.?As manufacturers and suppliers, it is our responsibility to deliver clean, continuous power with the most available systems and at the same time, ensure all the other elements which can impact successful UPS installations are also considered and resolved.?It is often these factors which can end up compromising the original system design and if suppliers are not careful, the system provided may not meet the intended performance requirements.

We know from our own experience that there will be changes during projects, but this doesn’t mean that the client has to compromise their critical power and availability. Working with our team of experienced engineers who understand how to design and implement flexible UPS systems, can offer short-term and long-term savings without lowering the performance criteria.?It’s not just big changes that can make a difference, it can be the simple things such as the correct labelling of DC cables or supplying proper containment or completely re-imagining the room layout.?For us it’s about working with whatever the situation requires to ensure our UPS always does what it says on the tin.

Getting the Installation Right

The installation can be impacted by other trades ‘working on top of each other’.?Timing is the all-important element here.?Over the course of a project, timelines will inevitably shift, and they are always on the tight side!?Therefore, keeping in constant communication with others involved in the project can help.

Protection of Equipment

Once the UPS has been installed it is important it stays safe while the rest of the build is completed.?We try and mitigate the risk by protecting the UPS and the batteries, putting up barriers and if possible and making the room secure.

Maintenance

As manufacturers we have a duty of care and our relationship with the UPS doesn’t end once commissioning is complete. It is essential that trained engineers undertake regular maintenance visits to ensure component health is monitored and corrective actions are taken to prevent potential failures.?Understanding when remedial actions may be required will allow for budget discussions and planning to take place.

Again, we are focused on expecting the unexpected, always aiming to remove risk and maximise overall system availability as far as possible.

Selecting the most optimum solution means working in close partnership with manufacturers, contractors and consultants to meet the requirements for critical power protection and to help overcome the inevitable challenges experienced on any project.?At CENTIEL we are trusted to deliver to expectation every time and to support our clients and their equipment now and in the future.

Originally featured in?Inside Networks Magazine?September 2021.

要查看或添加评论,请登录

Louis McGarry的更多文章

  • Optimising Data Centre Energy Efficiency

    Optimising Data Centre Energy Efficiency

    TO OPTIMISE ENERGY EFFICIENCY IT’S IMPORTANT TO TALK TO THE RIGHT PEOPLE. JOINED UP THINKING, TAKING INTO CONSIDERATION…

    1 条评论
  • Never Assume

    Never Assume

    When purchasing new equipment or replacing a legacy UPS system, inevitably facilities managers will become involved in…

    2 条评论
  • Planning tier classification for data centres

    Planning tier classification for data centres

    SYSTEMIZED PREPARATION AND GROWTH PLANNING CAN HELP SMOOTH THE PATH FOR THE EXPANSION OF DATACENTRES. HOWEVER, EARLY…

  • Fact Finding Mission

    Fact Finding Mission

    LOUIS MCGARRY, SALES & MARKETING DIRECTOR, LOOKS AT WHY LESS INFORMATION CAN LEAD TO MORE INTERPRETATION WHEN IT COMES…

  • Making the Most of Modular

    Making the Most of Modular

    LOUIS MCGARRY, SALES AND MARKETING DIRECTOR, CENTIEL UK, EXPLORES HOW MODULAR CONCEPT DATA CENTRES COULD HELP TO REDUCE…

  • Cheap at Half the Price!

    Cheap at Half the Price!

    Something that really irritates me, is the lack of value associated with maintenance plans and I don’t just mean money.…

  • The Map Is Not The Territory

    The Map Is Not The Territory

    “The expected never happens; it is the unexpected always.” John Maynard Keynes, British economist.

  • Making the Next Ten Years More Cost Effective than the Last

    Making the Next Ten Years More Cost Effective than the Last

    The key question that any datacentre manager asks is: ‘how can you make the next ten years more cost effective than the…

  • Managing Power Continuity

    Managing Power Continuity

    How do you correctly size a UPS system? The million dollar question! Well maybe not quite the million dollar question…

  • When Small Spaces Become a Big Challenge

    When Small Spaces Become a Big Challenge

    All installations have their own challenges regardless of size. It might be logistics, budget or fitting in with tight…