Everokgroup moved a 53-ton cable coil from Shanghai to Oman by BB vessel. BB movements should be easy, but this one was challenging.
- RORO Vessel: Lianyungang- Oman
- Description: Cable Coil
- Total: 1 unit
- Dimension: 4724 × 2845 × 4496 mm
- Gross Weight: 53,028 kg
Due to the coronavirus epidemic situation, the ship owner informed us the vessel would cancel Shanghai, notifying us at the last minute before the vessel arrival. Our cable coil would be postponed to the next voyage if all goes well, with the departure date in April.The customer hurried and wanted to ship this cable coil immediately and asked to ensure shipment loads before the end of March at all costs.
We urgently coordinated with the ship owner, shipping agent, terminal, trucking company, and inspection company to change the port of the goods to Lianyungang Port. Although the ship was already at berth no. 64 in Lianyungang Port (with only 25-ton quay cranes) as we received the notice, we did not give up. There are more solutions than difficulties. With our efforts, we successfully coordinated with the ship owner to berth at no.55 and completed the perfect loading with the 500-ton mast crane at the berth.