Everokgroup Handles 6 Packages of Blades from China to the USA by BB Vessel

Everokgroup Handles 6 Packages of Blades from China to the USA by BB Vessel

During the epidemic situation in Shanghai, it’s hard to move special cargo with a length of 71m.?Everokgroup?used hydraulic pressure low bed trailer to move all the blades from factory to port.

No alt text provided for this image

Shipment details:

· BB Vessel: China-USA

· Description: Blades

· Total: 6 packages

· Trade term: EXW

· Total: 157,842 KGS /5889.79 CBM

· Dimension: 71.58x 4.52 x 3.03M

No alt text provided for this image

We had many difficulties, such as special cargo road permits, port congestion for unloading the blades at the port, bad weather, loading vessel, stowing at the vessel, and so on. Everokgroup’s project team performed well under challenging circumstances and loaded the cargo safely and on time for sailing.

No alt text provided for this image

Contact: Billy Hu <[email protected]>


Read more cases: https://www.wcaprojects.com/CaseStudies/

要查看或添加评论,请登录

WCA Projects的更多文章

社区洞察

其他会员也浏览了