Numerous individuals & companies have reached out to our team to ask for a “simplified” explanation of the process towards generating their own energy. Through conversations, a common misconception is that these systems only make sense for large industrial customers, or ultra specific circumstances. While this is somewhat true for a 20MWe/t+ system, there are several applications on the smaller scale that make sense. Part of the challenge is the murkiness of the applications/engineering & procurement process for bespoke systems. Potential projects get sidelined or passed over due to the costs of evaluation. Point8 is well versed in providing fast and accurate go/no go analysis to prevent and avoid costly feasibility studies. Often times, its rather expensive and time consuming for an end user to aggregate all the services and regulatory considerations that go into these types of projects. This is where we provide maximum value.
Point8 Power Systems specializes in analyzing & identifying valuable opportunities to generate onsite energy. We take it further by providing all of the services noted in the 10 steps below. From pre-engineering and feasibility all the way through to construction, operations & reporting; our company captures the whole process and offers finance solutions with on-going support to execute.
Cogeneration systems offer a sustainable solution for generating electricity and useful heat simultaneously. Exporting excess energy after baseload is met can be a lucrative endeavor. In Alberta, setting up a cogeneration system for export requires careful planning and adherence to regulatory requirements. On offer is our simplified step-by-step process to help navigate through the complexities of establishing such a system.
The Steps:
Step 1: Conduct a Feasibility Study Before Proceeding. Conduct a comprehensive feasibility study to assess the viability of the project. Evaluate factors such as energy demand, available fuel sources, site suitability, environmental impact, and economic feasibility.
Step 2: Technology Selection and Design. Select the appropriate cogeneration technology for the project based on factors like fuel availability, efficiency, emissions, and cost-effectiveness. Working with Point8 Power Systems, you receive qualified engineering and equipment specification to design the cogeneration system according to the specific jurisdictions regulatory requirements and industry standards.
Step 3: Obtain Necessary Permits and Approvals. Secure all required permits and approvals from regulatory authorities at the municipal, provincial, and (if applicable) federal levels. This includes environmental assessments, development permits, electrical permits, and any other relevant approvals.
Step 4: Interconnection Process. Initiate discussions with the Alberta Electric System Operator (AESO) and local distribution utilities to facilitate the interconnection of your cogeneration system to the grid. Coordinate technical studies, negotiate interconnection agreements, and ensure compliance with grid connection requirements.
Step 5: Micro-generation Agreement (if applicable). If the cogeneration system qualifies as micro-generation under Alberta's regulations, apply for a micro-generation agreement with the Alberta Utilities Commission (AUC). This agreement allows for the export of excess electricity to the grid at regulated rates.
Step 6: Metering and Monitoring Installation. Install metering and monitoring equipment to measure electricity generated by the cogeneration system accurately. Ensure compliance with metering requirements outlined by regulatory authorities and grid operators.
Step 7: Construction and Commissioning. Commence construction of the cogeneration system according to approved plans and specifications. Upon completion, conduct thorough testing and commissioning to verify the system's performance, safety, and compliance with regulatory standards.
Step 8: Operations and Maintenance. Establish comprehensive operations and maintenance procedures to ensure the reliable and efficient operation of the cogeneration system. Implement regular maintenance schedules, monitoring protocols, and performance optimization strategies.
Step 9: Compliance Reporting. Submit periodic compliance reports to regulatory authorities, including data on electricity generation, grid export, emissions, and other operational parameters. Ensure timely and accurate reporting to maintain regulatory compliance.
Step 10: Monitor Market Dynamics. Continuously monitor market dynamics, regulatory changes, and technological advancements relevant to cogeneration and energy export in Alberta. Stay informed and adapt strategies accordingly to maximize the profitability and sustainability of the project.
As a trusted partner for several utility grade customers, this is a process Point8 is specialized in providing to prospect and existing energy producers. The landscape for power generation is continuously shifting in Alberta, however, we keep well abreast of the changes to make sure our projects are seamless.
Establishing a cogeneration system for export in Alberta requires careful planning, diligent execution, and ongoing compliance with regulatory requirements. By following our internal and external step-by-step process, stakeholders are not alone in navigating the complexities of a project while contributing to the development of sustainable energy infrastructure in the province.
At Point8 Power Systems, we continuously evaluate market conditions to provide financially prudent and ecologically considerate energy systems as a full solutions provider.
Get in touch with us to discuss your goals. Let's build together.