Eight Maintenance Methods of Alternating Humidity and Temperature Test Chamber
Cathy Zhang- Sanwood Environmental Chambers Co.,Ltd

Eight Maintenance Methods of Alternating Humidity and Temperature Test Chamber

After buying the alternating humidity and temperature test chamber, it also needs maintenance such as filter cleaning, electrical component and line inspection,etc. Here, Sanwood will tell you some maintenance methods of the alternating humidity and temperature test chamber. The details are as follows:

1. Check all electrical circuits and electrical components of the alternating humidity and temperature test chamber to ensure reliable operation and good contact.

2. Refrigeration system cleaning: change the refrigeration oil and clean the oil filter.

3. Leakage inspection of the refrigeration system: Inspect all connected parts of the refrigeration system and the connection parts of the valve plate for leaks and tighten them.

4. Water circulation system cleaning, water filter cleaning, filter replacement, check the operation of the pump, including whether the water flow switch works well, adjust the water circulation flow, and test operation.

5. The air filter needs to be replaced in the alternating humidity and temperature test chamber

6. Inspection of consumable parts of refrigeration system: Check the seal of compressor and connecting components, and replace all filters.

7. Replenish the refrigerant according to the working conditions: check whether the system refrigerant needs to be replenished to ensure effective cooling power.

8. System comprehensive operation: Check whether the condition of each running component is good.

For more information, please kindly visit our website:

https://www.sanwood.cc;

https://sanwood.en.alibaba.com;

https://www.dhirubhai.net/company/sanwood

Thank you for your attention and if you have any inquiries, please feel free to contact me at [email protected] :)

要查看或添加评论,请登录

ariel S.的更多文章

社区洞察

其他会员也浏览了