Egis design bridges with Style ! Episode 8
Viaduc of Santo Amaro Station @Fulvio Souza

Egis design bridges with Style ! Episode 8

Episode 8 : Cable-Stayed Bridges in South America

Santo Amaro Train Station Bridge in Sao Paulo

Between 1998 and 2002, Egis Bridge Departement (formely JMI) in partnership with Studio DE MIRANDA and Logos Engenharia, realized the conceptual, preliminary, detailed design, shop drawings and technical assistance on site for the Cable-stayed bridge over the Pinheiros River including the Santo Amaro metro station on the new double-track urban train line. The deck suspension consists of a single axial semi-harp cable layer from a unique tower. The prestressed concrete deck comprises a box girder and precast triangular trusses to support the train tracks. The foundations of the 53-metre high tower are made of box-well, driven in the bed rock by compressed air. The bridge was built by cantilever in 6.50 metre segments. The 13.5 metre wide prestressed ribbed deck slab has a total length of 225 metres. The main span is 110 m.

Aucun texte alternatif pour cette image

Puente de Las Americas @Egis

Las Americas Bridge in La Paz

Ten years before, Egis also designed acable-stayed bridge in La Paz (Bolivia) : Puente de Las Americas. A Single prestressed slab cast in place. Length of 225 m, spans of 57.5 m – 110 – 57.5 m. 2 pylons of 28 m above the deck and 4 piers of 2.25 m. The deck is longitudinally post-tensioned by two groups of 9 x 15 mm diameter strand tendons. transversely, the deck has only passive reinforcement; a?transverse 9 x 15 mm diameter strand tendon is placed every 10 m at the cable-stay anchorage to accommodate the load transfer from stay to deck.

An article was published about this bridge during the International Conference IABSE-FIP:?Cable-stayed and suspension bridges, Deauville, France, 12-15 October 1994. More information here.


Frémont Guy

Consultant chez Ing. Frémont

2 年

Je connais bien cet Ouvrage de Santo Amaro, sur le Rio Pinheiros. Il porte une Gare et 2 voies type RER. Le BET local était ENESCIL à Sao Paulo, et l'Entreprise OAS. Les haubans sont de TENSACCIAI. J'ai eu l'occasion d'aller parfois à SP pour rencontrer nos interlocuteurs durant les études et l'exécution. D'où un album photo de l'alpha à l'omega, que j'utilise parfois. Très belle photo que je vais y joindre.

回复

要查看或添加评论,请登录

Louise Valet的更多文章

  • Egis design bridges with Style ! Episode 7

    Egis design bridges with Style ! Episode 7

    Episode 7 : Reconstruction of the Old Bridge in Mostar Destroyed in 1993, during the war in Bosnia-Herzegovina, the Old…

    1 条评论
  • Egis design bridges with style! Episode 6

    Egis design bridges with style! Episode 6

    Episode 6 : Precast Segmental Infrastructures in Bangkok With an ever increasing population and a current roadway…

    1 条评论
  • Egis design bridges with style! Episode 5

    Egis design bridges with style! Episode 5

    Episode 5 : The strength of Low Arch Bridges Low arch bridges provide impressive pictures. Indeed, their slenderness as…

    1 条评论
  • Egis design bridges with style! Episode 4

    Egis design bridges with style! Episode 4

    Episode 4: Cable Stay Bridges in Bangkok The Chao Phraya is a major river in Thailand flowing through Bangkok before…

    1 条评论
  • Egis design bridges with style! Episode 3

    Egis design bridges with style! Episode 3

    Episode 3: Large style bridges Steel became an essential material in the construction industry thanks to its…

  • Egis design bridges with style! Episode 2

    Egis design bridges with style! Episode 2

    Episode 2: Large prestressed concrete viaducts in Portugal One of the greatest innovations in concrete construction is…

    2 条评论
  • Egis design bridges with style! Episode 1

    Egis design bridges with style! Episode 1

    Episode 1: High-speed line viaducts High-speed lines are major national issues because they drastically reduce the…

    4 条评论

社区洞察

其他会员也浏览了