EBoM vs MBoM

EBoM vs MBoM

A Bill of Materials (BoM) is often compared to a recipe - both identify and list the components of a finished product. While the recipe identifies the required ingredients, preparation steps and presentation recommendations, in manufacturing terms the BoM identifies and lists all raw materials, sub-assemblies, with layers of data that are interrelated, including even intangibles that contribute to the costs of manufacturing a product. Like recipes, there are different types of BoM based on their usage, complexity, accuracy, levels of detail, etc.; critical aspects of product creation rely essentially on Engineering and Manufacturing BoMs and how they interlock in context of the Product Life-cycle Management (PLM).

Producing products with a wrong or faulty component in an EBoM is not so easily resolved. Last minute root cause analysis and rework on a live production line or a mature product component can be very costly.

The earlier BoM issues are identified and addressed, the lower the cost impact on product Engineering and Manufacturing. 

Late identification of BoM issues can negatively impact company performance through:

  • BoM synchronisation issues, e.g. with Engineering issues leading to Manufacturing issues, or Manufacturing issues requiring both costly Engineering and Manufacturing changes (shop floor process, manufacturing process, material, supplier data, etc.).
  • Costly and inaccurate manual interventions to resolve issues - leading to potential compliance issues, additional BoM 'admin' branching and overarching 'admin'.
  • Inaccurate inventory levels, supplier cost issues.
  • Incorrect product costing and potential accounting variances (ie negative cash flows due to overspends or inaccurate financial forecast and budgeting).
  • Warranty issues and customer returns or recalls, with potential commercial liability claims and leading to potential brand perception issues.
  • Production out-of-spec components.

There are different schools of thought with regards to EBoM and MBoM alignment. Synchronising and maintaining EBoM and MBoM alignment requires a lot of preparation, as what is managed on the Engineering side differs significantly from the Manufacturing side (approach, usage, life-cycle, dependencies, etc.); the two need constant alignment and maintenance to ensure seamless business continuity (...).

A complete and accurate EBoM can better prepare manufacturing for production runs and supports the New Product Introduction (NPI) process along the way. PLM has become the ultimate 'tool' to synchronise EBoM and MBoM, integrating an Engineering feedback loop to Product Development, though the there are still debates about where the MBoM is to be 'mastered', either in ERP or PLM...

 What are your thoughts?

Luke Maurer

Production Quality Specialist at Wabtec Corporation

2 年

Very Helpful ??

回复
Monte R.

President & CEO

4 年

Clearly and accurately explained

回复
Umashankar Vaithiyanathan ??????

SAP S/4HANA Supply Chain Transformation Journey. Chasing Perfection. Leading to win in line with behavioral as well as leadership expectation skill-set. Challenge accepted. Impossible is nothing.

5 年

PLM cum ERP like JD Edwards and/or SAP. PLM tool itself Only!

回复
Amit Kapoor

Project Manager| Certified Project Manager| X-Functional Leadership| Adaptive| Predictive| Hybrid

7 年

Nice article from the view of EBOM and MBOM

Prajeesh Kumar Gopalan Nair

PLM Leadership,Windchill, Thingworx, DevOps, PLM,SLM,Manufacturing, NPI, Enterprise Architecture, PLM, Data Analytics

7 年

A great article Indeed. Now on the MBoM should reside,I will go with where it get originated So it should be in PLM with sufficient information and with a balanced flow of information from ERP and MES and vice versa. The problem I believe is the way we integrate with other system and the amount of information we share. As Lion mentioned in one of his earlier post, with a balanced reliable integration, we can have a single source of truth with different view perception. it can be either an Engineer or a Manufacturing Engineer or a configuration engineer. Just my thoughts

回复

要查看或添加评论,请登录

Lionel Grealou (グレアルー?リオ)的更多文章

社区洞察

其他会员也浏览了