Donghua Chain helps Hangzhou Metro open

Donghua Chain helps Hangzhou Metro open

No alt text provided for this image

At 11:00 this morning, the first phase of Hangzhou Metro Line 3, the second phase of Line 4, and the first phase of Line 10 were opened at the same time. Donghua escalator chain is fully equipped with these three lines.

No alt text provided for this image

The first phase of Metro Line 3 is about 52 kilometers long, with 35 stations, all of which are underground. The main line starts from Wenyi West Road Station and ends at Xingqiao Station, with 31 stations.

No alt text provided for this image

The second phase of Metro Line 4 has a total length of about 26 kilometers. It starts from Pengbu Station of the first phase of Metro Line 4 and ends at Chihua Street Station, with 15 stations.

No alt text provided for this image

The first phase of Metro Line 10 is about 14 kilometers long, starting from Yisheng Road Station and ending at Huanglong Sports Center Station, with 12 stations.

No alt text provided for this image

Donghua escalator chain products include commercial type, public transport type, moving sidewalk type, etc. After more than 20 years of development, products from a single variety to a full range of varieties, from a single structure to a green structure, from Donghua manufacturing to Donghua creation, share with customers the new product experience brought by technological innovation. At present, more than 50 cities in China have opened subways, all of which are equipped with Donghua escalator chains. At the same time, Donghua escalator chain sells well overseas, and has provided escalator chain products for the top ten elevator brands in the world, with a full sales network.

Jay Yang

[email protected], 0086 152 6785 0241

要查看或添加评论,请登录

Jay Yang的更多文章

社区洞察

其他会员也浏览了