Discussion: Class 5 through 1 Estimates

Class 5 through 1 Estimates

Saturday, December 2, 2017 10:23 AM

For conversation, how may have performed Class 5 through Class 1 cost estimates as described by the AACE (American Association of Cost Engineers)?

 I'll begin with my career in estimating. I have estimated, using the class 5 through 1, for Banks, Hospitals, Libraries, Detention Centers, Health Units. Some of these were for private clients who had to establish a budget before the building contracts were issued. Of course, the private ones sometimes involved many months between the budget and the actual construction start.

 I have also performed the Class 5 through 1 for industrial (process) projects. These included the feasibility and budgetary numbers. Some were for partial industrial systems, but 2 were for complete industrial facilities.

 One excellent source for Class 5, 4 and 3 estimates is "Means Facilities Construction", which includes SF estimating.

John G. McConville CCP

Construction Cost Expert & Author of (11) Cost Estimating Books / Databases on US & Global Construction Costs & Labor Productivity:

7 年

Hello Tony, I and key members of my staff have compiled literally 100's of AACE International Class 5 through Class 1 Estimates, specific to Oil & Gas, Refineries, Pipelines, Offshore, Pharmaceutical, Manufacturing & Commercial type facilities, check out our website for details of our (7) Compass International construction cost books. https://www.compassinternational.net/books/

要查看或添加评论,请登录

Tony Lowery的更多文章

  • Fly-by-night entrepreneurs

    Fly-by-night entrepreneurs

    Once every permit office, university, and politician in the U.S.

  • Project Control Engineers

    Project Control Engineers

    Project Control Engineers As a Guild of Project Controls Fellow and one who is also an Assessor aiding in the…

  • For a Center of Excellence

    For a Center of Excellence

    For a Center of Excellence General Note: In this modern electronic age, there is no need for relocation or daily travel…

  • Proper Scheduling

    Proper Scheduling

    Some of you who call yourself schedulers, don’t take this personally, as you are giving others precisely what they…

  • Purpose for a Center of excellence

    Purpose for a Center of excellence

    Purpose Project Controls is a science, and modern scheduling software was designed with the needs of a Professional in…

  • Consolidated Projects by a world Expert 00011

    Consolidated Projects by a world Expert 00011

    Consolidated Projects Nine hundred ninety-eight each sub-project or sub-Csectional can be attributable to and…

  • Article for Linked-In

    Article for Linked-In

    Article for Linked-In I’m still trying to convey that the only accurate schedule is one that encompasses the total…

  • A bit of Pre-notice or perhaps forewarning

    A bit of Pre-notice or perhaps forewarning

    A bit of Pre-notice or perhaps forewarning As a World-class Fellow and expert Planner/Scheduler, GPS #00011, with the…

  • A bit of Pre-notice or perhaps forewarning

    A bit of Pre-notice or perhaps forewarning

    A bit of Pre-notice or perhaps forewarning As a World-class Fellow and expert Planner/Scheduler, GPS #00011, with the…

  • COE Center of Excellence

    COE Center of Excellence

    COE Center of Excellence Hello, The truth is stranger than fiction and still remains so even in this 21st-century stage…

社区洞察

其他会员也浏览了