DG PV Controller (DG Synchronization Of Solar Rooftop Grid Connected System)

DG PV Controller (DG Synchronization Of Solar Rooftop Grid Connected System)

There are various issues involved with solar grid inverter for Indian conditions. Now in this blog, I will be discussing more the issues and methods to integrate/synchronize a grid-connected inverter with diesel generator during a power cut/grid failure. In states like Maharashtra, we have power-cuts every day, so the solar rooftop owner will try to consume all the power generated from solar and reduce its dependence on diesel generators.

The inverters do not start without the reference voltage and frequency, so during this islanding condition, the rooftops owners cannot use their solar power generated. The owners usually consider solar as a backup for power cuts and also consider payback by selling excess generated. Now the only solution in the market is the hybrid inverters, but these are very expensive compared to normal grid inverters. But what about installations with existing grid inverters? Most of the rooftop owners are not aware of these islanding conditions and the EPC vendors just install existing grid inverters without any alteration proposed below.

What I propose here is, the grid inverters need to be connected to a common bus bar. In the common Bus-bar, all the sources and loads are connected. During the islanding condition, the DG switch ON to generate reference voltage and frequency to start up the solar grid inverters (we fool the inverters here). Once the inverter is ON the load will be supplied by both inverter and DG sets (at low RPM). Is it practically possible to synchronize a grid-tie inverter with a diesel generator (DG sets) and make it work? ie. during a power failure, when grid power is not available.

I feel it's possible only under the following condition's 

  • We have a stable/good quality generator which gives good stable voltage and frequency. 
  • The other condition is the generator should not sag, dip or create any surge current when the inverter turns ON. 

Lets now consider that the inverter has turned ON using the DG sets reference voltage and current. I see two possible conditions now,

  1. The load is always more than the PV generator supply
  2. The possibility that load can be less than PV generator supply

During the condition 1, I do not see any issues if everything works fine. But during condition 2, the power generated from PV will be greater than the load requirements and hence there is a possibility that this current will be fed to the ac line of the bus bar / DG sets (stator of DG sets). What will happen during this condition? We can expect a rise in AC voltage and frequency- above a critical level. If this happens, this condition can trip the inverter due to over-voltage/frequency protection circuits. Now the rooftop owner cannot consume power from the solar and therefore he is forced to operate the DG sets. This condition can also damage the vital parts of the generator, here the protection of generators become very important. 

How to custom design the distribution panelboard to use the solar generator during condition 2 and also protect the DG sets? I also foresee a very high requirement of a effective control system, which can handle all the above and below conditions

- Using a dump load to remove the excess power generated. 

- Effective control of loads (To increase or decrease the load as per requirements using PLC-based controls) 

I can also see that there will be no commercial benefit in running a generator just for reference voltage and current. This is because when we operate the DG sets running at lower efficiency (20-30%) or less than its rated value can consume more fuel than during rated power (ie. 85-100% efficiency). This can be solved by using smaller DG sets (Just for the emergency load) than the required full load size, but the disadvantage is during a power failure in the evenings or at night.

While considering a Grid-Tied inverter the load pattern (early morning and evening peaks), grid availability (Grid Tied inverters can be tricky at times of frequent power failures), grid quality, the feed-in tariff (if available) have all to be reckoned and coordinated with. However, the challenge lies in designing an efficient power management control system for smart and economical power consumption.

In case your solar plant is facing grid failure, or low or high voltage, reach to Lume Solar on (+91)8055505856 or at [email protected]

Prosumers Solar will ensure your DG set comes into service. PV system shall be synchronized with DG supply and load requirement would be met to the extent of availability of power”.

Virendra Bhagwat

Sarabjeet Randhawa

Director@Center for Science and Environment

1 年

This article is a complete RIP OFF of an Article written on Linkedin by Suhag Patel(Manager Engineering at TORRENT Power in 2016!! Word to word-only font has been changed. While researching on the issue i read his article first and this one next ONLY 5 minutes apart.

回复

Thank you for your efforts

回复
Karthik Chikmath

Director at Akash Consultants | 2nd Gen Entrepreneur | District Rotaract Representative Elect - Dist 3191 | Past President - Rotaract JP Nagar | MEP Consultant | Electrical Engineer

3 年

Very well written article Sir, Thank you !!

回复
Dr. Arunkumar Gunasekaran

Chief Infra-Solutions Officer (CISO), Professor - Electrical Engineering, / Rathinam Technical Campus.

3 年

Dear sir I have gone through the article Need few clarifications Could you help me

回复
shailendra prefab

Director at Shailendra Prefab-Solar Modular Foundations-economical and fastest

5 年

Dear Sir, Greetings. We can avail fastest, modular, most economical, ready to install foundation/ballast for such structure. Kindly suggest your enquiry at [email protected]. Looking forward.

回复

要查看或添加评论,请登录

Virendra Bhagwat的更多文章

  • Solar Power: Is it the Right Time to Invest in it?

    Solar Power: Is it the Right Time to Invest in it?

    In this article, we try to understand financial feasibility of solar power and evaluate whether it is right time for…

    2 条评论
  • How Do Solar Rooftop Power Pla Benefit Colleges/Schools?

    How Do Solar Rooftop Power Pla Benefit Colleges/Schools?

    In this blog we evaluate the benefits of installing solar rooftop power plant for school and colleges. And discover…

    1 条评论
  • Prosumers Solar and Team

    Prosumers Solar and Team

    EMPOWERING YOU WITH THE RIGHT EDUCATION We conduct educational seminars across the country so that people are aware of…