Dextrans China & South Korea Capping Off a Busy Month of September

Dextrans China & South Korea Capping Off a Busy Month of September

The month of September started off with Dextrans China arranging a heavy lift vessel to ship a grinder and parts from Lianyungang to Alexandria. The shipment consists of one unit main machine weighing 133 metric tons and other parts.

With considerable weight of the main machines, proper planning & execution were carried out seamlessly and capping off with the shipment departed Lianyungang port on the 9 Sep 2024.



Across the Yellow Sea, Dextrans Korea completed 5 lots of shipment of press machines which were loaded in 20 x 40’HC, 10 x 40’FR and 6 packages on breakbulk basis. This shipment was loaded in Busan Port destined Nhava Sheva Port involving loading of the heavy cargo from a barge using a floating crane.


With sizeable volume and some cargoes weighing at 95 tons, close coordination & planning were put in place to ensure execution were done precisely and flawlessly on each lot of the shipment.

All five lots of cargoes were loaded safely and on schedule.



For more information, please contact

Dextrans China - [email protected]

Dextrans Korea - [email protected]


Read more cases: www.wcaprojects.com/CaseStudies

回复
PRABU IAJ

General Manager - Business Development

1 个月

Impressive

  • 该图片无替代文字

要查看或添加评论,请登录

WCA Projects的更多文章

社区洞察

其他会员也浏览了