Decommissioning: Challenges to access the wells on shallow water
Hey Folks,
?
Let’s talk about the challenges for Decommissioning for mature oil fields in Brazil.
?
Sometimes 50% of success of the decom campaign is to have access of the XT/Well, but in this case below was 60% due all limitations :
?
?
This well was big milestone for the decom campaign and after a lot of brainstorms and meetings with suppliers we took the decision to use the Tethering System to increase the red watch circle and perform the access.
?
After spent five months for engineering analysis, developed Gravity Bases Anchor locally and performed some FEA’s finally we got a good result to proceed with DP vessel increasing the red witch circle above 6m, but inside of the vessel limits.
?
Spent 30 days on this well , one disconnection due the weather condiction however the barriers were installed and the well decommissioned.?First time in Brazil a well access with 101m water depth , workover package and DP vessel to decom the well.
?
We are changing the way to perform Decom in shallow waters here in Brazil.
?
“Challenges are an opportunity to test you and rise for the next level”.
Company Representative / DSV / Company Man
1 年Well done Carlos! It is an honor to take part of this project with you and your team. Success for us all!
Project Manager at Oceaneering
1 年Pround to be part of this Project!
Rig Client Rep
1 年Well done, Carlos! Why do you use it in Shallow water, using EDP and LWRP - technology of ultra deep water? What's the purpose of it?
Cost Engineer
1 年??
Operations Manager | Lead Engineer | Field Engineer | Technical Sales Engineer | Industrial Engineer | Business Administration & Marketing
1 年Great ????