Let’s talk about the challenges for Decommissioning for mature oil fields in Brazil.

?

Sometimes 50% of success of the decom campaign is to have access of the XT/Well, but in this case below was 60% due all limitations :

?

  • XT CBV from 80’s installed at 101m water depth.
  • Low bending moment of the re-entrance XT hub with flange 7-1/16”.
  • Agnostic TRT w/o access of the function lines of the XT.
  • Light Well Intervention Vessel with DP system. ( Another operator ,below 300m, only moored rigs)
  • EDP and LRP Workover package with 70 tons and 5.7m high.
  • Riser analysis of XT and workover System with 0,5m.

?

This well was big milestone for the decom campaign and after a lot of brainstorms and meetings with suppliers we took the decision to use the Tethering System to increase the red watch circle and perform the access.

?

After spent five months for engineering analysis, developed Gravity Bases Anchor locally and performed some FEA’s finally we got a good result to proceed with DP vessel increasing the red witch circle above 6m, but inside of the vessel limits.

?

Spent 30 days on this well , one disconnection due the weather condiction however the barriers were installed and the well decommissioned.?First time in Brazil a well access with 101m water depth , workover package and DP vessel to decom the well.

?

We are changing the way to perform Decom in shallow waters here in Brazil.

?

“Challenges are an opportunity to test you and rise for the next level”.

Rafael Augusto G.

Company Representative / DSV / Company Man

1 年

Well done Carlos! It is an honor to take part of this project with you and your team. Success for us all!

Carla do Carmo Almeida

Project Manager at Oceaneering

1 年

Pround to be part of this Project!

Well done, Carlos! Why do you use it in Shallow water, using EDP and LWRP - technology of ultra deep water? What's the purpose of it?

回复
July Henderson S Caetano

Operations Manager | Lead Engineer | Field Engineer | Technical Sales Engineer | Industrial Engineer | Business Administration & Marketing

1 年

Great ????

要查看或添加评论,请登录

Carlos Alberto Mendes Duarte Filho的更多文章

  • Same Field, same XT, 41 years after...

    Same Field, same XT, 41 years after...

    1982 Installation of the XT, 2023 Decommissioning completed. Diver and Diver-Less operation!!!! This is the Way.

    12 条评论
  • Subsea Challenges for Decommissioning.

    Subsea Challenges for Decommissioning.

    Sometimes, not everything goes as planned. In this last well, our TRT developed a leak in the unlock chamber during a…

    2 条评论
  • Decommissioning challenges to access the Well.

    Decommissioning challenges to access the Well.

    Decommissioning of retired access is a challenge and having the right tool is 50% to enable to start the Job. TRT…

    12 条评论
  • Want to talk about about Subsea Decommissioning?

    Want to talk about about Subsea Decommissioning?

    I'm happy to tell that we decommissioned one more well last week. It was a great achievement to access this well with…

    7 条评论
  • New Ways for Decommissioning

    New Ways for Decommissioning

    Hey Folks, Let’s talk about decommissioning from subsea perspective !!!! As part of Decommissioning Team, we are having…

    30 条评论

社区洞察

其他会员也浏览了