What does building value engineering entail? Value engineering is a collection of methodical tools and innovative approaches used by a building project team to address budget, quality, and scope restrictions. Value engineering refers to approaches that can be used in a building project to reduce costs, improve functional performance, and provide high-quality work.
What stage of a building project might value engineering be applied to? Implementing value management approaches at every stage of a project’s life cycle is feasible. However, it has been found that applying value engineering techniques within the project’s initial planning and designing phase yields the greatest benefits.
- Information Stage The aims, restrictions, and limitations of the construction project are identified during this phase, along with its status quo. This stage gathers all required paperwork, such as reports, maps, and project cost information. To check for quality, basic tools like Quality Function Development (QFD) are used.
- Function Phase This stage of value engineering focuses on a project’s functionality and what it would do if all its goals have been met. To gain a thorough understanding of the project, tools like performance-function analysis and cost-function analysis are applied.
- The Imagination/Speculation Stage Engineering minds frequently overlook the creative component while evaluating simple fixes for strategic construction issues. This stage deals with the creation of concepts that would maximize the usefulness of the project’s finished result at a minimal cost. This stage is all about creating concepts that can be used as alternatives to accomplish a construction project’s goals.
- Evaluation This stage involves evaluating every possibility for improving the performance and functionality of the construction. The concepts that can be practically realized in terms of cost, quality, and schedule are chosen. The construction team would pick thoughts or ideas that would give them ample time to come up with solutions that added value to their work.
- Development Phase Shortlisted ideas are developed into solutions that can really be implemented during this stage. Then, to save costs and improve quality and function, these solutions are turned into recommendations that are implemented into the design. These suggestions were chosen after doing a cost-benefit analysis. For better performance, these alternatives can be used in building.
- Presentation Presenting an alternate option to the construction project team, stakeholders, and other decision-makers involved in the building project is the main goal of this phase. The project team shares all the information. All official reports, including risk analyses, cost-benefit analyses, justification documents, value analyses, and scope reports, are provided to the project team during this phase.
It’s important to note that the cost-effectiveness of these techniques can vary based on factors such as project scope, location, regulations, and specific project requirements. A comprehensive cost-benefit analysis should be conducted before implementing any technique to ensure that it aligns with the project’s goals and budget. Additionally, involving experienced professionals, such as architects, engineers, and contractors, is crucial to successfully implementing cost-effective construction techniques.