CONVERSION SIZING

CONVERSION SIZING

S4HANA Upgrade Sizing

This article will provide comprehensive insights into the options and tools available for sizing SAP S/4HANA, both for new installations and upgrades. It aims to address key questions related to the sizing process and provide a clear understanding of how to execute memory, CPU, and disk storage sizing for S/4HANA.

Executing S/4HANA Sizing:

To determine the appropriate sizing for S/4HANA, you can utilize the SAP-specific tool called the S4HANA Quick Sizer. This tool is applicable to both greenfield (new) installations and existing ECC systems. You can access the S4HANA Quick Sizer from the provided link and initiate the tool:

No alt text provided for this image

While the term "quick sizing" might imply a simple process, it's important to note that the tool is quite advanced and requires a substantial amount of input to generate accurate sizing recommendations.

How to fill the quick sizer is explained in OSS note?2467172 – How to size Fiori applications based on the number of users.

Memory Sizing for Upgrading Existing Systems:

For upgrading an existing ECC system to S/4HANA, SAP has introduced a useful tool to assist with memory sizing. To begin, apply the OSS note 1872170 – Business Suite on HANA and S/4HANA Sizing Report in your current ECC system. This note will make available the ABAP report /SDF/HDB_SIZING. It's recommended to initially test this report in a development system and subsequently transport it to the production environment for actual sizing calculations.

No alt text provided for this image

Best to execute in the background. You can then get the results in the spool of the batch job.

No alt text provided for this image

The results give an as good as possible estimation of memory sizing after the database conversion.

CPU sizing for S/4HANA

More details on CPU sizing can be found in?OSS note?1793345 – Sizing for SAP Suite on HANA.

Disk space sizing for S/4HANA

Disc space storage sizing for S/4HANA depends on data aging please see below notes

2869647 - Guidance for use of Data Aging in SAP S/4HANA

2416490 - FAQ: SAP HANA Data Aging in SAP S/4HANA

2818267 - Data Volume Management during migration to SAP S/4HANA

OSS notes

Before running the /SDF/HDB_SIZING program it is best to update it with the most recently available updates:?3104284 – HANA memory Sizing report – Advanced correction 15 or higher?and?3149498 – HANA memory Sizing report – Advanced correction 16.

In conclusion, this article aims to demystify the process of sizing S/4HANA, offering guidance on executing memory, CPU, and disk storage sizing for both new installations and upgrades. The S4HANA Quick Sizer tool plays a pivotal role in this process, and for existing system upgrades, the application of the specified OSS note and subsequent report usage can greatly aid in memory sizing. While the term "quick sizing" may not fully encapsulate the detailed nature of the process, these tools and steps contribute significantly to achieving accurate and optimized S/4HANA sizing results.

No alt text provided for this image
HOME
No alt text provided for this image

Please connect and?follow?me for the next upcoming informative articles.

Cheers :)


要查看或添加评论,请登录

Muhammad Arshad的更多文章

  • HOW TO CLEAN FIORI APPS CACHE

    HOW TO CLEAN FIORI APPS CACHE

    Introduction: In the realm of SAPUI5 application development, encountering issues with code changes not promptly…

    3 条评论
  • Export and Import tables in SAP from OS level (Control file)

    Export and Import tables in SAP from OS level (Control file)

    How to exporting and importing SAP tables using the R3trans utility, which is crucial for database transport tasks. The…

    6 条评论
  • SAP IAG Segregation of Duties (SoD) Matrix

    SAP IAG Segregation of Duties (SoD) Matrix

    SAP Identity Access Governance (IAG) provides cloud-based access risk analysis similar to SAP GRC Access Control. The…

    3 条评论
  • /hana/log is 100% full in Sap Hana

    /hana/log is 100% full in Sap Hana

    If you encounter the issue where the directory is 100% full and your system is unable to start, you may have more…

    7 条评论
  • SAP GRC Post-Installation Steps Guidance

    SAP GRC Post-Installation Steps Guidance

    I received so many request about SAP GRC High level post steps so this article provides a comprehensive checklist for…

    2 条评论
  • SAP Software Update Manager (SUM) Phases and Roadmap

    SAP Software Update Manager (SUM) Phases and Roadmap

    The SAP Software Update Manager (SUM) tool helps automate the upgrade and update processes for SAP systems, including…

    2 条评论
  • SAP ECC to S/4 HANA Conversion Part 2

    SAP ECC to S/4 HANA Conversion Part 2

    SAP ECC to S/4 HANA Conversion: Prepare Phase This document serves as a comprehensive guide for the Prepare Phase of…

    1 条评论
  • SAP ECC to S/4 HANA 2023 Conversion Part 1

    SAP ECC to S/4 HANA 2023 Conversion Part 1

    SAP has announced that support for SAP ECC will officially end in 2027. After this date, SAP will no longer provide…

    11 条评论
  • How to Configure SAP IAG Access Analysis service?

    How to Configure SAP IAG Access Analysis service?

    Configuring the SAP Identity Access Governance (IAG) Access Analysis service involves several key steps. Here’s a…

    3 条评论
  • Career in SAP GRC (Governance, Risk, and Compliance) vs. SAP Security

    Career in SAP GRC (Governance, Risk, and Compliance) vs. SAP Security

    Choosing between a career in SAP GRC (Governance, Risk, and Compliance) and SAP Security depends on your long-term…

    1 条评论

社区洞察

其他会员也浏览了