Continuous Assessment of Deferred Maintenance Items and Trouble Shooting
Joanna Miroslavova
Senior Training Consultant at Sofema Online and Sofema Aviation Services
Introduction
A simple measure of the effectiveness of the operation will relate to the safety and serviceability of the aircraft, the level of Technical Log or Pilot reports “PIREPs”.
Dispatch Reliability
An effective reliability program should identify the problems and support resolution/mitigation by identifying problems and proposing appropriate mitigations.
Case Study Concerning Categorization of Dispatch Reliability
When an airline reliability program over-focuses on dispatch reliability, the likelihood becomes that they only track and investigate problems that resulted in a delay or a cancellation of a flight.?Now consider the following example:
- Did maintenance cause the delay?
- Or was the delay caused by the Elevator Trip Defect?
- Or by Ineffective Airline Procedures?
Alternative Scenario for Consideration
领英推荐
Note:?While the tech team could benefit from this advance warning of problems, it will not always eliminate delays.
Case Study Concerning Allocation of Investigation Resources and Outcomes
Whilst each technical delay will be investigated it may not identify all elements for example if an equipment failure is also involved, then how will the assessment consider this?
- The delay, which could be caused by issues not totally dependent on the failed condition (Systemic Issues)
- The actual problem (multiple re-occurrences of a particular issue)
Conclusion
Any delay within an event-oriented reliability problem should be investigated on its own.
Investigation should also look at the whole operation & finally equipment problems whether or not they caused delays—should be investigated separately.
Next Steps
Follow?this link?to our Library to find & Download related support documents.
Sofema Aviation Services (www.sassofia.com) and Sofema Online (www.sofemaonline.com) offer EASA Regulatory Compliant and Vocational Training across a range of Aviation Areas – please see the following?2-day course?to implement your own MCC – Defect Control Process. For additional details please see our websites or email?t[email protected]