Constructing without timber

Constructing without timber

Timber prices are soaring to all-time highs in the UK. Excess demand and limited supply, leading to extended lead times, make for some difficult budgeting decisions and timescale issues for construction managers.

But there is a simple, fast and cost-effective solution to keep projects on track, on time and on budget –?if you think outside of the box and towards Hünnebeck UK formwork. In this challenging market situation, Hünnebeck UK can offer you very attractive alternatives.

Enter Hünnebeck’s time and cost saving TOPMAX and TOPEC slab formwork products – intrinsically safe and productive, as with all Hünnebeck UK products. Manufactured and made from full plastic composite sheet, minimum or no plywood is required for either TOPMAX or TOPEC! And our ECOPLY full plastic composite sheet lasts significantly longer than wooden ply, as well as being easy to use, efficient and very safe.

The TOPMAX floor table is the premier, high-safety, high-speed formwork solution for large slab surfaces with regular ground plans and repetitive geometries, offering a whole host of benefits:

??Large forming units up to 26m2 can be transferred in just a single crane pick.

??Low transportation volumes and stockyard costs due to low table thickness of just 12cm.

??Low cleaning and repairs due to the powder-coating and all-round edge guard of the form lining.

??Very stable steel frame which is hot-dip galvanised and powder-coated.

And TOPEC is an aluminium modular formwork slab system without beams. This clever, timber-free formwork system makes the shuttering and stripping of slabs much faster and more economical than conventional slab formwork systems.

Like TOPMAX, our TOPEC range offers numerous benefits in this timber shortage construction market, including:

??Robust yet lightweight aluminium design provides ergonomic and fatigue-free handling.

??Fully telescopic adjustment panels.

??Giant panel 180 x 180 cm covers a forming area of 3.24 m2.

??Can be used in combination with TOPMAX floor tables and serves as an ideal and speedy fill-in solution for adjustment areas.

Hünnebeck UK Managing Director, Wayne Fisher said: “With raw material shortage and ever growing demand starting to seriously affect UK construction projects of all scales, we are on hand to provide the perfect fast and safe solutions to keep construction projects up and running and lead times on target. Hünnebeck have products in stock that offer faster, safer construction solutions. It’s a no brainer.”

Want to keep your construction or infrastructure project on track? Contact the Hünnebeck UK team now.

T: +44 (0)1827 289955

E: [email protected]

W: www.huennebeck.com

Steve Workman

Company Closed: as retired

2 年

If you know …..then you know, time to get real ??

回复
Ricardo Alejandro Bueno García

Director Desarrollo e Infraestructura Inmobiliaria / Director Dise?o y Construcción / Administración y Evaluación de Proyectos / Planeación estratégica/ Retail. "Enfocado en lograr resultados innovando."."

2 年

It is important to continually innovate, this brings efficiencies in processes and costs, but solutions like this one also help reduce the carbon footprint by avoiding the use of wood.

Fernando Figueroa Tapia

Director Projects and Operational Excellence |Senior Executive |Senior Project Management | Operational Excellence | Org. Transformation | Continuous Improvement |Multicultural Leadership Mgmt |TPM| PMP | CSSBB

2 年

Fully agree Wayne… we always have to think “out of the box” …

要查看或添加评论,请登录

Hünnebeck by BrandSafway的更多文章

社区洞察

其他会员也浏览了