We have all heard the phrase, ‘it’s a need-to-know basis’, generally followed by ‘and you don’t need to know’.

It’s a phrase that relates to the topic of condition based monitoring (CBM) in the upstream oil & gas industry, specific to drilling rigs. So, what is CBM? And how does it affect the way an operator will intake a drilling rig? What do you need to know?

What is CBM?

CBM is not a new concept, it is used in many other industries such as aeronautics and petrochemicals. Using CBM for drilling rigs is a relatively new concept and a number of drilling rig owners have implemented condition monitoring (CM) and CBM strategies to reduce costs by maintaining equipment based on measured physical condition, rather than fixed calendar-based maintenance schedules where appropriate.

Planned maintenance activities are typically assigned on a time frequency basis; however, they do not take equipment usage into consideration, and this can cause maintenance scheduling problems on rigs which have been non-operational for significant periods of time.

One of the reasons rig owners have implemented CBM is because maintenance tasks are based on measurement data, rather than fixed time schedules. CBM maximises the interval between scheduled maintenance according to the equipment’s condition and can provide an early warning of deterioration before failure, therefore avoiding unplanned downtime.

What is condition monitoring?

Condition monitoring is a maintenance activity which is used to detect potential equipment failure so that corrective action can be taken to prevent this occurring. Condition monitoring is generally used in situations where there is a reasonable probability of detecting a defect before failure of equipment occurs. Monitoring techniques typically include:

  • Equipment diagnostics
  • Vibration analysis
  • Oil analysis
  • Corrosion monitoring
  • Non-destructive testing
  • Electrical testing
  • Infrared thermography
  • Ultrasonic leak detection
  • Remote monitoring

Who supports CBM?

Condition monitoring and condition-based maintenance are recognised by ABS and DNV-GL and supported by major equipment manufacturers including National Oilwell Varco (NOV) and HMH.

NOV provides customers with its Rigsentry condition monitoring service which can be deployed on drilling and well control equipment, while HMH offers its DrillCon service to allow clients to develop a continuous class strategy. Service providers including RigQuip, IKM, and AMPS also provide a range of CBM services.

Can CBM be applied to all equipment?

It is not practical for CM/CBM to be used in all instances; therefore, the maintenance system should be designed to identify and monitor the most critical equipment with the highest frequency or probability of failure.

As a result, some rig owners have implemented maintenance strategies which are a combination of planned maintenance activities and condition-based maintenance activities. Condition monitoring is increasing being adopted on drilling and pipe handling equipment to prevent failure of safety and operationally critical equipment which has no redundancy.

Case Study 1: Fast line Sheave Bearing

No alt text provided for this image

During a rig reactivation project, ModuSpec identified a maintenance deficiency on a jack-up rig which had implemented CBM strategy for the drilling hoisting equipment. The identified issue could have led to significant downtime had it not been properly addressed prior to the rig commencing operations for the operator.

The crown was installed in 2016 and a category IV (5-yearly) inspection was due in 2021; however, the rig owner had recently implemented CBM on the drilling hoisting equipment. The Original Equipment Manufacturer (OEM) was subsequently instructed to conduct a condition assessment in 2020. Based on the results, the rig owner had determined that the crown was fit for continued service and rotated the assembly by 180 degrees in 2021 to minimise uneven sheave wear. In addition to rotating the crown cluster, the position of the dual deadline and fast line sheaves was also swapped.

This strategy meant that the deadline sheaves were now going to be used as the fast line sheave, and the deadline sheave bearings which had been in a static position for the previous five years were going to be subjected to high-speed rotational loads.

Vibration analysis had been carried out by the OEM on some of the sheave bearings; however, ModuSpec identified that an early-stage fault had been discovered on several of the bearings. The OEM recommended repeating the vibration measurements monthly to verify the original results, but this had not been carried out by the rig owner.

ModuSpec also identified that vibration analysis had not been carried out on deadline sheave bearings (after they had been placed in the fast line sheave position), and the OEM had not obtained any sheave wear measurements as part of the condition assessment.

Several further sets of measurements were obtained during the survey, unfortunately, these confirmed that the fast line sheave bearings were defective and needed to be replaced. This resulted in the fast line sheave being replaced only a few days before the rig was due to depart the shipyard.

On this occasion, the CBM strategy had not fulfilled its objective.

Case study 2: Misalignment between the MMS and CBM strategy

During another rig intake project, the operator wanted ModuSpec to assess how well the rig owner was managing its CBM strategy. During this assessment, ModuSpec identified several weaknesses which needed to be addressed:

  • The MMS was not aligned with the CBM strategy which meant that some equipment such as the travelling block was not being monitored.
  • Some of the CM data was unreliable due to a variety of issues including sensor faults which were not being addressed.
  • When the CM data indicated that further actions needed to be taken, there was a delay in the rig owner performing the necessary work.
  • Several of the annual NDT work orders had been closed; however not all the inspection activities had been carried out.

So, what do you need to know?

When we talk with our clients from the operator community, we tend to see that CBM is not a subject that they know much about. Which is no surprise really as CBM is still a relatively new concept and we don’t expect our clients with a drilling engineering background to know in detail what CBM is.

Here are a few pointers if you are currently operating or in the future are to likely operate with a rig utilising CBM:

  • Establish what equipment is being monitored – generally safety and operational critical equipment – it’s good to know as it will differ per rig.
  • Find out if any if any downtime is related to equipment under CBM – this could be a sign that the CM is not effective.
  • Ask the rig owner to provide you with information on what maintenance may be required on equipment under CBM when the rig is under contract to you, and how they plan to manage continuity of operations.
  • Ask the rig owner to confirm its strategy for inspecting the drilling load path equipment. Some rig owners have moved away from routinely conducting NDT techniques such as Magnetic Particle Inspection (MPI), because they have opted to conduct annual visual inspection and only carry out MPI on occasions where surface cracks are identified.
  • Find out which processes are in place for the analysis of measurement data and where the data is being stored on the maintenance management system.
  • Establish if the rig owner has sufficient levels of spare parts on the rig or onshore to support any failure of equipment under CBM.

Conclusion

The purpose of this article is to explain at a high level what CBM is and what to consider if your rig is using CBM.

It’s clear that CM and CBM has been developed to ensure that maintenance activities and repairs are planned and executed before they turn into major failures. This is dependent on all necessary measurement data being obtained by the rig maintenance crew and analysed, and that all analysis recommendations are logged in the maintenance system and addressed.

With the upturn of the industry in 2021 and positive market outlook, we see that many more rigs currently using CBM will be operating for longer periods – rig owners may look to implementing CBM as a way of improving maintenance efficiency and the bottom line.

The case study examples provided highlight the importance of asking the right questions during a rig intake.

The ModuSpec team is well versed in CBM and has, on many occasions, advised clients during a rig intake project on the effectiveness of CBM and its risks.

It’s our role to provide assurance that the equipment has been properly maintained and is in serviceable condition – in most cases this means a review of the rig owner’s maintenance strategy to verify that maintenance activities have been executed correctly.

We often find that while the CBM is effective, we identify and highlight gaps and risks where additional corrective maintenance activities may need to be completed before the rig commences operations.

So, ask the question ‘is it a need-to-know basis?’

Sean Work

Auditor, Supervisor, Manager & Mechanical Contractor

2 年

A very good insight here by Mark. Of course there has also been changes in the equipment inspection schedules recommended through API for example, which, on certain equipment has now determined that inspections and overhauls should be done on an ‘Operational Days’ basis providing CAT III inspections are also done, again on Operational Days. This means much if the ‘load path’ equipment don’t need that CAT IV commonly referred to as a 5 yearly in the industry, as often as once got done. It’ll be interesting to see how OEM recommendations, API recommendations and CBM all come together to ensure safety and financial improvements for the equipment and the operators.

Ben Polski-Delve ''Heimdall'

Heimdall Protect, Asset and Maintenance Compliance and Integrity Management (SaaS)

2 年

Great summary with some interesting points, important to understand the split in maintenace and integrity activities, CBM is great for maintenance and can be used to reduce oil usage and monitor bearings etc that may be failing, usually based on a running hrs schedule (which many contrcators fail to follow due to poor systems that can only track days) For drilling equipment under API, contractors are allowed to track usage (and we used to) but the practice has fallen behind with less experienced crew and operator demands, many CATIVs i have been involved with have found cracks in critical components which would not show if not taken out of service and stripped down after 5 years continuous use.. What contractors do require is oems to support in use and storage strategies and monitoring to reduce the frequency and un required CATIVs, but hard finding one to support as it always ends up in reducing their income..

Craig Fraser

Chairman / Director - RigQuip

2 年

Good overview Mark. It would be interesting to know how much rigs are properly implementing CBM and how much of those rigs are actually paying enough for it to enable the suppliers to make a living from it. I am gathering a handful if any. I hear so much these days about end user Operators being fussy about CAT 4 inspections, so I am curious about how much acceptance there is overall for non intrusive methods. CBM will catch a bearing failure but it will not catch a shaft wearing or failing catastrophically.

Tyler Helm BEng(Hons)

Maintenance Supervisor--Excellence--Reliability--Continuous Improvement

2 年

CBM can be a disaster if there is no education, good processes and consistency. It can pay dividends when managed correctly but does the drilling industry on whole have a mature enough Reliabilty strategy with the right support? I’m still a firm believer of basics and strong foundations. But the more the industry moves along in terms of regulatory requirements even basics can be challenging to manage. Good article. Thanks for sharing.

要查看或添加评论,请登录

Mark Watson的更多文章

  • ModuSpec awarded spate of contract wins in Europe & Africa region

    ModuSpec awarded spate of contract wins in Europe & Africa region

    ModuSpec has secured several contracts to support existing and new clients in the Europe and Africa region. Totaling a…

  • Multiple wins for ModuSpec in UKCS

    Multiple wins for ModuSpec in UKCS

    ModuSpec is delighted to have secured multiple recent project wins in the United Kingdom Continental Shelf (UKCS) for…

    4 条评论
  • Drilling into competency

    Drilling into competency

    Around this point last year, with the oil price crash and global pandemic in full swing, ModuSpec experienced the start…

    1 条评论
  • ModuSpec continues to have success in The Netherlands with Neptune

    ModuSpec continues to have success in The Netherlands with Neptune

    ModuSpec is delighted to announce the award of two further projects in The Netherlands. ModuSpec (a Vysus Group…

  • ModuSpec chosen to support intake of rig from Norway to UK

    ModuSpec chosen to support intake of rig from Norway to UK

    ModuSpec chosen to support intake of rig from Norway to UK ModuSpec is delighted to announce the award of a significant…

    8 条评论
  • Reactivating a platform drilling package? Some key lessons to learn

    Reactivating a platform drilling package? Some key lessons to learn

    As an organization which supports reactivation of production platform drilling packages, it is not uncommon for us to…

    6 条评论
  • Do you know your OEM from your CEM?

    Do you know your OEM from your CEM?

    Historically within the oil & gas industry the repair, servicing or remanufacturing of equipment has been managed by…

    7 条评论
  • ModuSpec continues to expand in Mexico

    ModuSpec continues to expand in Mexico

    ModuSpec is delighted to announce the award of a project with an international oil company to support the selection of…

    3 条评论
  • Significant win in Egypt for ModuSpec

    Significant win in Egypt for ModuSpec

    ModuSpec are delighted to announce the award of a six-figure contract for provision of Rig Intake & Inspection Services…

    3 条评论
  • You get what you pay for

    You get what you pay for

    In my last article, ‘You are ModuSpec……right?’, I wrote that our clients know us and trust us to deliver a customised…

    3 条评论