Component Repair Centers (CRCs)?? Industry Collaboration Event (CE)?
Graham Plaster
Director, Nautilus | Growing the National Security Technology Ecosystem | Bestselling Author
NEW DATES: 10-11 January 2024?
Request to Attend NLT 01 December 11:59 PM ET?
?
Purpose?
FLEETWERX and Nautilus, in collaboration with the Naval Postgraduate School (NPS), NavalX and NAVSEA, will host a series of events to identify organizations with technologies and techniques to design, build/stand-up, operate, and maintain two (2) Component Repair Centers (CRCs) along with a new forge/foundry to provide the Navy with state-of-the-art operations, machinery, robotics, and integrated IT systems with the existing Navy and Naval Shipyard IT systems.??
Requirements
Included in the CRCs will be existing rotatable pool components from the four stipulated rotatable pools listed in the Background section. This includes, leveraging data that is used in the iForecast system along with the Advanced Industrial Management (AIM), Maritime Services Enterprise (MSE), and the Navy Maintenance Data (NMD) databases and creating new data models, testing data models, generating analyses/model outputs and publishing associated results. This may include, creating secure and portable data models for government integration into the iForecast or other SUBMEPP/NAVSEA applications, testing data models (such as for model performance, stability, and sensitivity), adhering to SUBMEPP/NAVSEA coding and data modelling standards, creating models in congruence with previous iForecast data models, publishing outputs from data models/analyses as required by SUBMEPP/NAVSEA, and leveraging comprehensive data science tools. The contractor must have experience in Navy material forecasting and have experience working with Navy material data with the ability to learn and integrate into the MSE and AIM data environments. The overall layout of the CRCs shall take into consideration Kaizen principles utilizing lean Six Sigma Standards for the latest in Computer Numerical Controlled equipment and maintenance cycles along with a mainframe tied directly into the navy forecasting and workload IT systems.??
?
Background??
Complex depot-level maintenance is conducted at all four Public Naval Shipyards (NSYs): Norfolk Naval, Portsmouth Naval, Puget Sound Naval & Intermediate Maintenance Facility, and Pearl Harbor Naval & Intermediate Maintenance Facility. They respectively employ a skilled workforce of over 37,089 individuals, performing maintenance and modernization work for Chief of Naval Operation (CNO) availabilities. Some reoccurring issues faced at the NSYs for overhauling components are hard to get parts/pieces, length of time to overhaul, complexity of overhaul, lack of vendor support, and premature failure of an item. Component rotatable pools were stood up to correct the schedule delays. Submarine Advanced Equipment Repair Program (AERP, PMS392), Trident Planned Equipment Repair program (TRI PER, PMS392), Carrier Planned Equipment Repair program (CARPER, PMS312), Corporate Component Repair Program (CCRP, PMS392), and Nimitz Aircraft Carrier Class (CVN68CL, PMS312) and Los Angeles Fast Attack Submarine Class (SSN688CL, PMS392) shafts. The concept for rotatable pools is to have refurbished material Ready For Issue (RFI) in "A" condition when needed to meet the demand signal. Similarly, Other Productive Work (OPW) lines were established at NSYs for refurbishment of all other components needed during ship maintenance availability or to meet off-yard fleet demand. Because of ongoing NSYs resource constraints and schedule impacts caused by prioritization of workloads being shifted, the rotatable pools are challenged to meet schedule, quantity, and quality demands for planned CNO availabilities.??
Objectives
NAVSEA seeks a Contractor to develop a plan to stand up one or more Component Repair Centers (CRCs) that will house all component refurbishment work. Also, to develop a plan to stand-up one forge/foundry to fabricate new components from the largest shafts to the smallest component. Key objectives for the Contractor are as follows:??
领英推荐
Implementation is expected to include:???
Tentative Agenda
10 January 2024 (Virtual and In-Person)?(All times listed are in ET)?
0830-0900: Attendees Dial-In / Check-In? 0900-0915: Nautilus?Welcome Remarks? 0915-0930: Stakeholder Remarks? 0930-1130: Problem Statement Round Robin? 1130-1300: Lunch (On Your Own)? 1300-1400:?Large Group Q&A? 1400-1430: Networking? 1430-1445: Technologies, Techniques, and POCs Submissions? 1445-1500: Wrap-Up and Follow-On Event Schedules/Q&A ?
11 January 2024 (In-Person Only)? 0900-0915: Nautilus Welcome? 0915-0945: Introductions/Icebreaker? 0945-1000: Stakeholder Welcome Remarks & Problem Set Recap? 1000-1050: Limiting Factors Breakout Sessions (x2)? 1050-1100: Break & Collate? 1100-1200: Overcoming Limiting Factors Breakout Session? 1200-1315: Lunch (On Your Own)? 1315-1515: Blue Sky Development? 1515-1600: Blue Sky Briefs? 1600-1610: Voting & Break? 1610-1630: Wrap-Up and Follow-On Schedule?
?Note: This agenda is subject to change
How You Can Participate??
QUESTIONS:
If you have any questions, please contact Nautilus: [email protected]
DISCLAIMERS: ??
An award under 10 U. S. Code, Section 2371b may result in award of a follow-on production in accordance with 10.U.S.C. 2371(f).? Upon a determination that the competitively awarded prototype project(s) have been successfully completed, and subject to the availability of funds, the prototype project(s) may result in the award of a follow-on production contract or transaction without the use of competitive procedures.? Such awards may include multiple phases.???
Non‐Government advisors may be used in the evaluation of submissions and will have signed Non‐Disclosure Agreements (NDAs) with the Government.? The Government understands the information provided in this announcement is presented in confidence and may contain trade secret or commercial or financial information and agrees to protect such information from unauthorized disclosure to the maximum extent permitted and as required by law.? An Organization’s participation in any part of the selection process under this announcement indicates concurrence with the aforementioned use of contractor support personnel.?
Program Manager at Naval Postgraduate School’s Consortium for Advanced Manufacturing Research and Education (CAMRE) & Consortium for Artificial Intelligence in Military Applications and National Security (CAIMANS)
1 年Exciting times and exciting collaborations opportunities between CAMRE / FLEETWERX / Naval Postgraduate School & NavalX / NAUTILUS / Naval Sea Systems Command (NAVSEA)
Juxtaposing with a purpose. Cynical optimist. Innovation kinesiologist. Focused on making the aspirational operational at the intersection of energy, mobility, development, and international relations. DOTMLPFer
1 年Kaitlynn Castelle David Nielsen, P.E.
Financial/Defense-Tech Professional
1 年John Wasko