Compliance Studies on Grid Code for Renewable Energy Projects by CEA (India)
Introduction
When assessing compliance with CEA Technical Standards for Grid Connectivity by renewable energy (RE) generators, it's crucial to evaluate at the Point of Interconnection (POI), which denotes the specific connection point of the RE generating station to the grid. In this assessment, the generator pooling station, dedicated transmission line, and RE system should all be considered integral components. To ensure adherence to grid codes and standards per CEA guidelines, the following assessment tests are imperative. These tests involve the utilization of PSSE, PSCAD software.
?Modeling and System Studies using PSCAD-PSSE as per CEA Regulations on Technical Standards for Grid Connectivity, 2022
This involves the development and validation of PSSE & PSCAD models in alignment with CEA regulations on Grid Connectivity Standards, as detailed in the Final Report of the Working Group (July 2022).
Steady-State Studies
Reactive Power Capability: Assessing reactive power capability at various POI voltage levels and additional reactive compensation sizing, if necessary. Q-V curve plotting utilizing detailed model results.
Short-Circuit Analysis
Determining NCSFC fault current contribution for 3-phase and 1-phase faults at POI using PSSE equivalent model.?
Dynamic-State Studies
Validating dynamic models using equivalent PSCAD and PSSE models and comparing responses.
领英推荐
Voltage Ride Through Test
Demonstrating ride-through capability for balanced and unbalanced faults (LVRT & HVRT).
Frequency Response and Operational Capability Test
Assessing frequency response and operational capability within specified frequency ranges.
?Active Power Control Set Point
Analyzing the capability to control active power injection according to a set point.
Ramping Capability Test
Analyzing the rate of change of power output.
Power Quality Studies
Conducting harmonic analysis, DC injection analysis, and voltage flicker assessment at POI.
Conclusion
Compliance with CEA guidelines for Grid Code is essential for ensuring the seamless integration of renewable energy projects into the grid. Thorough studies and tests, utilizing advanced simulation software, are necessary to meet these standards effectively.
QG Director, SMIEEE, Renewable Energy, HVDC / FACTS, Synchronous condenser, Grid Connection, Power system study.Complex Oil & Gas,Steel Industry ,Cross Country Connection,Grid Code Compliance,IEEE Working Group,
11 个月whats your contact no
QG Director, SMIEEE, Renewable Energy, HVDC / FACTS, Synchronous condenser, Grid Connection, Power system study.Complex Oil & Gas,Steel Industry ,Cross Country Connection,Grid Code Compliance,IEEE Working Group,
11 个月Samy on the spot lets get connected working on Grid Compliance 9901878706