Compass International is the leading publisher of Global Construction Cost Data.  

For more than 20 years, 1,000’s of International Engineering, Architectural, EPC, Corporate Engineering & Construction Management organizations have successfully used our cost data to estimate & benchmarks Process (Oil – Gas – Chemical), Energy, Infrastructure, Offshore, Pipelines, Mining, Pharmaceutical, Manufacturing & General Construction - Commercial Facilities (Airports, Hotels, Offices & Logistic Centers).

Our data research team constantly tracks US & International construction costs (materials & labor), productivity, construction in-directs, inflation and latest trends.

Our mission is to provide the US / International Construction Industry with the latest materials, labor costs, productivity performance benchmarks, construction field in-directs & engineering / design cost data:

 Our services include:

(8) US / Global Construction Cost Databases (that includes USA & 125 Countries):

Estimate Reviews / Validation - 3rd Party / Independent Estimates (we have reviewed 100's of multi-million / billion dollar Pre-FEED, FEED, Conceptual & Detailed cost estimates, many times saving our clients significant project / CAPEX costs. (Projects include Refineries, Chemical Plants, Pharma / Bio / Food Production Facilities, Power Plants, Steel Mills, Mines, FPSO's, Pipelines, Hi-Rise Offices, Hotel - Resorts, Airports & Major Highways etc.,)

Specific Country Construction Cost Reports / Benchmarking Reports / Market Condition Reports & VIP – VE Cost Saving Studies.

Training Seminars / Webinars for Front End / Conceptual & Detailed Estimating.

Construction related Claims - Change Orders (Review / Assessment - Audits - Production).

 Our Publications & Databases include :

1.    Global Construction Cost Yearbook (covering 101 Countries focused on General Construction / Infrastructure & Industrial Construction).

2.    Front End / Conceptual Yearbook (Focused on Oil / Gas & Process / Industrial / Chemical & Power Construction).

3.    Hi-Tech / Pharmaceutical Yearbook (Covering Pharmaceuticals / Bio / Micro-Electronics – Computer Chips / Medical Devices / Consumer Goods Products / R&D Facilities, Food Production & Clean Room Cost Data).

4.    International Construction Benchmark Yearbook (All Construction Categories).

5.    Pipelines, Mining & Offshore Cost Data Yearbook (Also includes Wind Facilities / Module / Pre-Assembly benchmarks)

6.    Global Industrial / Commercial Repair & Maintenance Construction Yearbook (All construction categories – 10,000 + detailed construction cost (Labor, Material  & Construction Equipment) line items, that can be calibrated & utilized in 125 countries).

7.    Worldwide Industrial / Commercial Construction Schedule of Rates Yearbook (All construction categories – 10,000 + detailed construction cost (Labor, Material & Construction Equipment) line items, that can be calibrated & utilized in 125 countries).

8.    International Procurement Yearbook (Construction Purchasing - Purchasing - Procurement / Materials Management Data for 125 countries).

Our Construction Cost Databases provide:

  • Current construction materials, labor costs, field in-directs / preliminaries.
  • Process equipment, process piping, electrical, instrumentation & insulation / painting costs.
  • Skilled & Unskilled Construction Labor Rates & Installation values.
  • Architects, Engineers – Construction Management billing rates & fees.
  • Square Foot / M2 Building costs (for 100 + Commercial / Industrial facility types)
  • Infrastructure Benchmarks (roads, bridges, tunnels & airports).
  • Offshore Construction – FPSO’s SPAR’s, Offshore Structures & Pipeline costs. 
  • Country labor historical productivity / performance metrics.
  • Detailed field in-direct / preliminaries / general conditions data.
  • (2) Location factors (1) complex - imported (high value) & less complex (indigenous) facilities.
  • 100’s of Final Cost Close-Out / Benchmark Reports.

+++ Please share this information with your co-workers & colleagues if appropriate – Thank you. +++

For more information contact John G. McConville CCP - Operations Director - Compass International - USA Telephone +1 (609) 577 4505

https://www.compassinternational.net/

https://compassinternational.net/books/


要查看或添加评论,请登录

John G. McConville CCP的更多文章

社区洞察