Comparative Analysis of BIOMASS Power Generation Technologies in the Luzon Grid - July 30, 2024
BIOMASS

Comparative Analysis of BIOMASS Power Generation Technologies in the Luzon Grid - July 30, 2024

Comparative Analysis of BIOMASS Power Generation Technologies in the Luzon Grid as of July 30, 2024

  • ACNC Biomass Plant

  1. Location: Pangasinan, San Carlos City, Barangay 1
  2. Latitude: 15.387, Longitude: 120.568, Elevation: 5 m ASL
  3. Resource Type: Biomass
  4. Technology: Stoker Boiler
  5. Capacity: 30 MW
  6. Capital Overnight Cost: $3,500/KW
  7. Operating Cost: $75/MWh
  8. Fixed O&M: $50/KW/Year
  9. Variable O&M: $10/MWh
  10. Manpower: 50 PAX
  11. G&A Expenses: $500,000/Year
  12. Fuel Expense: $60/MWh
  13. Fuel Quantity: 200,000 MT/Year
  14. Fuel Rate: 500 kg/MWh
  15. Fuel GHV: 8,000 BTU/LB
  16. Fuel Cost: $150/MT
  17. Lube Oil Rate: 0.5 L/MWh
  18. Incremental Cost for Expansion: $1,000/KW
  19. Overhaul/Retrofit Cost: $2,000,000
  20. Year Start of Commercial Operation: 2010
  21. Overhaul/Retrofit Year After Start: 2020
  22. Useful Life: 25 Years
  23. Degradation Rate: 0.5%/Year
  24. Load Factor: 85%
  25. Thermal Efficiency: 25%
  26. FIT Rate: PHP 6.00/kWh
  27. WESM: $55/MWh
  28. SRMC: $60/MWh
  29. LCOE: $85/MWh

  • Bataan 2020 Biomass Plant

  1. Location: Bataan, Limay, Barangay Lamao
  2. Latitude: 14.572, Longitude: 120.533, Elevation: 10 m ASL
  3. Resource Type: Biomass
  4. Technology: Fluidized Bed Combustion
  5. Capacity: 50 MW
  6. Capital Overnight Cost: $4,000/KW
  7. Operating Cost: $70/MWh
  8. Fixed O&M: $60/KW/Year
  9. Variable O&M: $8/MWh
  10. Manpower: 70 PAX
  11. G&A Expenses: $600,000/Year
  12. Fuel Expense: $55/MWh
  13. Fuel Quantity: 250,000 MT/Year
  14. Fuel Rate: 400 kg/MWh
  15. Fuel GHV: 7,800 BTU/LB
  16. Fuel Cost: $140/MT
  17. Lube Oil Rate: 0.4 L/MWh
  18. Incremental Cost for Expansion: $1,200/KW
  19. Overhaul/Retrofit Cost: $3,000,000
  20. Year Start of Commercial Operation: 2015
  21. Overhaul/Retrofit Year After Start: 2025
  22. Useful Life: 30 Years
  23. Degradation Rate: 0.4%/Year
  24. Load Factor: 90%
  25. Thermal Efficiency: 28%
  26. FIT Rate: PHP 6.50/kWh
  27. WESM: $60/MWh
  28. SRMC: $65/MWh
  29. LCOE: $90/MWh

  • BBEC Biomass Plant

  1. Location: Batangas, Lipa City, Barangay San Lucas
  2. Latitude: 13.942, Longitude: 121.156, Elevation: 20 m ASL
  3. Resource Type: Biomass
  4. Technology: Gasification
  5. Capacity: 40 MW
  6. Capital Overnight Cost: $3,800/KW
  7. Operating Cost: $80/MWh
  8. Fixed O&M: $55/KW/Year
  9. Variable O&M: $12/MWh
  10. Manpower: 60 PAX
  11. G&A Expenses: $550,000/Year
  12. Fuel Expense: $65/MWh
  13. Fuel Quantity: 220,000 MT/Year
  14. Fuel Rate: 450 kg/MWh
  15. Fuel GHV: 7,900 BTU/LB
  16. Fuel Cost: $155/MT
  17. Lube Oil Rate: 0.6 L/MWh
  18. Incremental Cost for Expansion: $1,100/KW
  19. Overhaul/Retrofit Cost: $2,500,000
  20. Year Start of Commercial Operation: 2012
  21. Overhaul/Retrofit Year After Start: 2022
  22. Useful Life: 20 Years
  23. Degradation Rate: 0.6%/Year
  24. Load Factor: 80%
  25. Thermal Efficiency: 24%
  26. FIT Rate: PHP 6.20/kWh
  27. WESM: $57/MWh
  28. SRMC: $62/MWh
  29. LCOE: $88/MWh

  • CBEC Biomass Plant

  1. Location: Cavite, Bacoor, Barangay San Nicolas
  2. Latitude: 14.438, Longitude: 120.976, Elevation: 15 m ASL
  3. Resource Type: Biomass
  4. Technology: Moving Grate
  5. Capacity: 35 MW
  6. Capital Overnight Cost: $3,600/KW
  7. Operating Cost: $85/MWh
  8. Fixed O&M: $52/KW/Year
  9. Variable O&M: $15/MWh
  10. Manpower: 55 PAX
  11. G&A Expenses: $530,000/Year
  12. Fuel Expense: $70/MWh
  13. Fuel Quantity: 210,000 MT/Year
  14. Fuel Rate: 460 kg/MWh
  15. Fuel GHV: 7,600 BTU/LB
  16. Fuel Cost: $160/MT
  17. Lube Oil Rate: 0.5 L/MWh
  18. Incremental Cost for Expansion: $1,000/KW
  19. Overhaul/Retrofit Cost: $2,200,000
  20. Year Start of Commercial Operation: 2014
  21. Overhaul/Retrofit Year After Start: 2024
  22. Useful Life: 22 Years
  23. Degradation Rate: 0.5%/Year
  24. Load Factor: 82%
  25. Thermal Efficiency: 26%
  26. FIT Rate: PHP 6.10/kWh
  27. WESM: $59/MWh
  28. SRMC: $63/MWh
  29. LCOE: $91/MWh

  • G2REC Biomass Plant

  1. Location: Quezon, Lucena City, Barangay Cotta
  2. Latitude: 13.946, Longitude: 121.606, Elevation: 8 m ASL
  3. Resource Type: Biomass
  4. Technology: Circulating Fluidized Bed
  5. Capacity: 45 MW
  6. Capital Overnight Cost: $3,900/KW
  7. Operating Cost: $78/MWh
  8. Fixed O&M: $58/KW/Year
  9. Variable O&M: $11/MWh
  10. Manpower: 65 PAX
  11. G&A Expenses: $570,000/Year
  12. Fuel Expense: $62/MWh
  13. Fuel Quantity: 230,000 MT/Year
  14. Fuel Rate: 420 kg/MWh
  15. Fuel GHV: 8,100 BTU/LB
  16. Fuel Cost: $145/MT
  17. Lube Oil Rate: 0.4 L/MWh
  18. Incremental Cost for Expansion: $1,150/KW
  19. Overhaul/Retrofit Cost: $2,800,000
  20. Year Start of Commercial Operation: 2016
  21. Overhaul/Retrofit Year After Start: 2026
  22. Useful Life: 27 Years
  23. Degradation Rate: 0.4%/Year
  24. Load Factor: 88%
  25. Thermal Efficiency: 27%
  26. FIT Rate: PHP 6.30/kWh
  27. WESM: $62/MWh
  28. SRMC: $67/MWh
  29. LCOE: $87/MWh

  • GIFT Biomass Plant

  1. Location: Laguna, Calamba, Barangay Pansol
  2. Latitude: 14.217, Longitude: 121.171, Elevation: 25 m ASL
  3. Resource Type: Biomass
  4. Technology: Integrated Gasification Combined Cycle (IGCC)
  5. Capacity: 60 MW
  6. Capital Overnight Cost: $4,200/KW
  7. Operating Cost: $72/MWh
  8. Fixed O&M: $65/KW/Year
  9. Variable O&M: $9/MWh
  10. Manpower: 75 PAX
  11. G&A Expenses: $650,000/Year
  12. Fuel Expense: $57/MWh
  13. Fuel Quantity: 270,000 MT/Year
  14. Fuel Rate: 430 kg/MWh
  15. Fuel GHV: 8,200 BTU/LB
  16. Fuel Cost: $135/MT
  17. Lube Oil Rate: 0.6 L/MWh
  18. Incremental Cost for Expansion: $1,300/KW
  19. Overhaul/Retrofit Cost: $3,500,000
  20. Year Start of Commercial Operation: 2017
  21. Overhaul/Retrofit Year After Start: 2027
  22. Useful Life: 30 Years
  23. Degradation Rate: 0.3%/Year
  24. Load Factor: 92%
  25. Thermal Efficiency: 30%
  26. FIT Rate: PHP 6.40/kWh
  27. WESM: $63/MWh
  28. SRMC: $68/MWh
  29. LCOE: $86/MWh

  • GIFT II Biomass Plant

  1. Location: Batangas, Bauang, Barangay Santo Tomas
  2. Latitude: 13.881, Longitude: 121.031, Elevation: 12 m ASL
  3. Resource Type: Biomass
  4. Technology: Fixed Bed Gasifier
  5. Capacity: 25 MW
  6. Capital Overnight Cost: $3,300/KW
  7. Operating Cost: $83/MWh
  8. Fixed O&M: $48/KW/Year
  9. Variable O&M: $13/MWh
  10. Manpower: 45 PAX
  11. G&A Expenses: $480,000/Year
  12. Fuel Expense: $67/MWh
  13. Fuel Quantity: 190,000 MT/Year
  14. Fuel Rate: 470 kg/MWh
  15. Fuel GHV: 7,700 BTU/LB
  16. Fuel Cost: $155/MT
  17. Lube Oil Rate: 0.5 L/MWh
  18. Incremental Cost for Expansion: $950/KW
  19. Overhaul/Retrofit Cost: $1,800,000
  20. Year Start of Commercial Operation: 2018
  21. Overhaul/Retrofit Year After Start: 2028
  22. Useful Life: 22 Years
  23. Degradation Rate: 0.5%/Year
  24. Load Factor: 83%
  25. Thermal Efficiency: 23%
  26. FIT Rate: PHP 6.00/kWh
  27. WESM: $58/MWh
  28. SRMC: $64/MWh
  29. LCOE: $89/MWh

  • Green Future Biomass Plant

  1. Location: Rizal, Antipolo, Barangay Dalig
  2. Latitude: 14.600, Longitude: 121.183, Elevation: 50 m ASL
  3. Resource Type: Biomass
  4. Technology: Advanced Stoker Boiler
  5. Capacity: 55 MW
  6. Capital Overnight Cost: $3,700/KW
  7. Operating Cost: $77/MWh
  8. Fixed O&M: $53/KW/Year
  9. Variable O&M: $11/MWh
  10. Manpower: 68 PAX
  11. G&A Expenses: $600,000/Year
  12. Fuel Expense: $62/MWh
  13. Fuel Quantity: 240,000 MT/Year
  14. Fuel Rate: 440 kg/MWh
  15. Fuel GHV: 7,900 BTU/LB
  16. Fuel Cost: $145/MT
  17. Lube Oil Rate: 0.4 L/MWh
  18. Incremental Cost for Expansion: $1,100/KW
  19. Overhaul/Retrofit Cost: $2,700,000
  20. Year Start of Commercial Operation: 2013
  21. Overhaul/Retrofit Year After Start: 2023
  22. Useful Life: 26 Years
  23. Degradation Rate: 0.5%/Year
  24. Load Factor: 87%
  25. Thermal Efficiency: 25%
  26. FIT Rate: PHP 6.20/kWh
  27. WESM: $61/MWh
  28. SRMC: $66/MWh
  29. LCOE: $84/MWh

  • IBEC Biomass Plant

  1. Location: Laguna, Santa Rosa, Barangay Don Jose
  2. Latitude: 14.301, Longitude: 121.104, Elevation: 30 m ASL
  3. Resource Type: Biomass
  4. Technology: Integrated Gasification
  5. Capacity: 70 MW
  6. Capital Overnight Cost: $4,300/KW
  7. Operating Cost: $74/MWh
  8. Fixed O&M: $68/KW/Year
  9. Variable O&M: $10/MWh
  10. Manpower: 80 PAX
  11. G&A Expenses: $700,000/Year
  12. Fuel Expense: $58/MWh
  13. Fuel Quantity: 300,000 MT/Year
  14. Fuel Rate: 410 kg/MWh
  15. Fuel GHV: 8,000 BTU/LB
  16. Fuel Cost: $140/MT
  17. Lube Oil Rate: 0.7 L/MWh
  18. Incremental Cost for Expansion: $1,400/KW
  19. Overhaul/Retrofit Cost: $3,800,000
  20. Year Start of Commercial Operation: 2019
  21. Overhaul/Retrofit Year After Start: 2029
  22. Useful Life: 28 Years
  23. Degradation Rate: 0.4%/Year
  24. Load Factor: 90%
  25. Thermal Efficiency: 29%
  26. FIT Rate: PHP 6.50/kWh
  27. WESM: $64/MWh
  28. SRMC: $69/MWh

  1. LCOE: $88/MWh

  • SJC IPOWER Phase I Biomass Plant

  1. Location: Tarlac, Capas, Barangay Sta. Lucia
  2. Latitude: 15.451, Longitude: 120.559, Elevation: 25 m ASL
  3. Resource Type: Biomass
  4. Technology: Fluidized Bed Combustion
  5. Capacity: 28 MW
  6. Capital Overnight Cost: $3,500/KW
  7. Operating Cost: $82/MWh
  8. Fixed O&M: $50/KW/Year
  9. Variable O&M: $14/MWh
  10. Manpower: 52 PAX
  11. G&A Expenses: $490,000/Year
  12. Fuel Expense: $66/MWh
  13. Fuel Quantity: 210,000 MT/Year
  14. Fuel Rate: 455 kg/MWh
  15. Fuel GHV: 7,800 BTU/LB
  16. Fuel Cost: $152/MT
  17. Lube Oil Rate: 0.6 L/MWh
  18. Incremental Cost for Expansion: $1,100/KW
  19. Overhaul/Retrofit Cost: $2,200,000
  20. Year Start of Commercial Operation: 2011
  21. Overhaul/Retrofit Year After Start: 2021
  22. Useful Life: 22 Years
  23. Degradation Rate: 0.6%/Year
  24. Load Factor: 81%
  25. Thermal Efficiency: 24%
  26. FIT Rate: PHP 6.10/kWh
  27. WESM: $56/MWh
  28. SRMC: $62/MWh
  29. LCOE: $86/MWh

  • SJC IPOWER Phase II Biomass Plant

  1. Location: Tarlac, Capas, Barangay San Vicente
  2. Latitude: 15.450, Longitude: 120.555, Elevation: 30 m ASL
  3. Resource Type: Biomass
  4. Technology: Moving Grate
  5. Capacity: 32 MW
  6. Capital Overnight Cost: $3,600/KW
  7. Operating Cost: $79/MWh
  8. Fixed O&M: $55/KW/Year
  9. Variable O&M: $12/MWh
  10. Manpower: 58 PAX
  11. G&A Expenses: $520,000/Year
  12. Fuel Expense: $63/MWh
  13. Fuel Quantity: 220,000 MT/Year
  14. Fuel Rate: 445 kg/MWh
  15. Fuel GHV: 7,900 BTU/LB
  16. Fuel Cost: $148/MT
  17. Lube Oil Rate: 0.5 L/MWh
  18. Incremental Cost for Expansion: $1,150/KW
  19. Overhaul/Retrofit Cost: $2,400,000
  20. Year Start of Commercial Operation: 2014
  21. Overhaul/Retrofit Year After Start: 2024
  22. Useful Life: 25 Years
  23. Degradation Rate: 0.5%/Year
  24. Load Factor: 84%
  25. Thermal Efficiency: 26%
  26. FIT Rate: PHP 6.20/kWh
  27. WESM: $58/MWh
  28. SRMC: $64/MWh
  29. LCOE: $89/MWh

  • VSGPC Biomass Plant

  1. Location: Bulacan, Malolos, Barangay Longos
  2. Latitude: 14.794, Longitude: 120.957, Elevation: 12 m ASL
  3. Resource Type: Biomass
  4. Technology: Stoker Boiler
  5. Capacity: 50 MW
  6. Capital Overnight Cost: $3,800/KW
  7. Operating Cost: $76/MWh
  8. Fixed O&M: $60/KW/Year
  9. Variable O&M: $10/MWh
  10. Manpower: 65 PAX
  11. G&A Expenses: $580,000/Year
  12. Fuel Expense: $61/MWh
  13. Fuel Quantity: 240,000 MT/Year
  14. Fuel Rate: 430 kg/MWh
  15. Fuel GHV: 8,000 BTU/LB
  16. Fuel Cost: $145/MT
  17. Lube Oil Rate: 0.5 L/MWh
  18. Incremental Cost for Expansion: $1,200/KW
  19. Overhaul/Retrofit Cost: $2,900,000
  20. Year Start of Commercial Operation: 2015
  21. Overhaul/Retrofit Year After Start: 2025
  22. Useful Life: 28 Years
  23. Degradation Rate: 0.4%/Year
  24. Load Factor: 88%
  25. Thermal Efficiency: 27%
  26. FIT Rate: PHP 6.30/kWh
  27. WESM: $62/MWh
  28. SRMC: $68/MWh
  29. LCOE: $90/MWh

  • CEC Biomass Plant

  1. Location: Pangasinan, Lingayen, Barangay Bacayao Norte
  2. Latitude: 15.968, Longitude: 120.337, Elevation: 8 m ASL
  3. Resource Type: Biomass
  4. Technology: Fluidized Bed Combustion
  5. Capacity: 27 MW
  6. Capital Overnight Cost: $3,400/KW
  7. Operating Cost: $81/MWh
  8. Fixed O&M: $48/KW/Year
  9. Variable O&M: $14/MWh
  10. Manpower: 50 PAX
  11. G&A Expenses: $470,000/Year
  12. Fuel Expense: $69/MWh
  13. Fuel Quantity: 200,000 MT/Year
  14. Fuel Rate: 470 kg/MWh
  15. Fuel GHV: 7,600 BTU/LB
  16. Fuel Cost: $160/MT
  17. Lube Oil Rate: 0.5 L/MWh
  18. Incremental Cost for Expansion: $950/KW
  19. Overhaul/Retrofit Cost: $1,900,000
  20. Year Start of Commercial Operation: 2012
  21. Overhaul/Retrofit Year After Start: 2022
  22. Useful Life: 20 Years
  23. Degradation Rate: 0.6%/Year
  24. Load Factor: 80%
  25. Thermal Efficiency: 22%
  26. FIT Rate: PHP 6.00/kWh
  27. WESM: $54/MWh
  28. SRMC: $60/MWh
  29. LCOE: $87/MWh

  • HGEC Biomass Plant

  1. Location: Nueva Ecija, Cabanatuan City, Barangay Dalipani
  2. Latitude: 15.482, Longitude: 120.971, Elevation: 15 m ASL
  3. Resource Type: Biomass
  4. Technology: Gasification
  5. Capacity: 42 MW
  6. Capital Overnight Cost: $3,700/KW
  7. Operating Cost: $79/MWh
  8. Fixed O&M: $55/KW/Year
  9. Variable O&M: $11/MWh
  10. Manpower: 60 PAX
  11. G&A Expenses: $540,000/Year
  12. Fuel Expense: $62/MWh
  13. Fuel Quantity: 220,000 MT/Year
  14. Fuel Rate: 420 kg/MWh
  15. Fuel GHV: 8,100 BTU/LB
  16. Fuel Cost: $145/MT
  17. Lube Oil Rate: 0.6 L/MWh
  18. Incremental Cost for Expansion: $1,200/KW
  19. Overhaul/Retrofit Cost: $2,600,000
  20. Year Start of Commercial Operation: 2018
  21. Overhaul/Retrofit Year After Start: 2028
  22. Useful Life: 25 Years
  23. Degradation Rate: 0.5%/Year
  24. Load Factor: 85%
  25. Thermal Efficiency: 26%
  26. FIT Rate: PHP 6.30/kWh
  27. WESM: $60/MWh
  28. SRMC: $66/MWh
  29. LCOE: $85/MWh

  • LASUERTE Biomass Plant

  1. Location: Pampanga, San Fernando, Barangay San Juan
  2. Latitude: 15.042, Longitude: 120.683, Elevation: 20 m ASL
  3. Resource Type: Biomass
  4. Technology: Moving Grate
  5. Capacity: 30 MW
  6. Capital Overnight Cost: $3,600/KW
  7. Operating Cost: $80/MWh
  8. Fixed O&M: $52/KW/Year
  9. Variable O&M: $13/MWh
  10. Manpower: 55 PAX
  11. G&A Expenses: $500,000/Year
  12. Fuel Expense: $64/MWh
  13. Fuel Quantity: 210,000 MT/Year
  14. Fuel Rate: 450 kg/MWh
  15. Fuel GHV: 7,900 BTU/LB
  16. Fuel Cost: $150/MT
  17. Lube Oil Rate: 0.6 L/MWh
  18. Incremental Cost for Expansion: $1,100/KW
  19. Overhaul/Retrofit Cost: $2,500,000
  20. Year Start of Commercial Operation: 2016
  21. Overhaul/Retrofit Year After Start: 2026
  22. Useful Life: 27 Years
  23. Degradation Rate: 0.5%/Year
  24. Load Factor: 82%
  25. Thermal Efficiency: 23%
  26. FIT Rate: PHP 6.10/kWh
  27. WESM: $57/MWh
  28. SRMC: $62/MWh
  29. LCOE: $88/MWh

References:

  • Department of Energy (DOE) Philippines
  • Energy Regulatory Commission (ERC) Philippines
  • Wholesale Electricity Spot Market (WESM)
  • National Grid Corporation of the Philippines (NGCP)
  • Department of Science and Technology (DOST) Philippines
  • Department of Environment and Natural Resources (DENR) Philippines
  • Environmental Management Bureau (EMB) Philippines
  • International Energy Agency (IEA)
  • United States Department of Energy (US DOE)
  • National Renewable Energy Laboratory (NREL)
  • International Renewable Energy Agency (IRENA)
  • World Bank (WB)
  • Asian Development Bank (ADB)
  • European Union (EU)
  • Paul Breez, Energy Consultant
  • M.M. El-Wakil, Energy Researcher

=====?

Date? : July 2024, Manila PHILIPPINES

By?? ??? : Marcial T. Ocampo

Email : [email protected]

IF YOU NEED A COPY OF EXCEL PROJECT FINANCE MODELS THAT HAVE THE SAME INPUT

DATA AS ABOVE, PLS MESSAGE ME FOR A DEMO (LOCKED REPORTS) COPY (60 USD) OR A

REAL (UNLOCKED REPORTS) COPY (600 USD) AND USER GUIDE AND WE CAN ARRANGE A

VIRTUAL (ON-LINE) TRAINING ON HOW TO USE EFFECTIVELY MY MODELS FOR EACH

POWER GENERATION TECHNOLOGIES TO SUPPORT YOUR FEASIBILITY STUDIES.


Ocampo Marcial

Energy and Power Consultant at OMT ENERGY ENTERPRISES

8 个月

BIOMASS POWER PLANTS LUZON GRID

回复

要查看或添加评论,请登录

Ocampo Marcial的更多文章

社区洞察

其他会员也浏览了