Comparative Analysis of BIOMASS Power Generation Technologies in the Luzon Grid as of July 30, 2024
- Location: Pangasinan, San Carlos City, Barangay 1
- Latitude: 15.387, Longitude: 120.568, Elevation: 5 m ASL
- Resource Type: Biomass
- Technology: Stoker Boiler
- Capacity: 30 MW
- Capital Overnight Cost: $3,500/KW
- Operating Cost: $75/MWh
- Fixed O&M: $50/KW/Year
- Variable O&M: $10/MWh
- Manpower: 50 PAX
- G&A Expenses: $500,000/Year
- Fuel Expense: $60/MWh
- Fuel Quantity: 200,000 MT/Year
- Fuel Rate: 500 kg/MWh
- Fuel GHV: 8,000 BTU/LB
- Fuel Cost: $150/MT
- Lube Oil Rate: 0.5 L/MWh
- Incremental Cost for Expansion: $1,000/KW
- Overhaul/Retrofit Cost: $2,000,000
- Year Start of Commercial Operation: 2010
- Overhaul/Retrofit Year After Start: 2020
- Useful Life: 25 Years
- Degradation Rate: 0.5%/Year
- Load Factor: 85%
- Thermal Efficiency: 25%
- FIT Rate: PHP 6.00/kWh
- WESM: $55/MWh
- SRMC: $60/MWh
- LCOE: $85/MWh
- Bataan 2020 Biomass Plant
- Location: Bataan, Limay, Barangay Lamao
- Latitude: 14.572, Longitude: 120.533, Elevation: 10 m ASL
- Resource Type: Biomass
- Technology: Fluidized Bed Combustion
- Capacity: 50 MW
- Capital Overnight Cost: $4,000/KW
- Operating Cost: $70/MWh
- Fixed O&M: $60/KW/Year
- Variable O&M: $8/MWh
- Manpower: 70 PAX
- G&A Expenses: $600,000/Year
- Fuel Expense: $55/MWh
- Fuel Quantity: 250,000 MT/Year
- Fuel Rate: 400 kg/MWh
- Fuel GHV: 7,800 BTU/LB
- Fuel Cost: $140/MT
- Lube Oil Rate: 0.4 L/MWh
- Incremental Cost for Expansion: $1,200/KW
- Overhaul/Retrofit Cost: $3,000,000
- Year Start of Commercial Operation: 2015
- Overhaul/Retrofit Year After Start: 2025
- Useful Life: 30 Years
- Degradation Rate: 0.4%/Year
- Load Factor: 90%
- Thermal Efficiency: 28%
- FIT Rate: PHP 6.50/kWh
- WESM: $60/MWh
- SRMC: $65/MWh
- LCOE: $90/MWh
- Location: Batangas, Lipa City, Barangay San Lucas
- Latitude: 13.942, Longitude: 121.156, Elevation: 20 m ASL
- Resource Type: Biomass
- Technology: Gasification
- Capacity: 40 MW
- Capital Overnight Cost: $3,800/KW
- Operating Cost: $80/MWh
- Fixed O&M: $55/KW/Year
- Variable O&M: $12/MWh
- Manpower: 60 PAX
- G&A Expenses: $550,000/Year
- Fuel Expense: $65/MWh
- Fuel Quantity: 220,000 MT/Year
- Fuel Rate: 450 kg/MWh
- Fuel GHV: 7,900 BTU/LB
- Fuel Cost: $155/MT
- Lube Oil Rate: 0.6 L/MWh
- Incremental Cost for Expansion: $1,100/KW
- Overhaul/Retrofit Cost: $2,500,000
- Year Start of Commercial Operation: 2012
- Overhaul/Retrofit Year After Start: 2022
- Useful Life: 20 Years
- Degradation Rate: 0.6%/Year
- Load Factor: 80%
- Thermal Efficiency: 24%
- FIT Rate: PHP 6.20/kWh
- WESM: $57/MWh
- SRMC: $62/MWh
- LCOE: $88/MWh
- Location: Cavite, Bacoor, Barangay San Nicolas
- Latitude: 14.438, Longitude: 120.976, Elevation: 15 m ASL
- Resource Type: Biomass
- Technology: Moving Grate
- Capacity: 35 MW
- Capital Overnight Cost: $3,600/KW
- Operating Cost: $85/MWh
- Fixed O&M: $52/KW/Year
- Variable O&M: $15/MWh
- Manpower: 55 PAX
- G&A Expenses: $530,000/Year
- Fuel Expense: $70/MWh
- Fuel Quantity: 210,000 MT/Year
- Fuel Rate: 460 kg/MWh
- Fuel GHV: 7,600 BTU/LB
- Fuel Cost: $160/MT
- Lube Oil Rate: 0.5 L/MWh
- Incremental Cost for Expansion: $1,000/KW
- Overhaul/Retrofit Cost: $2,200,000
- Year Start of Commercial Operation: 2014
- Overhaul/Retrofit Year After Start: 2024
- Useful Life: 22 Years
- Degradation Rate: 0.5%/Year
- Load Factor: 82%
- Thermal Efficiency: 26%
- FIT Rate: PHP 6.10/kWh
- WESM: $59/MWh
- SRMC: $63/MWh
- LCOE: $91/MWh
- Location: Quezon, Lucena City, Barangay Cotta
- Latitude: 13.946, Longitude: 121.606, Elevation: 8 m ASL
- Resource Type: Biomass
- Technology: Circulating Fluidized Bed
- Capacity: 45 MW
- Capital Overnight Cost: $3,900/KW
- Operating Cost: $78/MWh
- Fixed O&M: $58/KW/Year
- Variable O&M: $11/MWh
- Manpower: 65 PAX
- G&A Expenses: $570,000/Year
- Fuel Expense: $62/MWh
- Fuel Quantity: 230,000 MT/Year
- Fuel Rate: 420 kg/MWh
- Fuel GHV: 8,100 BTU/LB
- Fuel Cost: $145/MT
- Lube Oil Rate: 0.4 L/MWh
- Incremental Cost for Expansion: $1,150/KW
- Overhaul/Retrofit Cost: $2,800,000
- Year Start of Commercial Operation: 2016
- Overhaul/Retrofit Year After Start: 2026
- Useful Life: 27 Years
- Degradation Rate: 0.4%/Year
- Load Factor: 88%
- Thermal Efficiency: 27%
- FIT Rate: PHP 6.30/kWh
- WESM: $62/MWh
- SRMC: $67/MWh
- LCOE: $87/MWh
- Location: Laguna, Calamba, Barangay Pansol
- Latitude: 14.217, Longitude: 121.171, Elevation: 25 m ASL
- Resource Type: Biomass
- Technology: Integrated Gasification Combined Cycle (IGCC)
- Capacity: 60 MW
- Capital Overnight Cost: $4,200/KW
- Operating Cost: $72/MWh
- Fixed O&M: $65/KW/Year
- Variable O&M: $9/MWh
- Manpower: 75 PAX
- G&A Expenses: $650,000/Year
- Fuel Expense: $57/MWh
- Fuel Quantity: 270,000 MT/Year
- Fuel Rate: 430 kg/MWh
- Fuel GHV: 8,200 BTU/LB
- Fuel Cost: $135/MT
- Lube Oil Rate: 0.6 L/MWh
- Incremental Cost for Expansion: $1,300/KW
- Overhaul/Retrofit Cost: $3,500,000
- Year Start of Commercial Operation: 2017
- Overhaul/Retrofit Year After Start: 2027
- Useful Life: 30 Years
- Degradation Rate: 0.3%/Year
- Load Factor: 92%
- Thermal Efficiency: 30%
- FIT Rate: PHP 6.40/kWh
- WESM: $63/MWh
- SRMC: $68/MWh
- LCOE: $86/MWh
- Location: Batangas, Bauang, Barangay Santo Tomas
- Latitude: 13.881, Longitude: 121.031, Elevation: 12 m ASL
- Resource Type: Biomass
- Technology: Fixed Bed Gasifier
- Capacity: 25 MW
- Capital Overnight Cost: $3,300/KW
- Operating Cost: $83/MWh
- Fixed O&M: $48/KW/Year
- Variable O&M: $13/MWh
- Manpower: 45 PAX
- G&A Expenses: $480,000/Year
- Fuel Expense: $67/MWh
- Fuel Quantity: 190,000 MT/Year
- Fuel Rate: 470 kg/MWh
- Fuel GHV: 7,700 BTU/LB
- Fuel Cost: $155/MT
- Lube Oil Rate: 0.5 L/MWh
- Incremental Cost for Expansion: $950/KW
- Overhaul/Retrofit Cost: $1,800,000
- Year Start of Commercial Operation: 2018
- Overhaul/Retrofit Year After Start: 2028
- Useful Life: 22 Years
- Degradation Rate: 0.5%/Year
- Load Factor: 83%
- Thermal Efficiency: 23%
- FIT Rate: PHP 6.00/kWh
- WESM: $58/MWh
- SRMC: $64/MWh
- LCOE: $89/MWh
- Green Future Biomass Plant
- Location: Rizal, Antipolo, Barangay Dalig
- Latitude: 14.600, Longitude: 121.183, Elevation: 50 m ASL
- Resource Type: Biomass
- Technology: Advanced Stoker Boiler
- Capacity: 55 MW
- Capital Overnight Cost: $3,700/KW
- Operating Cost: $77/MWh
- Fixed O&M: $53/KW/Year
- Variable O&M: $11/MWh
- Manpower: 68 PAX
- G&A Expenses: $600,000/Year
- Fuel Expense: $62/MWh
- Fuel Quantity: 240,000 MT/Year
- Fuel Rate: 440 kg/MWh
- Fuel GHV: 7,900 BTU/LB
- Fuel Cost: $145/MT
- Lube Oil Rate: 0.4 L/MWh
- Incremental Cost for Expansion: $1,100/KW
- Overhaul/Retrofit Cost: $2,700,000
- Year Start of Commercial Operation: 2013
- Overhaul/Retrofit Year After Start: 2023
- Useful Life: 26 Years
- Degradation Rate: 0.5%/Year
- Load Factor: 87%
- Thermal Efficiency: 25%
- FIT Rate: PHP 6.20/kWh
- WESM: $61/MWh
- SRMC: $66/MWh
- LCOE: $84/MWh
- Location: Laguna, Santa Rosa, Barangay Don Jose
- Latitude: 14.301, Longitude: 121.104, Elevation: 30 m ASL
- Resource Type: Biomass
- Technology: Integrated Gasification
- Capacity: 70 MW
- Capital Overnight Cost: $4,300/KW
- Operating Cost: $74/MWh
- Fixed O&M: $68/KW/Year
- Variable O&M: $10/MWh
- Manpower: 80 PAX
- G&A Expenses: $700,000/Year
- Fuel Expense: $58/MWh
- Fuel Quantity: 300,000 MT/Year
- Fuel Rate: 410 kg/MWh
- Fuel GHV: 8,000 BTU/LB
- Fuel Cost: $140/MT
- Lube Oil Rate: 0.7 L/MWh
- Incremental Cost for Expansion: $1,400/KW
- Overhaul/Retrofit Cost: $3,800,000
- Year Start of Commercial Operation: 2019
- Overhaul/Retrofit Year After Start: 2029
- Useful Life: 28 Years
- Degradation Rate: 0.4%/Year
- Load Factor: 90%
- Thermal Efficiency: 29%
- FIT Rate: PHP 6.50/kWh
- WESM: $64/MWh
- SRMC: $69/MWh
- SJC IPOWER Phase I Biomass Plant
- Location: Tarlac, Capas, Barangay Sta. Lucia
- Latitude: 15.451, Longitude: 120.559, Elevation: 25 m ASL
- Resource Type: Biomass
- Technology: Fluidized Bed Combustion
- Capacity: 28 MW
- Capital Overnight Cost: $3,500/KW
- Operating Cost: $82/MWh
- Fixed O&M: $50/KW/Year
- Variable O&M: $14/MWh
- Manpower: 52 PAX
- G&A Expenses: $490,000/Year
- Fuel Expense: $66/MWh
- Fuel Quantity: 210,000 MT/Year
- Fuel Rate: 455 kg/MWh
- Fuel GHV: 7,800 BTU/LB
- Fuel Cost: $152/MT
- Lube Oil Rate: 0.6 L/MWh
- Incremental Cost for Expansion: $1,100/KW
- Overhaul/Retrofit Cost: $2,200,000
- Year Start of Commercial Operation: 2011
- Overhaul/Retrofit Year After Start: 2021
- Useful Life: 22 Years
- Degradation Rate: 0.6%/Year
- Load Factor: 81%
- Thermal Efficiency: 24%
- FIT Rate: PHP 6.10/kWh
- WESM: $56/MWh
- SRMC: $62/MWh
- LCOE: $86/MWh
- SJC IPOWER Phase II Biomass Plant
- Location: Tarlac, Capas, Barangay San Vicente
- Latitude: 15.450, Longitude: 120.555, Elevation: 30 m ASL
- Resource Type: Biomass
- Technology: Moving Grate
- Capacity: 32 MW
- Capital Overnight Cost: $3,600/KW
- Operating Cost: $79/MWh
- Fixed O&M: $55/KW/Year
- Variable O&M: $12/MWh
- Manpower: 58 PAX
- G&A Expenses: $520,000/Year
- Fuel Expense: $63/MWh
- Fuel Quantity: 220,000 MT/Year
- Fuel Rate: 445 kg/MWh
- Fuel GHV: 7,900 BTU/LB
- Fuel Cost: $148/MT
- Lube Oil Rate: 0.5 L/MWh
- Incremental Cost for Expansion: $1,150/KW
- Overhaul/Retrofit Cost: $2,400,000
- Year Start of Commercial Operation: 2014
- Overhaul/Retrofit Year After Start: 2024
- Useful Life: 25 Years
- Degradation Rate: 0.5%/Year
- Load Factor: 84%
- Thermal Efficiency: 26%
- FIT Rate: PHP 6.20/kWh
- WESM: $58/MWh
- SRMC: $64/MWh
- LCOE: $89/MWh
- Location: Bulacan, Malolos, Barangay Longos
- Latitude: 14.794, Longitude: 120.957, Elevation: 12 m ASL
- Resource Type: Biomass
- Technology: Stoker Boiler
- Capacity: 50 MW
- Capital Overnight Cost: $3,800/KW
- Operating Cost: $76/MWh
- Fixed O&M: $60/KW/Year
- Variable O&M: $10/MWh
- Manpower: 65 PAX
- G&A Expenses: $580,000/Year
- Fuel Expense: $61/MWh
- Fuel Quantity: 240,000 MT/Year
- Fuel Rate: 430 kg/MWh
- Fuel GHV: 8,000 BTU/LB
- Fuel Cost: $145/MT
- Lube Oil Rate: 0.5 L/MWh
- Incremental Cost for Expansion: $1,200/KW
- Overhaul/Retrofit Cost: $2,900,000
- Year Start of Commercial Operation: 2015
- Overhaul/Retrofit Year After Start: 2025
- Useful Life: 28 Years
- Degradation Rate: 0.4%/Year
- Load Factor: 88%
- Thermal Efficiency: 27%
- FIT Rate: PHP 6.30/kWh
- WESM: $62/MWh
- SRMC: $68/MWh
- LCOE: $90/MWh
- Location: Pangasinan, Lingayen, Barangay Bacayao Norte
- Latitude: 15.968, Longitude: 120.337, Elevation: 8 m ASL
- Resource Type: Biomass
- Technology: Fluidized Bed Combustion
- Capacity: 27 MW
- Capital Overnight Cost: $3,400/KW
- Operating Cost: $81/MWh
- Fixed O&M: $48/KW/Year
- Variable O&M: $14/MWh
- Manpower: 50 PAX
- G&A Expenses: $470,000/Year
- Fuel Expense: $69/MWh
- Fuel Quantity: 200,000 MT/Year
- Fuel Rate: 470 kg/MWh
- Fuel GHV: 7,600 BTU/LB
- Fuel Cost: $160/MT
- Lube Oil Rate: 0.5 L/MWh
- Incremental Cost for Expansion: $950/KW
- Overhaul/Retrofit Cost: $1,900,000
- Year Start of Commercial Operation: 2012
- Overhaul/Retrofit Year After Start: 2022
- Useful Life: 20 Years
- Degradation Rate: 0.6%/Year
- Load Factor: 80%
- Thermal Efficiency: 22%
- FIT Rate: PHP 6.00/kWh
- WESM: $54/MWh
- SRMC: $60/MWh
- LCOE: $87/MWh
- Location: Nueva Ecija, Cabanatuan City, Barangay Dalipani
- Latitude: 15.482, Longitude: 120.971, Elevation: 15 m ASL
- Resource Type: Biomass
- Technology: Gasification
- Capacity: 42 MW
- Capital Overnight Cost: $3,700/KW
- Operating Cost: $79/MWh
- Fixed O&M: $55/KW/Year
- Variable O&M: $11/MWh
- Manpower: 60 PAX
- G&A Expenses: $540,000/Year
- Fuel Expense: $62/MWh
- Fuel Quantity: 220,000 MT/Year
- Fuel Rate: 420 kg/MWh
- Fuel GHV: 8,100 BTU/LB
- Fuel Cost: $145/MT
- Lube Oil Rate: 0.6 L/MWh
- Incremental Cost for Expansion: $1,200/KW
- Overhaul/Retrofit Cost: $2,600,000
- Year Start of Commercial Operation: 2018
- Overhaul/Retrofit Year After Start: 2028
- Useful Life: 25 Years
- Degradation Rate: 0.5%/Year
- Load Factor: 85%
- Thermal Efficiency: 26%
- FIT Rate: PHP 6.30/kWh
- WESM: $60/MWh
- SRMC: $66/MWh
- LCOE: $85/MWh
- Location: Pampanga, San Fernando, Barangay San Juan
- Latitude: 15.042, Longitude: 120.683, Elevation: 20 m ASL
- Resource Type: Biomass
- Technology: Moving Grate
- Capacity: 30 MW
- Capital Overnight Cost: $3,600/KW
- Operating Cost: $80/MWh
- Fixed O&M: $52/KW/Year
- Variable O&M: $13/MWh
- Manpower: 55 PAX
- G&A Expenses: $500,000/Year
- Fuel Expense: $64/MWh
- Fuel Quantity: 210,000 MT/Year
- Fuel Rate: 450 kg/MWh
- Fuel GHV: 7,900 BTU/LB
- Fuel Cost: $150/MT
- Lube Oil Rate: 0.6 L/MWh
- Incremental Cost for Expansion: $1,100/KW
- Overhaul/Retrofit Cost: $2,500,000
- Year Start of Commercial Operation: 2016
- Overhaul/Retrofit Year After Start: 2026
- Useful Life: 27 Years
- Degradation Rate: 0.5%/Year
- Load Factor: 82%
- Thermal Efficiency: 23%
- FIT Rate: PHP 6.10/kWh
- WESM: $57/MWh
- SRMC: $62/MWh
- LCOE: $88/MWh
- Department of Energy (DOE) Philippines
- Energy Regulatory Commission (ERC) Philippines
- Wholesale Electricity Spot Market (WESM)
- National Grid Corporation of the Philippines (NGCP)
- Department of Science and Technology (DOST) Philippines
- Department of Environment and Natural Resources (DENR) Philippines
- Environmental Management Bureau (EMB) Philippines
- International Energy Agency (IEA)
- United States Department of Energy (US DOE)
- National Renewable Energy Laboratory (NREL)
- International Renewable Energy Agency (IRENA)
- World Bank (WB)
- Asian Development Bank (ADB)
- European Union (EU)
- Paul Breez, Energy Consultant
- M.M. El-Wakil, Energy Researcher
Date? : July 2024, Manila PHILIPPINES
By?? ??? : Marcial T. Ocampo
IF YOU NEED A COPY OF EXCEL PROJECT FINANCE MODELS THAT HAVE THE SAME INPUT
DATA AS ABOVE, PLS MESSAGE ME FOR A DEMO (LOCKED REPORTS) COPY (60 USD) OR A
REAL (UNLOCKED REPORTS) COPY (600 USD) AND USER GUIDE AND WE CAN ARRANGE A
VIRTUAL (ON-LINE) TRAINING ON HOW TO USE EFFECTIVELY MY MODELS FOR EACH
POWER GENERATION TECHNOLOGIES TO SUPPORT YOUR FEASIBILITY STUDIES.
Energy and Power Consultant at OMT ENERGY ENTERPRISES
8 个月BIOMASS POWER PLANTS LUZON GRID